Sungai Buloh–Serdang–Putrajaya MRT line

Sungai Buloh–Serdang–Putrajaya line
 12 
Rapid KL (brand)
MRT SSP Platform 3 at SBK04 Kwasa Damansara
Overview
Native name MRT Laluan Sungai Buloh–Serdang–Putrajaya
Type Rapid transit
System KVMRT Line 2 (MRT2)Cityflo 650 CBTC
Status Under construction
Termini Kwasa Damansara
Kampung Batu (Phase 1)
Putrajaya Sentral (Phase 2)
Stations 37
Services Sungai BulohKuala LumpurSerdangPutrajaya
Line number  12  Gold
Website mymrt.com.my
Operation
Planned opening Phase 1: July 2021 (2021-07)
Kwasa DamansaraKampung Batu
Phase 2: July 2022 (2022-07)
Kampung BatuPutrajaya Sentral
Owner Mass Rapid Transit Corporation (MRT Corp)
Operator(s) Rapid Rail Sdn Bhd (Prasarana Malaysia Berhad)
Conduction system Automated and driverless
Depot(s) Sungai Buloh Depot & Serdang Depot
Rolling stock 58 Hyundai Rotem four-car trains
Proposed rolling stock image
Technical
Line length 52.2 km (32.4 mi)
Elevated: 38.75 km (24.08 mi)
Underground: 13.5 km (8.4 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification Third rail, 750 VDC
Route map

The MRT Sungai Buloh–Serdang–Putrajaya line will be the twelfth rail transit line, the fourth fully automated and driverless rail system in Klang Valley area. It is a part of the larger rail transport system in Kuala Lumpur known as Greater KL/Klang Valley Integrated Transit System. The line is numbered 12 and coloured gold on transit map.

It is one of three planned rail lines under Klang Valley Mass Rapid Transit Project by MRT Corp. The Phase 1 between Kwasa Damansara and Kampung Batu expected to be operational by July 2021. The remaining line is expected to be operational in 2022.

The approved rail alignment is 52.2km in length, of which 13.5km is underground. A total of 37 stations, 11 of them underground, will be built. The line will stretch from Sungai Buloh to Putrajaya and will include densely populated areas Sri Damansara, Kepong, Batu, Jalan Sultan Azlan Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya. It is expected to have a ridership of 533,000 passengers per day once completed.

