New Glenn

The New Glenn (named after John Glenn) is a heavy-lift orbital launch vehicle in development by Blue Origin. Design work on the vehicle began in 2012. Illustrations of the vehicle, and the high-level specifications, were initially publicly unveiled in September 2016. New Glenn is described as a two-stage rocket with a diameter of 7 meters (23 ft). Its first stage will be powered by seven BE-4 engines that are also being designed and manufactured by Blue Origin.

New Glenn
Illustration of the New Glenn
FunctionPartially reusable orbital launcher
ManufacturerBlue Origin
Country of originUnited States
Size
Height98 m (322 ft)[1]
Diameter7 m (23 ft)
Stages2
Capacity
Payload to LEO45,000 kg (99,000 lb)[2][3]
Payload to GTO13,000 kg (29,000 lb)[2][3]
Associated rockets
Comparable
Launch history
StatusIn development
Launch sitesCape Canaveral LC-36 Vandenberg Air Force Base
First flight2021 (planned)[4]
First stage
Diameter7 m (23 ft)
Engines7 × BE-4
Thrust17.1 MN (3,850,000 lbf)
FuelCH4 / LOX
Second stage
Diameter7 m (23 ft)
Engines2 × BE-3U
Thrust1,400 kN (320,000 lbf)
FuelLH2 / LOX

Like the New Shepard suborbital launch vehicle that preceded it, the New Glenn's first stage is designed to be reusable.[5] Blue Origin aims to launch New Glenn in 2021.[4]

History

After initiating the development of an orbital rocket system prior to 2012, and stating in 2013 on their website that the first stage would do a powered vertical landing and be reusable,[6] Blue Origin publicly announced their orbital launch vehicle intentions in September 2015.[7] In January 2016, Blue Origin indicated that the new rocket would be many times larger than New Shepard even though it would be the smallest of the family of Blue Origin orbital vehicles.[8] Blue Origin publicly released the high-level design of the vehicle—and announced the name New Glenn—in September 2016.[5]

Early development work on orbital subsystems

Blue Origin began developing systems for orbital human spacecraft prior to 2012. A reusable first-stage booster was projected to fly a suborbital trajectory, taking off vertically like the booster stage of a conventional multistage rocket. Following stage separation, the upper stage would continue to propel astronauts to orbit while the first-stage booster would descend to perform a powered vertical landing similar to its New Shepard suborbital vehicle. The first-stage booster was to be refueled and relaunched to reduce costs of access for humans to space.[6]

The booster rocket was projected to lift Blue Origin's biconic Space Vehicle capsule to orbit, carrying astronauts and supplies. After completing its mission in orbit, the Space Vehicle was designed to reenter Earth's atmosphere and land under parachutes on land, to be reused on future missions.[6]

Engine testing for the (then named) Reusable Booster System (RBS) launch vehicle began in 2012. A full-power test of the thrust chamber for Blue Origin BE-3 liquid oxygen/liquid hydrogen upper-stage rocket engine (BE-3U) was conducted at a NASA test facility in October 2012. The chamber successfully achieved full thrust of 100,000 pounds-force(about 440 kN).[9] By early 2018,[10] it was announced that the BE-3U hydrolox engine would power the second stage of the New Glenn.[11]

Orbital launch vehicle

Design work on the vehicle began in 2012, with the beginning of BE-4 engine development. Further plans for an orbital launch vehicle were made public in 2015. By March 2016, the rocket was referred to by the placeholder name of "Very Big Brother".[12][13] It was stated to be a two-stage-to-orbit liquid-propellant rocket,[7] with the launcher intended to be reusable.[14] In early 2016, Blue Origin indicated that the first orbital launch was expected no earlier than 2020 from the Florida launch facility,[13] and in September 2017 continued to forecast a 2020 debut.[15]

The vehicle itself, and the high-level specifications, were initially publicly unveiled in September 2016. New Glenn was described as a 7-meter-diameter (23 ft), two- or three-stage rocket, with the first and second stages being liquid methane/liquid oxygen (methalox) designs using Blue Origin engines. The first stage is reusable and will land vertically, just like the New Shepard suborbital launch vehicle that preceded it. Although these plans would subsequently change, the 2016 plans called for the first stage to be powered by seven of Blue Origin's BE-4 single-shaft oxygen-rich staged combustion[16] liquid methane/liquid oxygen rocket engines, the second-stage to be powered by a single vacuum-variant of the BE-4 (BE-4U) and the third stage to use a single BE-3 hydrolox engine.[5] Blue Origin announced that they intended to launch the rocket from Launch Complex 36, and manufacture the rockets at a new facility being built after 2015 on nearby land in Exploration Park. Acceptance testing of the BE-4 engines was also announced to be planned for Florida.[14]

