Lubilia Hydroelectric Power Station

Lubilia Power Station
Country Uganda
Location Kawembe, Kasese District
Coordinates 00°05′00″N 29°45′16″E / 0.08333°N 29.75444°E / 0.08333; 29.75444Coordinates: 00°05′00″N 29°45′16″E / 0.08333°N 29.75444°E / 0.08333; 29.75444
Status Proposed
Commission date 2017 (Expected)
Owner(s) Lubilia Kawembe Hydro Limited
Power generation
Nameplate capacity 5.4 MW (7,200 hp)

Lubilia Hydroelectric Power Station, also Lubilia Kawembe Power Station, is a 5.4 MW hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Location

The Power Station is located is located across River Lubilia, in Ihandiro sub-county, Kasese District, in southwestern Uganda, close to the international border with the Democratic Republic of the Congo. This location is near the town of Mpondwe in Uganda, approximately 67 kilometres (42 mi), by road, southwest of Kasese, where the district headquarters are located.[1]

Overview

The power station is a run of river, 5.4 megawatts (7,200 hp), hydropower project across River Lubilia. The development rights to the power station are owned by Lubilia Kawembe Hydro Limited (LKHL). In May 2013, DI Frontier Market Energy & Carbon Fund, acquired majority shareholding in LKHL.[2]

Construction costs

As of December 2016, the estimated construction budget was US$18.7 million, with US$3.2 million in GetFit guarantees.[3]

Construction timetable

In October 2014, the Uganda Electricity Regulatory Authority (ERA), licensed Lubilia Power Station, granting permission to generate and sell 5.4MW of power to the national grid. Construction was expected to begin in December 2014 and last approximately two years.[4] Construction started in March 2016 with completion expected in the fourth quarter of 2017.[3]

See also

References

  1. "Distance Between Mpondwe And Kasese With Map". Globefeed.com. Retrieved 25 October 2014.
  2. "Frontier Investment Management: Lubilia Mini Hydro Power Project". Frontier.Dk. Retrieved 24 October 2014.
  3. 1 2 GetFit Uganda (31 December 2016). "GetFit Uganda 2016 Annual Report: Lubilia Hydroelectric Power Station". GetFit Uganda: GetFit Uganda. Retrieved 15 December 2017.
  4. Sanya, Samuel (22 October 2014). "ERA Licenses 9 Renewable Energy Projects". New Vision. Kampala. Retrieved 24 October 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.