Chronology

SBK04 Kwasa Damansara cross-platform interchange station between Sungai Buloh–Kajang Line and the Sungai Buloh–Serdang–Putrajaya line will commence in 2021.
SBK04 Kwasa Damansara station Level 2 island platform
SBK04 Kwasa Damansara level and platform signage, showing platforms 3 and 4 dedicated for the Sungai Buloh–Serdang–Putrajaya line.
Tun Razak Exchange Station Sungai Buloh–Serdang–Putrajaya line future platform
  • 13 October 2014 – The 2nd MRT line is now planned to be from Sungai Buloh, Selayang to Pandan;[1] instead of from Kuala Lumpur to Port Klang.[2][3][4]
  • 3 December 2014 – During a briefing of the 1st MRT line, the MRT CEO revealed more details about the 2nd line. He had said that the line will be 59.5 km long with 49.3 km will be elevated and 10.2 km will be underground. There will be 40 stations where 31 will be elevated and 9 will be underground. Construction is expected to begin by November 2015 will approval and public discussion starts in early 2015.[5][6]
  • 12 February 2015 – MRT Corp prepares tender for MRT2, project display in Q2.[7]
  • 16 March 2015 – MRT2 from Sungai Buloh to Putrajaya has been approved by the Federal government.[8] The project was allocated RM23 billion in the Budget 2015.[9]
  • 2 April 2015 – New alignment for MRT2 proposed.[10] The alignment south of Tun Razak Exchange was then altered drastically to provide connectivity with the proposed High Speed Rail project. With this revision, the line stands at 52.2 km long with a total of 36 stations. Of these, 11 are underground while 25 are elevated.
  • 22 April 2015 – Department of Environment (DOE)'s Detailed Environment Impact Assessment (DEIA) for MRT2 (SSP Line) (Sungai Buloh-Serdang-Putrajaya Line) is available for download from their website.
  • 14 May 2015 – Details of MRT2 project on public display start on 15 May 2015. The public can visit the SPAD office, MRT Corp offices, Kuala Lumpur City Hall, Selayang Municipal Council and Petaling Jaya City Council, with roadshows, primarily at shopping malls near the MRT2 alignment.[11]
  • 12 August 2016 – On the MRT2 project, the groundbreaking ceremony was expected to be held at end of the month of August 2016 or early September 2016. [12]
  • 15 September 2016 – Construction on the SSP line launched with a groundbreaking ceremony at the site of the future Putrajaya Sentral MRT station by former Prime Minister Dato' Seri Najib Tun Razak.[13]
  • 31 March 2017 – The line is 5.3% completed. [14]
  • 24 May 2017 – 7.5% of the line was completed. For the elevated section, progress of the first and second packages are at 20.9% and 10.3% respectively with increased works being seen from Jalan Kuala Selangor to Jalan Kepong. Whereas for underground works, the work progress was at 8.7%. [15]
  • June 2017 – The line is 10.25% completed, based on the video released by MRT Corp in 18 December 2017.
  • 5 September 2017 – The line has reached the completion of 12.05% and expected to reach 19% by the end of 2017. The underground works will commence by the first quarter of 2018 with the arrival of 2 Tunnel Boring Machine (TBMs) within 2-3 weeks and another 2 of them by early next year. [16][17]
  • 26 September 2017 – The project director Datuk Amiruddin Ma’aris mentioned the line is currently achieved completion of 13.70%. [18]
  • 28 September 2017 – According to the MRT Corp director of underground works for the SSP line, Blaise Mark Pearce, 23% of the underground works for the SSP Line were expected to be completed by the end of 2017. [19]
  • 10 October 2017 – An explosion has occurred at the Mass Rapid Transit (MRT) station construction site in Bandar Malaysia. According to the police, it was believed that the explosion happened because of an old unexploded bomb from the Second World War through the initial investigation. Three Bangladesh workers were seriously injured and two of them lost their legs while another suffered injuries on the hands and legs. [20]
  • 13 October 2017 – Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) has won the prestigious “Be Inspired Awards 2017” for its use of Building Information Modelling (BIM) in the construction of MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line. [21]
  • 13 November 2017 – The first Tunnel Boring Machine arrived in Port Klang and delivered to site. The rest are expected to arrive in coming weeks. [22]
  • 18 December 2017 – MRT Corp released a video describing the progress of the SSP line from 2016 to 2017 in YouTube. The progress is described in packages. The progress statistics are: 23.68%, 15.43%, 9.05%, 10.32%, 35.31% and 11.51% respectively for packages V201, V202, V203, V210, Serdang Depot and underground. [23]
  • 1 January 2018 – Malaysia's 1st shopping mall, Ampang Park, is officially ceased its operation in order to make way to the construction of the Ampang Park station under such line.
  • 18 February 2018 – The line has achieved 21% completion. The final Tunnel Boring Machine for the SSP Line is expected to be launched by mid-2019. [24]
  • 1 March 2018 – Underground works commenced with the first Tunnel Boring Machine. The launching is done at the shaft located at the Bandar Malaysia North MRT station. The line has achieved 22% completion according to the CEO of the MRT Corp, Datuk Seri Shahril Mokhtar. [25]
  • 3 March 2018 – A construction worker died while two others survived when a launching gantry at an MRT construction site in Jalan Jinjang (Work Package V203), collapsed at around 11:40pm. [26]
  • 23 April 2018 – The Director of Strategic Communications and Stakeholder Relations from MRT Corp, Dato' Najmuddin Abdullah, says the line is now completed at the progress of more than 24%. [27]
  • 11 July 2018 – The line was close to 30% complete as at early July, according to the project director Datuk Amiruddin Ma’aris. [28]

Stations

Following the initial proposal during the public display period, 37 stations have been approved along 52.2 km of track.[29]

The stations listed below are as displayed on the government website for the draft environmental impact assessment.[30] All the station names are interim and subject to change.

28 (23 elevated + 1 half-sunken + 4 underground) out of 35 stations (excluding the ones in MRT Sungai Buloh-Kajang Line) are expected to have feeder bus services.

