Soyuz at the Guiana Space Centre

Soyuz ST (Guiana Space Centre)
Inaugural launch
Function Provide Arianespace with a medium-class launch vehicle to compliment the light Vega and heavy Ariane 5
Manufacturer Progress State Research and Production Rocket Space Center, NPO Lavochkin
Country of origin Russia
Size
Height 46.2 m (152 ft)
Diameter 10.3 m (34 ft)
Mass 308 t (303 long tons; 340 short tons)
Stages 3
Capacity
Payload to GTO 3,250 kg (7,170 lb)
Payload to GEO 1,440 kg (3,170 lb)
Payload to SSO 4,400 kg (9,700 lb)[1]:43
Associated rockets
Family Soyuz 2 (R-7)
Launch history
Status Active
Launch sites Guiana Space Centre
Total launches 18
Successes 17
Failures 0
Partial failures 1
First flight 21 October 2011[2]
Boosters
No. boosters 4[1]:21
Length 19.6 m (64 ft)
Diameter 2.68 m (8 ft 10 in)
Empty mass 3,784 kg (8,342 lb)
Gross mass 44,413 kg (97,914 lb)
Engines 1 RD-107A
Thrust 838.5 kN (188,500 lbf)
Specific impulse 262s
Burn time 118s
Fuel LOX / Kerosene
Core stage
Length 27.1 m (89 ft)
Diameter 2.95 m (9 ft 8 in)
Empty mass 6,545 kg (14,429 lb)
Gross mass 99,765 kg (219,944 lb)
Engines 1 RD-108A
Thrust 792.5 kN (178,200 lbf)
Specific impulse 255s
Burn time 286s
Fuel LOX / Kerosene
Second stage (ST-B)
Length 6.7 m (22 ft)
Diameter 2.66 m (8 ft 9 in)
Empty mass 2,355 kg (5,192 lb)
Gross mass 27,755 kg (61,189 lb)
Engines 1 RD-0124
Thrust 297.9 kN (67,000 lbf)
Specific impulse 359s
Burn time 270s
Fuel LOX / Kerosene
Upper stage – Fregat
Length 1.5 m (4 ft 11 in)
Diameter 3.35 m (11.0 ft)
Empty mass 920 kg (2,030 lb)
Gross mass 7,558 kg (16,663 lb)
Engines S5.92
Thrust 19.85 kN (4,460 lbf) / 14 kN (3,100 lbf)
Specific impulse 332s
Burn time up to 1100s (maximum 20 burns)
Fuel N2O4 / UDMH

Soyuz at the Guiana Space Centre (also known as Soyuz at CSG or Arianespace Soyuz) is an ongoing ESA programme for operating Soyuz-ST launch vehicles from Guiana Space Centre (CSG), providing medium-size launch capability for Arianespace to accompany the light Vega and heavy-lift Ariane 5.[3] The Soyuz vehicle is supplied by the Russian Federal Space Agency with TsSKB-Progress and NPO Lavochkin, while additional components are supplied by Airbus, Thales Group and RUAG.[1]:28–30

The Arianespace Soyuz project was announced by the ESA in 2002. Cooperation with Russia began in two areas: construction of a launch site for Soyuz in CSG and development of the Soyuz launch vehicle modified for the Guiana Space Centre. A Programme Declaration was signed in 2003 and funding along with final approval was granted on 4 February 2005.[4][5] Initial excavation for the Ensemble de Lancement Soyouz (ELS; Soyuz Launch Complex) began in 2005, construction started in 2007, and the launch complex was completed in early 2011,[6] allowing Arianespace to offer launch services on the modified Soyuz ST-B to its clients.[1][7] Two early flights, VS02 and VS04, and a recent flight, VS17, used the Soyuz ST-A variant.[8][9][10] Since 2011, Arianespace has ordered a total of 23 Soyuz rockets, enough to cover its needs until 2019 at a pace of three to four launches per year.[11][12]:10

