Line 5 (Chengdu Metro)

Line 5
5
Overview
Type Rapid transit
System Chengdu Metro
Status under consturation
Locale Chengdu, Sichuan
Termini Huazang
Huilong Road
Stations 41
Services 2
Operation
Opened Late 2019
Owner City of Chengdu
Operator(s) Chengdu Metro Corporation
Character Underground and Elevated
Depot(s) Dafeng
Rolling stock Yuanhua, Huilong
Technical
Line length 49.018 km (30.46 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC

Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) runs from Xindu District to Tianfu New District. It starts at Huazang and ends at Huilong Road. The total length is 49.018 km (30.458 mi). Line 5's color is purple. This line began construction on 14 September 2015, is scheduled to be complete on late 2019,[1] from Huazang to Huilong Road. Originally, the line was planned to use 6 car high capacity Type A trains. However, anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential districts, the line was redesigned to allow for expansion to use 8 car A size trains.[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.[3][4]

Stations

Huazang - Qilong
Huazang - Huilong Road

Phase 1

  • Huazang
  • Poshuichang (Planned transfer
      Line 21
    )
  • Liaojiawan
  • Northern Trade city
  • Xinfuqiao
  • Jiudaoyan
  • Dujianian
  • Dafeng (Planned transfer
      Line 1
    )
  • Shixi Park
  • Huanghuayuan
  • Gubai
  • Quanshui Road (Planned transfer
      Line 9
    )
  • Dongzikou
  • Fuing Road
  • Wukiaushi
  • Yujvan
  • Beizhan West No.2 Road (Consturationed transfer )
  • Xibeiqiao (Consturationed transfer
      Line 6
    )
  • Fuqing
  • CUTCM & Sichuan People's Hospital (Transfer
      Line 2
    or
      Line 4
    )
  • Qinyanggong (Planned transfer
      Line 16
    )
  • Provincial orthopaedic hospital (Planned transfer
      Line 17
    )
  • Gaoshengqiao (Transfer
      Line 3
    )
  • Keyuan
  • Jiuxing Avenue (Planned transfer
      Line 8
    )
  • Shenxianshu (Consturationed transfer )
  • Shiyang Flyover
  • Chengdu city No.1 hospital
  • Jiaozi Avenue
  • Jincheng Avenue (Planned transfer
      Line 9
    )
  • Jincheng Lake
  • Dayuan
  • Minle (Planned transfer
      Line 12
    )
  • Qilong (Planned transfer
      Line 6
    )

Phase 2

  • Chengdu Police academy
  • Erjiang Temple
  • Nanhu Flyover
  • Gaofeng
  • Longma Road
  • Huilong Road (Planned transfer
      Line 11
    )
  • South Extsion No Name given

See also

References

  1. 成都地铁5号线设41个站 2019年开通运营 [Chengdu Metro Line 5 str 41 stations To be opens in 2019] (in Chinese). Sichuan News. 21 May 2015. Retrieved 2015-07-04.
  2. 成都地铁5号线将采用“8A”车辆编组 每列车定员2144人_网易新闻. 163.com news. Retrieved 2018-07-04.
  3. 成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都. cd.house.ifeng.com. Retrieved 2016-11-20.
  4. 1号线太挤?“大肚子”5号线救急. 2018-04-18.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.