Code Working Name Platform type Position Park & Ride Feeder Bus Interchange/Notes
 SBK04 Kwasa DamansaraStacked IslandElevated N/AKwasa Damansara station, along with the adjoining Sungai Buloh and Kampong Selamat stations are on the SBK Line. However, once operations commence on the SSP Line, these three stations will be annexed by the SSP Line, thus making Kwasa Damansara the interchange station between SBK and SSP Line.
 SBK03 RRISideElevated- -Reserved station
 SBK02 Kampung SelamatSideElevatedN/A 1 line from SBK

(T104)

The famous beverage store, Tealive can be found in this station.
 SBK01  KA09 Sungai BulohIslandElevated 5 lines from SBK (T100, T101, T102, T103, T105)Exit paid area station to Port Klang Line and KTM ETS services.
Stage 1 (Opening July 2021)
 SSP01 Damansara DamaiIslandElevatedN/A
 SSP02 Sri Damansara WestIslandElevated
 SSP03 Sri Damansara EastSideElevated
 SSP04  KA08 Kepong SentralIslandElevated Exit paid area station to Port Klang Line.
 SSP05 Metro PrimaIslandElevatedN/A
 SSP06 Kepong BaruIslandElevatedN/A
 SSP07 JinjangIslandElevated
 SSP08 Sri DelimaIslandElevatedN/A
 SSP09  KC03 Kampung BatuIslandElevatedN/A Exit paid area station to Seremban Line.
 SSP10  KC02 KentonmenSideElevated Exit paid area station to Seremban Line. As for the news in March 2018, this station will be the terminus for Phase 1 instead of Kampung Batu.
Stage 2 (Opening July 2022)
 SSP11 Jalan IpohIslandHalf-sunkenN/A
 SSP12 Sentul WestIslandUndergroundN/A Interchange with proposed Circle Line.
 SSP13  SP3  AG3  MR11 TitiwangsaIslandUndergroundN/A N/AInterchange station with Ampang Line, Sri Petaling Line and KL Monorail.
 SSP14 Hospital Kuala LumpurIslandUndergroundN/A N/A
 SSP15 Kampung Baru NorthIslandUndergroundN/A N/A
 SSP16  KJ09 Ampang ParkStackedUndergroundN/A N/AInterchange station with LRT Kelana Jaya Line.
 SSP17 KLCC EastStackedUndergroundN/A N/A
 SSP18 ConlayIslandUndergroundN/A N/A
 SSP19   SBK20 Tun Razak ExchangeStacked IslandUndergroundN/A 1 line from SBK

(T407)

Located nearby the proposed Kuala Lumpur International Financial District (KLIFD)[31]
Cross-platform interchange with Sungai Buloh–Kajang Line.
 SSP20   AG11  SP11 Chan Sow LinIslandUndergroundN/A Interchange with Ampang Line & Sri Petaling Line.
 SSP21 Bandar Malaysia NorthIslandUndergroundN/A
 SSP22 Bandar Malaysia SouthIslandUndergroundN/A Interchange with proposed KLSG HSR line, KTM and KLIA Transit.
 SSP23 Kuchai LamaIslandElevated
 SSP24 Taman Naga EmasIslandElevated
 SSP25  SP16 Sungai BesiSideElevated Interchange with Sri Petaling Line.
 SSP25A Technology ParkIslandElevated Provisional station
 SSP26 Serdang Raya NorthIslandElevated
 SSP27 Serdang Raya SouthIslandElevated
 SSP28 Seri KembanganIslandElevatedN/A
 SSP29 Universiti Putra MalaysiaIslandElevated
 SSP30 Taman UniversitiSideElevated- -Provisional station
 SSP31 Equine ParkIslandElevated
 SSP32 Taman Putra PermaiIslandElevatedN/A
 SSP33 16 SierraIslandElevatedN/A
 SSP34 Cyberjaya NorthIslandElevated
 SSP35 Cyberjaya City CentreIslandElevatedN/A
 SSP36  KT3  Putrajaya SentralIslandElevated Interchange with KLIA Transit & proposed Putrajaya Monorail.

Station Concepts[32]

The proposed design for the elevated stations is based on the “Serambi” concept. This concept is focused on inspiring interaction/ communication at a foyer/ entrance space of a house, hall,.i.e. entrance space at a “rumah kampung” or “rumah panjang”. The design opted is a simple. timeless design: which is derived from various design concepts, including that of the Japanese “Zen” concept. Other aspects include open space, natural lighting & ventilation, and natural visual effects via play of lighting & shadows.