Features of modified Soyuz for the Guiana Space Centre

  • First use of a mobile service tower at the ELS that enabled vertical payload integration.[1]
  • European supplied payload adapters.[1]
  • European supplied KSE (French: Kit de Sauvegarde Européenne, lit. 'European Safeguard Kit'), a system to locate and transmit a flight termination signal.[1] It would activate the engine shutdown command and leave the vehicle in a ballistic trajectory.[13]
  • Adaptation of the S-Band telemetry system on all stages from the 5 TM bands available at Baikonur, and Plesetsk to the 3 allowed at the GSC range.[1]
  • Adaptation of the S-Band telemetry coding and frequency to the IRIG standard used at GSC.[1]
  • Adaptation of the oxygen purge system for directing to the outside of the mobile gantry.[1]
  • Adaptation to the tropical GSC climate including the adaptation of the air conditioning system to local specifications and protective measures to avoid icing.[1] All holes and cavities were studied and certified to be adequately protected against intrusion of insects and rodent.[13]
  • The four boosters and the core stage were upgraded with pyrotechnic devices to breach the fuel tanks to assure that they would sink in the ocean. The other stages were shown to lose structural integrity on impact and thus proven to sink.[13]
  • At least initially, the boosters and core stage would use the pyrotechnically ignited 14D22 (RD-107A) and 14D23 (RD-108A) rather than the chemically ignited 14D22 kHz and 14D23 kHz used on the rest of the Soyuz-2.[13]

Vehicle processing

Soyuz components arrive at the CSG via ship, and are unloaded and placed in a storage area. From there, the components are brought to the Launch Vehicle Integration Building where they're assembled horizontally in an air-conditioned environment. First four boosters are attached to the core stage, and then third stage is attached to the core – identical to the procedure at Baikonur and Plesetsk Cosmodrome. Separately, the payload is mounted on a dispenser in a Payload Processing Facility and then transferred into the S3B building to be mounted to the Fregat upper stage and then encapsulated in a fairing. Subsequently, the first 3 stages of the Soyuz-ST are transported from the Integration Building to the launch pad by a train which also erects the rocket to the vertical position at the pad, where Soyuz is suspended by four support arms. Once vertical, a mobile gantry moves in and encloses Soyuz. Following that the encapsulated Fregat and payload is lifted vertically by a mobile gantry to be mounted on top of Soyuz. The Mobile Gantry is retracted an hour before the launch.[14][15][16][17][18]

Future developments

Arianespace plans to operate Soyuz until at least the end of 2019, and as of 2014 intended to continue operating Soyuz alongside the planned Ariane 6 when that launcher makes its debut.[11][19] However, the announcement of new Ariane 6 designs from Airbus and Safran opens the possibility of Ariane 6.2 replacing Soyuz.[20]

Launch history

Inaugural flight

The first contract for the launch of Soyuz ST-B from Guiana Space Centre was signed at the 2009 Paris Air Show by the Director of the Galileo Programme and Navigation-related Activities René Oosterlinck and a CEO of Arianespace Jean-Yves Le Gall. This contract covered 2 launches of two Galileo satellites each.[21] The contract for the satellites themselves had already been signed by ESA and Galileo Industries in 2006.[22]

Launch vehicle components shipped from Saint Petersburg first arrived in French Guiana by ship in November 2009.[23] The Soyuz Launch Site acceptance review took place during the last week of March 2011, leading to the first simulated launch campaign between 29 April and 4 May.[6][24] The launch site was officially handed over from ESA to the Arianespace on 7 May 2011.[25]

Assembly of the Soyuz ST-B begun on 12 September 2011 in the Assembly and Testing building, while two Galileo satellites underwent final tests after their arrival from Thales Alenia Space facilities in Italy on 7 and 14 September.[26] The launch was planned for 20 October, however an anomaly was detected in the pneumatic system responsible for disconnecting the fuel lines from Soyuz third stage, forcing the mission to be postponed for 24 hours. On 21 October 2011, 7:30 local time, Soyuz ST-B took off for its inaugural, 3 hour 49 minute, flight,[27] making it the first time Soyuz was launched outside of the former Soviet Union territory.[28]

Flight VS09

On 22 August 2014 Arianespace launched the first two Full Operational Capability satellites for the Galileo satellite navigation constellation into Medium Earth orbit.[29] The mission appeared to proceed normally and Arianespace reported the launch to be a success, however analysis of telemetry data provided by ESA and CNES tracking stations showed that the satellites were injected into an incorrect orbit.[30]

OrbitInclinationEccentricity
Targeted23,222 km x 23,222 km55.0°0
Achieved25,900 km x 13,713 km49.8°0.23