Blue explained in the 12 September 2016 announcement that the rocket would be named New Glenn in honor of the first American astronaut to orbit the Earth, John Glenn.[5][17]

Three weeks of wind tunnel testing of a scale model New Glenn were completed in September 2016 in order to validate the CFD design models of transonic and supersonic flight.[18][19]

In March 2017, Jeff Bezos showed graphics of the New Glenn which had two large strakes at the bottom of the booster.[20] In the September 2017 announcement, Blue announced a much larger payload fairing for New Glenn, this one 7 meters (23 ft) in diameter, up from 5.4 meters (18 ft) in the originally announced design.[15]

By March 2018 the launch vehicle design had changed. It was announced that the New Glenn second stage will now be powered by two vacuum versions of the flight proven BE-3 liquid hydrogen/liquid oxygen rocket engine (BE-3U) with a single BE-3U engine for the third stage deep space option. (A single BE-3 engine is being used in the suborbital New Shepard rocket.[10])

By mid-2018, the low-level design was not yet complete and the likelihood of achieving an initial launch by 2020 was being called into question by company engineers, customers, industry experts, and journalists.[21][22]

In October 2018, the Air Force announced Blue Origin was awarded $500 million for development of New Glenn as a potential competitor in future contracts, including EELV Phase 2.[23]

In January 2019, the three stage booster variant was announced as no longer planned to be offered as an option.[24] In February 2019, Blue indicated that no plans to build a reusable second stage are even on the company's roadmap.[25]

By February 2019, multiple launches for New Glenn had been contracted: five for OneWeb, an unspecified amount of Telesat, one each for Eutelsat, mu Space Corp and SKY Perfect JSAT.[26][27][15][28][11]

Description and technical specifications

The first hotfire-tested Blue Origin BE-4 rocket engine, serial number 103, at the 34th Space Symposium in Colorado Springs, Colorado, April 2018, showing the liquid methane inlet side of the engine.

The New Glenn is a 7-meter-diameter (23 ft) two-stage orbital launch vehicle with a reusable first stage[11] and an expendable second stage.[25] An optional third stage was envisaged with a single BE-3U engine, and was planned as of October 2018.[29]

The first stage is designed to be reusable for up to 100 missions,[2][3] and will land vertically, a technology previously developed by Blue Origin and tested in 2015–2016 on its New Shepard suborbital launch vehicle. The second stage will share the same diameter as the first and use two BE-3U vacuum optimized engines. It will use hydrogen/oxygen as propellant and will be expendable. This engine is manufactured by Blue Origin. The company has revealed the planned full operational payload capacity of the two-stage version of New Glenn as 13,000 kg (29,000 lb) to GTO and 45,000 kg (99,000 lb) to a 51.6-degree inclined LEO,[2] though the initial operating capability may be somewhat lower.[29] Dual-satellite launches will be offered after the first five flights.[30]

Both stages will use orthogrid aluminum tanks with welded aluminum domes and common bulkheads. Both stages will also use autogenous pressurization.[29] The first stage will be powered by seven BE-4 methane/oxygen engines—designed and manufactured by Blue Origin—producing 17,000 kN (3,800,000 lbf) of liftoff thrust.[2] The second stage will be powered by two BE-3U engines, also designed and manufactured by Blue Origin. BE-3Us are an expander cycle variant of the BE-3 engine, which are explicitly designed for use in upper stages.[31] Preliminary design numbers from 2015 projected the BE-3U to have a vacuum thrust of 670 kilonewtons (150,000 lbf).[32]

Launches of the New Glenn are planned to be made from Spaceport Florida Launch Complex 36, which was leased to Blue Origin in 2015.[5][13] A launch site at Vandenberg Air Force Base is also planned.[26] New Glenn will also be available for space tourism flights, with priority given to customers of New Shepard.[33] The first stage boosters of New Glenn are intended to be reusable, and will be recovered downrange on the Atlantic Ocean via the Blue Origin landing platform ship acting as a floating movable landing platform. The hydrodynamically-stabilized ship increases the likelihood of successful recovery in rough seas.[11]

Manufacturing

The main assembly of the New Glenn launch vehicle will occur in the Blue Origin rocket manufacturing facility in Florida, near Launch Complex 36 which the company leased from Spaceport Florida.

