Line 18 (Chengdu Metro)
Line 18 | |
---|---|
18 | |
Overview | |
Type | Rapid transit |
System | Chengdu Metro |
Status | Under construction |
Locale | Chengdu, Sichuan |
Termini |
Chengdu South Railway Station Chengdu Tianfu International Airport |
Stations | 14 |
Services | 1 |
Operation | |
Planned opening | Mid 2020 |
Owner | City of Chengdu |
Operator(s) | Chengdu Metro Corporation |
Character | Underground and Elevated |
Technical | |
Line length | 59.27 km (36.83 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) or New Airport Express Line (新机场快线; 新機場快線; Xīn Jīchǎng Kuàixiàn) is an express subway line that runs from Gaoxin District to Jianyang City. The line is envisioned to serve as a express service for Line 1. The first and second phases start at Chengdu South Railway Station and end at Chengdu Tianfu International Airport. The total length is 59.27 km (36.83 mi). New Airport Express Line began construction on late 2015 and is scheduled for completion by mid 2020.[1] The line will use cityrail 8 Car Type A trains which have features designed for medium distance travel, such as a 140 km/h service speed and wide station spacing.[2] The line will also feature distinct express and local services with an Airport Express service stopping only at two intermediate stations and planned to complete a trip between Chengdu South Railway Station to Chengdu Tianfu International Airport in 35 minutes. The local service will stop at all stations on Line 18 and will complete the trip in 40 to 50 minutes.[3] Line 18's color is teal. The line officially started construction on August 16, 2016.[4]
Stations
Service
routes |
Station name | Connections | ||
---|---|---|---|---|
L | EX | English | Chinese | |
● | ● | Chengdu South Railway Station | 火车南站 | 1 7 |
● | Incubation Park | 孵化园 | 1 | |
● | Jincheng Square | 锦城广场 | 1 | |
● | Century City | 世纪城 | 1 | |
● | Haichang Road | 海昌路 | 1 | |
● | ● | Western China Int'l Expo City | 西博城 | 1 6 |
● | Xinglong | 兴隆 | ||
● | ● | Tianfu New Railway Station | 天府新站 | |
● | Sancha | 三岔 | ||
● | Futian | 福田 | ||
● | ● | Terminal 3 & 4 of Tianfu International Airport | 天府机场3号4号航站楼 | |
● | ● | Terminal 1 & 2 of Tianfu International Airport | 天府机场1号2号航站楼 |
Future Development
Phase III of Line 18
Line 18 is planned to extend north to Chengdu railway station serving downtown Chengdu and providing full parallel express service along the core portion of Line 1. The length of the extension is about 11.2 kilometers with 5 new stations.[5]
See also
References
- ↑ 成都轨道交通18号线一期设计时速140公里 连接新机场 [Chengdu Rail Transit Line 18 Phase 1 design tempo 140km/h Content New Airport] (in Chinese). Netease Nowe. 7 June 2016. Retrieved 2016-07-04.
- ↑ 网易. "今年将新开通运营地铁46公里". news.163.com. Retrieved 2018-10-07.
- ↑ "成都地铁18号线明年开工 19号线直连新旧两机场 -四川新闻-四川新闻网". scnews.newssc.org. Retrieved 2018-10-06.
- ↑ "成都地铁18号线一期工程昨日正式开工-Chengdu Municipal Development and Reform Commission". www.cddrc.gov.cn. Retrieved 2018-10-07.
- ↑ "成都轨道交通18号线三期工程可行性研究及勘察设计总承包招标公告---四川日报". epaper.scdaily.cn. Retrieved 2018-10-07.