The orbit was determined by the European Space Operations Centre within 3 hours after the separation from launcher, and the satellites were operating normally and under control.[31] Both satellites were switched to safe mode, pointing at the sun while both ESA/CNES and OHB teams investigated the failure and options for the satellites.[32] On 25 August Arianespace announced the creation of an independent inquiry commission to investigate the anomaly.[33] On 28 August details emerged on the events that most likely led to the Fregat failure. At the end of the re-orientation phase the flight control system detected an incorrect angular speed and unsuccessfully attempted to use thrusters to correct the situation. The flight control system did not detect the thruster issue and continued the flight plan with the upper stage oriented in a wrong direction, leaving the satellites in an incorrect orbit.[34]

In late September the Roscosmos commission report, quoted by Izvestia, indicated that the Fregat failure was due to a design flaw leading to freezing in one of the hydrazine propellant lines, which was placed alongside a line carrying cold helium used for pressurization of the main propellant tanks. During the long first burn required for Galileo orbital insertion the propellant line was cooled to below the freezing point of hydrazine. Further investigations were focused on the software error and a means to prevent similar failures in future. Izvestia also reported that the failure of flight VS09 caused a serious reaction in Russian government. Oleg Ostapenko, Head of Roscosmos, had a "difficult conversation in the (Moscow) White House".[35][36]

On 7 October 2014 the Independent Inquiry Board announced the conclusions of its investigation, revealing that a proximity of helium and hydrazine feed lines resulted in a thermal bridge that caused an interruption of propellant supply to the thrusters. Ambiguities in the design documents allowing this to happen were a result of not taking into account thermal transfers in the thermal analyses of the stage system design. Board recommended 3 corrective actions: Revamping thermal analysis, correcting design documents and modification of manufacture, assembly, integration and inspection procedures of the supply lines.[37]

In November, ESA announced the satellites will perform a total of 15 orbital maneuvers to raise their perigee to 17,339 km. This will reduce the satellites' exposure to the Van Allen radiation belt, reduce the Doppler effect, increase satellite visibility from the ground, and allow the satellites to keep their antennas pointed at Earth during perigee. These orbits will repeat the same ground track every 20 days, allowing synchronization with other Galileo satellites which repeat the same ground track every 10 days. Once in their new orbits the satellites can begin in-orbit testing.[38]

Recovery of the satellites concluded in March 2015, when Galileo-FOC FM2 entered a new orbit, mirrored to the orbit of Galileo-FOC FM1, which concluded its manoeuvres on the end of November 2014 and successfully passed testing. Currently satellites overfly the same location on the ground every 20 days, comparing to 10 days of standard Galileo satellites.[39]

Missions

Date
& time (local time)
Flight Payload Payload mass Orbit Result No.
2011-10-21 07:30:26VS01[2]Galileo IOV-1/21,580 kg (3,480 lb)MEOSuccess1
2011-12-16 23:03:48VS02[40]Pleiades 1, SSOT, 4 x ELISA2,191 kg (4,830 lb)SSOSuccess2
2012-10-12 15:15:01VS03[41]Galileo IOV-3/41,580 kg (3,480 lb)MEOSuccess3
2012-12-01 23:02:50VS04[42]Pléiades 1B1,070 kg (2,360 lb)SSOSuccess4
2013-06-25 16:27:03VS05[43]O3b F13,204 kg (7,064 lb)MEOSuccess5
2013-12-19 06:12:19VS06[44]Gaia2,105 kg (4,641 lb)L2Success6
2014-04-03 18:02:26VS07[45]Sentinel-1A2,272 kg (5,009 lb)SSOSuccess7
2014-07-10 15:55:56VS08[46]O3b F23,204 kg (7,064 lb)MEOSuccess8
2014-08-22 09:27:11VS09[29]Galileo FOC FM1/FM21,607 kg (3,543 lb)MEOPartial failure[47]9
2014-12-18 15:37:00VS10[48]O3b F33,184 kg (7,020 lb)MEOSuccess10
2015-03-27 18:46:19VS11[49]Galileo FOC FM3/FM41,597 kg (3,521 lb)MEOSuccess11
2015-09-11 23:08:10VS12[50]Galileo FOC FM5/FM61,601 kg (3,530 lb)MEOSuccess12
2015-12-17 08:51:56VS13[51]Galileo FOC FM8/FM91,603 kg (3,534 lb)MEOSuccess13
2016-04-25 18:02:13VS14[52]Sentinel-1B,[53] MICROSCOPE, 3 CubeSats3,099 kg (6,832 lb)SSOSuccess14
2016-05-24 05:48:43VS15[54]Galileo FOC FM10/FM111,599 kg (3,525 lb)MEOSuccess15
2017-01-27 22:03:34VS16 Hispasat 36W-13,200 kg (7,100 lb)GTOSuccess16
2017-05-18 08:54:53VS17[55] SES-152,302 kg (5,075 lb)GTOSuccess17
2018-03-09 14:10:06VS18[56] O3b F42,800 kg (6,200 lb)MEOSuccess18