Tooling and equipment for the factory began to be ordered and built in 2015. In July 2018, the build of the largest device, a 16-meter-tall (51 ft) × 41-meter-long (136 ft) × 13-meter-wide (43 ft) Ingersoll "Mongoose" cryogenic-tank and fairing fabrication machine, was completed after a three-year design/build process. It will be installed in the Florida facility in Exploration Park later in 2018.[34] As of September 2018, Blue had invested over US$1 billion in its Florida manufacturing facility and launch site, and intends that much more going forward.[11] [35]

Launch services

Blue will offer both single-payload dedicated flights and, after the fifth launch, dual-manifesting of large commsats to be transported to geostationary transfer orbit.[36]

All contracted launches from the start will feature a reusable first-stage, so just like the practice in commercial aircraft transport, landing conditions can affect the timing and flight parameters of a launch.[36]

Launch service customers

By 2018, Blue Origin had contracts in place with four customers for New Glenn flights. Eutelsat, Thailand startup mu Space Corp and SKY Perfect JSAT have geosynchronous orbit commsat launches planned after 2020, while internet satellite constellation fleet operator OneWeb has an agreement for five launches.[27][28][37]

In January 2019, Telesat signed a multi-launch contract "to launch satellites for its future low-Earth-orbit broadband constellation on multiple New Glenn missions" and thus is Blue's fifth customer.[38]

Schedule-oriented launch cadence

Blue intends to contract for launch services a bit differently than contract options that have been traditionally offered in the commercial launch market. The company has stated they will contract to aim to have a regular launch cadence of up to eight times a year. If one of the payload providers for a multi-payload launch is not ready on time, Blue will hold to the launch timeframe, and fly the remaining payloads on time at no increase in price.[36]

This is different from how dual-launch manifested contracts have been traditionally handled by Arianespace (Ariane V and Ariane 6) and Mitsubishi Heavy Industries (H-IIA and H3). SpaceX and International Launch Services can offer dual-launch contracts, but prefer dedicated missions.[36]

Funding

The development and manufacture of the New Glenn is being funded by Jeff Bezos, founder of Amazon.com, and the US Air Force.[5][39] New Glenn will receive $500 million in funding under the National Security Space Launch (NSSL) program.[40] By September 2017, Bezos had invested US$2.5 billion into New Glenn.[15]

