Line 4 (Chengdu Metro)

Line 4
4
Platform of Taisheng Road South
Overview
Type Rapid transit
System Chengdu Metro
Status Operational
Locale Chengdu, Sichuan
Termini Wansheng
Xihe
Stations 30
Services 1
Daily ridership 698,700 (2018 Peak)[1]
Operation
Opened 26 December 2015
Owner Chengdu
Operator(s) Chengdu Metro Limited
Character Underground/Elevated
Technical
Line length 43.3 km (26.91 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 4 of the Chengdu Metro (Chinese: 成都地铁4号线; pinyin: Chéngdū Dìtiě Sì Hào Xiàn) is the third line to enter revenue service on the metro network in Chengdu, Sichuan. Line 4 runs in an east-west direction, stretching from Wansheng in Wenjiang to Xihe in the Longquanyi.[2] The first phase started construction on July 22, 2011, and began operation on 26 December 2015.[3] Testing began on the east of west extensions of Line 4 as part of Phase II expansion on December 10, 2016.[4]

Opening timeline

SegmentCommencementLengthStation(s)Name
Intangible Cultural Heritage Park — Wannianchang 26 December 2015 22.4 km (13.92 mi) 16 Phase 1
Wansheng — Intangible Cultural Heritage Park 2 June 2017 10.8 km (6.71 mi) 8 Phase 2
Wannianchang — Xihe 10.3 km (6.40 mi) 6

Stations

Station name Transfer Distance
km
Location
English Chinese
Wansheng 万盛 0.00 0.00 Wenjiang
Yangliuhe 杨柳河 1.32 1.32
Fengxihe 凤溪河 1.42 2.74
Nanxun Avenue 南熏大道 0.91 3.65
Guanghua Park 光华公园 1.02 4.67
Yongquan 涌泉 1.23 5.90
Fenghuang Street 凤凰大街 1.84 7.74
Machangba 马厂坝 1.52 9.26
Intangible Cultural Heritage Park 非遗博览园 1.63 10.89 Qingyang
Caiqiao 蔡桥 2.30 13.19
Zhongba 中坝 2.15 15.34
West Railway Station 成都西站 Chengdu West railway station Chengduxi 2.20 17.54
Qingjiang Road West 清江西路 2.15 19.69
Cultural Palace 文化宫 7 1.15 20.84
Southwestern University of Finance and Economics 西南财大 1.10 21.94
Caotang Road North 草堂北路 0.75 22.69
CUTCM and Sichuan People's Hospital 中医大省医院 2  5  1.20 23.89
Kuanzhaixiangzi Alleys 宽窄巷子 0.90 24.79
Luomashi 骡马市 1 1.60 26.39
Taisheng Road South 太升南路 1.05 27.44
2nd Chengdu People's Hospital 市二医院 3 1.40 28.84 Jinjiang
Yushuang Road 玉双路  6  1.45 30.29 Chenghua
Shuangqiao Road 双桥路 1.60 31.89
Wannianchang 万年场 0.75 32.64
Huaishudian 槐树店 7 2.13 34.77
Lailong 来龙 2.30 37.07 Longquanyi
Shiling 十陵 1.00 38.07
Chengdu University 成都大学 0.90 38.97
Mingshuwangling 明蜀王陵 1.18 40.15
Xihe 西河 2.82 42.97

References

  1. 戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
  2. 成都地铁4号线一期工程将于12月26日载客运营 2016年1月1日正式开通 (in Chinese). Chengdu Metro. 2015-12-18. Retrieved 2015-12-18.
  3. 成都地铁4号线一期运营筹备工作基本就绪 (in Chinese). Chengdu Metro. 2015-11-11. Retrieved 2015-11-11.
  4. "地铁4号线二期工程全线接触网"电通"". news.ifeng.com. Retrieved 2018-10-07.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.