All times above are local times in French-Guyana (UTC −3)

Scheduled flights

Date
& time (local time)
Flight Payload Payload mass Targeted
Orbit
Result No.
2018 (TBD) MetOp-C[57]SSOPlanned19
2018 (TBD) OneWeb × 10LEOPlanned20
Late 2018 (TBD) CHEOPS, COSMO-SkyMed[58]SSOPlanned21

Statistics

Flights by Mission Result
1
2
3
4
2011
2012
2013
2014
2015
2016
2017
2018

  Success     Failure     Partial Failure   Scheduled  

Soyuz launch statistics from Guiana as of May 2017. Source: data from wikitable Missions, wikitable Scheduled flights and Arianespace website.

Launch sequence

Launch complex with withdrawn mobile gantry

Typically, operations 3 days before launch include countdown rehearsal for all stages as well as final preparations and verification of the Fregat upper stage. Two days before launch preparations for fueling begin. This is also the last day when pre-launch activity with the payload can occur.[59] The launch sequence is optimized for each mission, the sequence described here is based on flight VS07 which lifted the Sentinel-1A satellite:[18][60]

T MinusEventAltitude
T- 06:30:00Mission control team B on a console, beginning of a network countdown
T- 04:50:00State Commission meeting giving fueling authorization
T- 04:00:00Beginning of fueling
T- 03:00:00Payload switched to pre-launch mode
T- 02:20:00Readiness report
T- 01:45:00End of fueling
T- 01:21:00GO / NO-GO roll-call
T- 01:00:00Mobile gantry withdrawal
T- 00:10:00Payload switches to onboard power supply
T- 00:06:10Beginning of autosequence
T- 00:05:00Fregat switches to onboard power supply
T- 00:01:00Activation of automatic launch sequence
T- 00:00:40Launcher switches to onboard power supply
T- 00:00:20Lower stage umbilical mast withdrawal
T- 00:00:17Main engine ignition
T- 00:00:15Preliminary thrust level
T- 00:00:03Maximum thrust level
T+ 00:00:00Liftoff
T+ 00:01:11Max Q
T+ 00:01:58Boosters separation60 km (37 mi)
T+ 00:03:29Fairing separation120 km (75 mi)
T+ 00:04:472nd stage separation240 km (150 mi)
T+ 00:04:482nd stage ignition
T+ 00:04:53Aft section separation (connects 1st with 2nd stage)
T+ 00:08:46Fregat upper stage separation
T+ 00:09:46Fregat ignition410 km (250 mi)
T+ 00:20:04Fregat shutdown
T+ 00:23:29Payload separation693 km (431 mi)