See also

References

  1. "Inside look at the New Glenn 7 meter fairing".
  2. Berger, Eric (March 7, 2017). "Blue Origin releases details of its monster orbital rocket". Ars Technica. Retrieved March 8, 2017.
  3. Foust, Jeff (March 7, 2017). "Eutelsat first customer for Blue Origin's New Glenn". SpaceNews.
  4. Boyle, Alan (October 10, 2018). "Blue Origin resets schedule: First crew to space in 2019, first orbital launch in 2021". GeekWire. Retrieved January 28, 2019.
  5. Bergin, Chris (September 12, 2016). "Blue Origin introduce the New Glenn orbital LV". NASASpaceFlight.com. Retrieved September 13, 2016.
  6. "About Blue". Blue Origin. Archived from the original on 25 March 2013. Retrieved 5 April 2013.
  7. Foust, Jeff (September 15, 2015). "Bezos Not Concerned About Competition, Possible ULA Sale". Space News. Retrieved September 16, 2015.
  8. Howell, Elizabeth (February 29, 2016). "Blue Origin: Quiet Plans for Spaceships". Space.com. Retrieved March 5, 2016. [Blue Origin is] already more than three years into development of our first orbital vehicle ... Though it will be the small vehicle in our orbital family, it's still many times larger than New Shepard. [we] hope to share details about this first orbital vehicle this year
  9. "Blue Origin tests 100k lb LOX/LH2 engine in commercial crew program". NewSpace Watch. October 16, 2012. Retrieved October 17, 2012.
  10. "Blue Origin switches engines for New Glenn second stage". SpaceNews.com. March 29, 2018. Retrieved March 30, 2018.
  11. Burghardt, Thomas (September 20, 2018). "Building on New Shepard, Blue Origin to pump a billion dollars into New Glenn readiness". NASASpaceFlight.com. Retrieved September 22, 2018.
  12. Berger, Eric (March 9, 2016). "Behind the curtain: Ars goes inside Blue Origin's secretive rocket factory". Ars Technica. Retrieved March 9, 2016.
  13. Boyle, Alan (March 5, 2016). "Jeff Bezos lifts curtain on Blue Origin rocket factory, lays out grand plan for space travel that spans hundreds of years". GeekWire. Retrieved March 9, 2016.
  14. Harwood, William (September 15, 2015). "Jeff Bezos plans to boost humans into space from Cape Canaveral". CBS News. Retrieved September 17, 2015. Bezos: "You cannot afford to be a space-fairing civilization if you throw the rocket away every time you use it. ... We have to be focused on reusability, we have to be focused on lowering the cost of space."
  15. Henry, Caleb (September 12, 2017). "Blue Origin enlarges New Glenn's payload fairing, preparing to debut upgraded New Shepard". SpaceNews. Retrieved October 25, 2017.
  16. Clark, Stephen (September 17, 2014). "ULA taps Blue Origin for powerful new rocket engine". Spaceflight Now. Retrieved April 8, 2015.
  17. Victor, Daniel (September 12, 2016). "Meet New Glenn, the Blue Origin Rocket That May Someday Take You to Space". The New York Times. Retrieved September 13, 2016.
  18. Boyle, Alan (September 26, 2016). "Jeff Bezos says Blue Origin's New Glenn orbital rocket aces wind tunnel tests". GeekWire. Retrieved October 11, 2016.
  19. Bezos, Jeff (September 26, 2016). "Exciting results..." Twitter.com. Retrieved October 25, 2016.
  20. Jeff Bezos' interview at SATELLITE 2017 (23 min), circa March 2017.
  21. Johnson, Eric M. (August 2, 2018). "Bezos throws cash, engineers at rocket program as space race accelerates". Reuters. Retrieved August 4, 2018.
  22. Berger, Eric (July 24, 2018). "Four huge rockets are due to debut in 2020—will any make it?". Ars Technica. Retrieved August 6, 2018. a sense of urgency in Europe about the need to begin flying the Ariane 6 to become more competitive with the likes of SpaceX ... Like ArianeGroup, United Launch Alliance (ULA) has developed a new rocket with the intention to compete with SpaceX.
  23. Erwin, Sandra (October 10, 2018). "Air Force awards launch vehicle development contracts to Blue Origin, Northrop Grumman, ULA - SpaceNews.com". SpaceNews.com. Retrieved October 11, 2018.
  24. Wall, Mike; January 22, Space com Senior Writer; ET, 2019 07:07am. "Blue Origin Video Shows Off Updated Design of Huge New Glenn Rocket". Space.com. Retrieved January 28, 2019.
  25. Foust, Jeff [@jeff_foust] (February 12, 2019). "Mowry: reusing the second stage of New Glenn is not on our roadmap right now; really hard problem technically. #CST2019" (Tweet). Retrieved December 11, 2019 via Twitter.
  26. Clark, Stephen. "Telesat taps Blue Origin to launch broadband satellite fleet – Spaceflight Now". Retrieved February 4, 2019.
  27. "Blue Origin signs up third customer for New Glenn". SpaceNews.com. September 26, 2017. Retrieved January 28, 2019.
  28. "Blue Origin's orbital rocket in the running to receive U.S. military investment – Spaceflight Now". spaceflightnow.com. Retrieved April 28, 2018.
  29. "New Glenn Payload User Guide". Blue Origin. October 2018.
  30. Henry, Caleb (July 12, 2018). "Blue Origin to offer dual launch with New Glenn after fifth mission". Space News. Retrieved July 12, 2018.
  31. BE-3 test update, Blue Origin, August 10, 2018, accessed August 15, 2018].
  32. Meyerson, Rob (November 13, 2015). ISPCS 2015 Keynote (Speech). ISPCS. Retrieved November 14, 2015.
  33. Berger, Eric (October 6, 2016). "Blue Origin just validated the new space movement". Ars Technica.
  34. Guerrero, Isaac (July 17, 2018). "Rockford-made machine to build parts for next-generation rockets". Rockford Star. Retrieved August 3, 2018. It took three years to design and manufacture the Sasquatch-sized machine, which stands 51 feet tall, 136 feet long and 43 feet wide. The machine ... will manufacture cryogenic tanks that will be filled with liquid oxygen and hydrogen to fuel rockets. The machine also will build fairings
  35. "New Glenn First Stage Tank Production". Blue Origin. March 5, 2020.
  36. Henry, Caleb (July 12, 2018). "Blue Origin to offer dual launch with New Glenn after fifth mission". SpaceNews. Retrieved August 5, 2018. Blue Origin’s McFarland said Blue Origin won’t let schedule disruptions with one payload impact the co-passenger in dual-launch missions, even if it means splitting the missions in two. “We are not going to [let this] hold back or delay a launch,” he said. “We are going for a cadence of up to eight times per year where we will launch. If we don’t have a second, we still go as a single. So that’s the plan, [with] the same price point for the launch service for the customer.”
  37. Henry, Caleb (March 12, 2018). "Blue Origin signs Sky Perfect JSAT as fourth New Glenn launch customer". Space News. Retrieved June 28, 2018.
  38. Henry, Caleb (January 31, 2019). "Telesat signs New Glenn multi-launch agreement with Blue Origin for LEO missions". SpaceNews. Retrieved February 2, 2019.
  39. Berger, Eric (September 12, 2016). "Why Bezos' rocket is unprecedented—and worth taking seriously". Ars Technica. Retrieved September 20, 2016.
  40. "Air Force awards three Launch Service Agreements". U.S. Air Force. Retrieved January 28, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.