Line 6 (Chengdu Metro)

Line 6
6
Overview
Type Rapid transit
System Chengdu Metro
Status under construction
Locale Chengdu, Sichuan
Termini Taiqing Road/Sichuan Film and Television College
Guandong Road/Zhengjialin
Stations 47
Services 2
Operation
Opened Late 2020
Owner Chengdu
Operator(s) Chengdu Metro Corporation
Character Underground and Elevated
Technical
Line length 59.2 km (36.79 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC

Line 6 of the Chengdu Metro (Chinese: 成都地铁6号线; pinyin: Chéngdū Dìtiě Lǐu Hào Xiàn) runs from Pi County to Tianfu New District. It starts at Taiqing Road (Sichuan Film and Television College) and ends at Guandong Road (Zhengjialin). The total length is 59.2 km (36.8 mi) with 47 stations. Line 6's color is brown. This line began construction in 2016, with expected completion in late 2020.[1] The line will use high capacity 8 car Type A trains.[2]

Stations

Sichuan Film and Television College - Guandong Road
Taiqing Road - Zhengjialin

Main Line(North/South section)

  • Taiqing Road
  • Wangcongsi
  • Bitong Town
  • Business Street
  • Nanbei Avenue
  • Tianjian Road
  • Zhuqiao Road
  • Guangchang Road (Planned transfer
      Line 21
    )
  • Chengdu Textile College
  • Xipu (Transfer
      Line 2
    )
  • SJU Xipu Campus
  • Zichuanggong Temple
  • Hujiaqiao
  • Shangfuhe (Planned transfer
      Line 9
    )
  • Sichuan Film and Television College
  • Happy Valley
  • Liujianian
  • Changning Road
  • Southwest Jiaotong University (transfer )
  • Xiaohuayuan(Little Garden)
  • Xibeiqiao (Consturation transfer
      Line 5
    )
  • Renmin Road North (Transfer
      Line 1
    )
  • Jiefang Road
  • Qianfeng Road (Transfer
      Line 3
    or planned
      Line 15
    )
  • Jianshe Road North
  • Xinhong Road North
  • Yushuang Road (Transfer
      Line 4
    )
  • Niuwangmiao (Transfer
      Line 2
    )
  • Shunjiang Road
  • Shanguantang (Planned transfer
      Line 13
    )
  • Shaheqiao (Planned transfer
      Line 8
    )
  • Liulichang (Shahepu,Consturation transfer )
  • Liushan intersection
  • Yinjiaqiao
  • Financial Center East (Planned transfer
      Line 9
    )
  • Zhonghe
  • South Outer circle Road South
  • Shuanglu Road (Planned transfer
      Line 12
    )
  • Guandong Road (Planned transfer
      Line 11
    )

South Extension (Planned)

  • Xinchuang Techlogy Park North
  • Heying Avenue
  • Huafu Avenue (Transfer
      Line 1
    )
  • No name given
  • Qilong (Consturation transfer
      Line 5
    )
  • No name given
  • Zhengjialin

See also

References

  1. 地铁6号线二期工程的站点位置也已确定 (in Chinese). Sina Sichuan. 19 May 2015. Retrieved 2015-07-04.
  2. 成都地铁5、6号线将使用A型车 单列车厢容量更大_网易新闻. 163.com news. Retrieved 2018-07-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.