References

  1. 1 2 3 4 5 6 7 8 9 10 11 "Soyuz from the Guiana Space Centre – User's manual" (PDF). Arianespace. March 2012. Retrieved 16 December 2015.
  2. 1 2 "A Historic Launch For Arianespace: First Soyuz Mission From Guiana Space Center A Success; First Two Galileo Satellites In Orbit" (Press release). Arianespace. 21 October 2011. Retrieved 17 December 2015.
  3. "Arianespace takes official delivery from ESA of the Soyuz launch complex at the Guiana Space Center" (Press release). Arianespace. 7 May 2011. Archived from the original on 7 July 2011. Retrieved 24 August 2014.
  4. "Access to space today and tomorrow: what does Europe need?". Space Daily. 26 May 2003. Retrieved 24 August 2014.
  5. "Europe takes key decisions to ensure the long-term viability of its launcher sector". Arianespace. 5 February 2004. Archived from the original on 12 December 2010. Retrieved 24 August 2014.
  6. 1 2 "Soyuz launch site ready for first flight". ESA. 1 April 2011. Retrieved 23 August 2014.
  7. Stephen Clark (21 August 2014). "Europe's Galileo navigation system set for expansion". Spaceflight Now. Retrieved 27 August 2014.
  8. "VS02 Launch kit" (PDF). Arianespace. Retrieved 16 December 2015.
  9. "VS04 Launch kit" (PDF). Arianespace. Retrieved 16 December 2015.
  10. "VS17 Launch kit" (PDF). Arianespace. Retrieved 8 September 2017.
  11. 1 2 "Arianespace's Soyuz order to cover market until 2019". Spaceflight Now. 7 April 2014. Retrieved 24 August 2014.
  12. "Arianespace Annual report 2013" (PDF). Arianespace. Archived from the original (PDF) on 3 September 2014. Retrieved 24 August 2014.
  13. 1 2 3 4 Zak, Anatoly (23 August 2015). "Soyuz-2 launch vehicle (14A14)". RussianSpaceWeb. Retrieved 24 August 2015.
  14. Arianespace (10 July 2014). "[Soyuz] Processing Highlights of Soyuz VS-08 Mission with O3b Satellites". Retrieved 24 August 2014.
  15. "Soyuz launch site > Preparation area". Arianespace. Archived from the original on 16 August 2014. Retrieved 25 August 2014.
  16. "Soyuz is in the launch zone for its August 21 mission to loft the first two Galileo FOC satellites". Arianespace. 18 August 2014. Retrieved 16 December 2015.
  17. "Inspecting the Soyuz facilities". ESA. 24 September 2014. Retrieved 25 August 2014.
  18. 1 2 Daniel Scuka (3 April 2014). "Sentinel-1A launch timeline". ESA. Retrieved 19 August 2014.
  19. Israël, Stéphane (19 March 2014). "One-on-one with the chief executive of Arianespace" (Interview). Interviewed by Stephen Clark. Spaceflight Now. Retrieved 25 August 2014.
  20. Jonathan Amos (5 July 2014). "Ariane 6: Customers call the shots". BBC News. Retrieved 25 August 2014.
  21. "Galileo IOV launch services contract signed". ESA. 16 June 2009. Retrieved 23 August 2014.
  22. "Galileo program implementation begins". Thales Group. 19 January 2006. Retrieved 23 August 2014.
  23. "Shipment of first two Soyuz to French Guiana readies Arianespace for the growth of its launch vehicle family". Arianespace. 7 November 2009. Archived from the original on 8 November 2013. Retrieved 23 August 2014.
  24. "First Soyuz almost ready for launch from French Guiana". ESA. 4 May 2011. Retrieved 23 August 2014.
  25. "ESA hands over keys to Soyuz launch site". ESA. 7 May 2011. Retrieved 23 August 2014.
  26. "Countdown to Europe's first Soyuz launch under way". ESA. 20 September 2011. Retrieved 23 August 2014.
  27. "A new countdown for Soyuz' first flight from the Spaceport". Arianespace. 20 October 2011. Archived from the original on 23 December 2011. Retrieved 23 August 2014.
  28. "Soyuz rocket prepares for first launch from French Guiana". The Guardian. 19 October 2011. Retrieved 23 August 2014.
  29. 1 2 "First two operational satellites in the Galileo constellation (Galileo FOC M1, SAT 5–6), the European Union's flagship program, successfully launched by Arianespace (VS 09 – Soyuz)" (Press release). 22 August 2014. Retrieved 16 December 2015.
  30. "Galileo satellites experience orbital injection anomaly on Soyuz launch: Initial report" (Press release). 23 August 2014. Retrieved 16 December 2015.
  31. "Team of teams". ESA. 8 September 2014. Retrieved 18 September 2014.
  32. "Update on Galileo launch injection anomaly". 26 August 2014. Retrieved 27 August 2014.
  33. "VS09 flight: Arianespace names independent inquiry commission" (Press release). 25 August 2014. Retrieved 16 December 2015.
  34. Anatoly Zak; George Chambers (30 August 2014). "Galileo network: Complex failure scenario emerges". RussianSpaceWeb. Retrieved 3 September 2014.
  35. "Frozen Propellant Line found to be Cause of Galileo Launch Failure". Spaceflight101. 26 September 2014. Archived from the original on 21 August 2014. Retrieved 2 October 2014.
  36. Иван Чеберко (19 September 2014). "В падении "Союз-СТ-Б" обвинили конструкторов НПО имени Лавочкина" [Lavochkin designers accused for a failure of "Soyuz-ST-B"] (in Russian). Izvestia. Retrieved 2 October 2014.
  37. "Soyuz Flight VS09: Independent Inquiry Board announces definitive conclusions concerning the Fregat upper stage anomaly" (Press release). Evry: Arianespace. 8 October 2014. Retrieved 16 December 2015.
  38. "Galileo satellite set for new orbit". SpaceRef. 10 November 2014. Retrieved 10 November 2014.
  39. "Sixth Galileo satellite reaches corrected orbit". ESA. 13 March 2015. Archived from the original on 23 April 2016. Retrieved 23 July 2015.
  40. "Arianespace VSO2 mission: Soyuz STA orbits Pleiades 1A, ELISA and SSOT" (Press release). 17 December 2011. Retrieved 16 December 2015.
  41. "Arianespace flight VS03: Soyuz ST-B orbits two Galileo IOV-2 satellites" (Press release). 12 October 2012. Retrieved 16 December 2015.
  42. "Arianespace's fourth Soyuz mission a success: Pléiades 1B in orbit" (Press release). 1 December 2012. Retrieved 16 December 2015.
  43. "Arianespace launch VS05 > Soyuz ST-B – O3b: Mission accomplished!" (Press release). 25 June 2013. Retrieved 16 December 2015.
  44. "Arianespace successfully launches the Gaia scientific satellite" (Press release). 19 December 2013. Retrieved 16 December 2015.
  45. "Arianespace boosts Sentinel-1A Earth observation satellite into orbit" (Press release). 3 April 2014. Retrieved 16 December 2015.
  46. "Arianespace launches O3b satellites on Soyuz mission" (Press release). 10 July 2014. Retrieved 16 December 2015.
  47. "VS09 Soyuz launch: Galileo satellites orbital injection anomaly" (Press release). Arianespace. 22 August 2014. Retrieved 16 December 2015.
  48. "Arianespace launch a success, orbiting four more satellites in the O3b constellation" (Press release). 18 December 2014. Retrieved 16 December 2015.
  49. "Arianespace expands Europe's Galileo global navigation satellite system with its latest Soyuz success" (Press release). 27 March 2015. Retrieved 16 December 2015.
  50. "Arianespace successfully launches two satellites in the Galileo constellation" (Press release). Arianespace. 27 March 2015. Retrieved 16 December 2015.
  51. "Arianespace's Latest Galileo Mission A Success: Soyuz Launcher Orbits Two More Satellites In The Constellation" (Press release). 17 December 2015. Retrieved 17 December 2015.
  52. "Flight VS14 – A successful Arianespace launch with Soyuz, supporting sustainable development, fundamental physics and promoting space careers" (Press release). Arianespace. 25 April 2016.
  53. "Sentinel-1". ESA. Retrieved 23 January 2016.
  54. "Arianespace orbits two more Galileo satellites" (Press release). Arianespace. 24 May 2016.
  55. "The 40th SES satellite orbited by Arianespace is lofted on its latest Soyuz mission success". Arianespace. Arianespace. Retrieved 18 May 2017.
  56. "Mission Description". Arianespace. Arianespace. Retrieved 9 March 2018.
  57. Krebs, Gunter. "METOP A, B, C". Gunter's Space Page. Retrieved 8 April 2017.
  58. Clark, Stephen (7 April 2017). "Italian radar satellite, European exoplanet telescope to launch on Soyuz next year". Spaceflight Now. Retrieved 8 April 2017.
  59. "Soyuz > Launch operations". Arianespace. Archived from the original on 2 May 2014. Retrieved 19 August 2014.
  60. Stephen Clark (4 April 2014). "Mission Status Center – Soyuz Launch Report". Spaceflight Now. Retrieved 19 August 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.