Compared to the Sungai Buloh-Kajang (SBK) Line elevated station design, the columns have been pushed to the sides of the station, giving the station an open and airy feel.

Whereas for underground stations, each of them will carry its own individual theme. The proposed designs range from preserving the rustic, reflecting tidal rhythm, promotiong well-being, vibrancy, pulse of life, discovering culture, molding forms, inspired by nature to streamlined flow.

Rolling stock

The rolling stock will be provided by HAP Consortium which consists of Hyundai Rotem, Apex Communications and POSCO Engineering. The trains are assumed to be driverless with a capacity of 1,200 passengers in a 4-car trainsets formation.[33]

Car length (over coupler): 18.6 m to 20.1 m

Number of passenger doors per car side / door width: 4 / 1400 mm

Traction power supply: 750 VDC, 3rd rail

Exact rolling stock details have not yet been released.

The 4-car trainsets will be maintained at 2 purpose built facilities, Sungai Buloh and Serdang depots, located nearby Kwasa Damansara and the proposed Taman Universiti stations respectively.[34]

References

  1. "Original plan was for new MRT2 to start from Sg Buloh and not Selayang". The Star Online.
  2. "Draft Urban Rail Development Plan" (PDF). Draft Greater KL/ Klang Valley Land Public Transport Master Plan. SPAD. Retrieved 2012-02-22.
  3. "Gamuda, MMC likely to get RM24.9bil KVMRT 2 tunnelling job". The Star. 2013-05-15.
  4. "KVMRT Line 2". KVMRT. 2013-05-19.
  5. Ch'ng, Brenda (3 December 2014). "Building of new MRT second line to begin next November". The Star. Star. Star Publication. Retrieved 3 December 2014.
  6. "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online.
  7. "MRT Corp prepares tender for Line 2, project display in Q2". thestar.com.my.
  8. "MRT Line 2 from Sg Buloh to Putrajaya gets green light". The Rakyat Post.
  9. "Budget 2015: Boon for construction". The Star Online.
  10. "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online.
  11. "Details of MRT2 project on public display tomorrow". The Star Online.
  12. "MRT Corp to submit Line 3 study to govt by year-end – Business News | The Star Online". www.thestar.com.my. Retrieved 2016-08-17.
  13. "PM launches RM32b second MRT line to turn Klang Valley into world class city". 2016-09-15. Retrieved 2017-06-01.
  14. "MMC Gamuda Media Statement" (PDF). MRT SUNGAI BULOH – SERDANG – PUTRAJAYA LINE PROGRESSING AS SCHEDULED. 27 Feb 2017.
  15. "Mini buses, cycle facilities proposed to boost MRT usage - Metro News | The Star Online". www.thestar.com.my. Retrieved 2018-03-04.
  16. beritanasionalrtm rasmi (2017-09-04), MRT SSP - 4 MESIN TBM BARU DAN 8 SEDIA ADA AKAN MULA PENGGALIAN 2018 [5 SEPT 2017], retrieved 2017-09-22
  17. "MRT Corp: Tunnelling work for SSP line to start next year". www.thesundaily.my. Retrieved 2018-03-04.
  18. "Sentul police quarters make way for MRT SSP line, occupants to get new units". NST Online. 2017-09-26. Retrieved 2018-03-04.
  19. "MRT2 tunnelling works to be improved with new TBM machines". www.thesundaily.my. Retrieved 2018-03-04.
  20. "Blast at MRT construction site caused by World War 2 bomb". NST Online. 2017-10-11. Retrieved 2018-03-04.
  21. "MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line's technology wins award". NST Online. 2017-10-13. Retrieved 2018-03-04.
  22. MYMRTUNDERGROUND (2017-11-28), KVMRT LINE 2 SSP PROGRESS VIDEO NO.1 (AUG 2016 to NOV 2017), retrieved 2018-03-04
  23. MRTMalaysia (2017-12-18), MRT SSP Line Project Progress Video (2016-2017), retrieved 2018-03-04
  24. "MRT SSP Line work on track". www.thesundaily.my. Retrieved 2018-03-04.
  25. "MRT Corp saves 15% cost from refurbished TBMs". themalaysianreserve.com. Retrieved 2018-03-04.
  26. "Worker killed as launching gantry collapses at MRT construction site [NSTTV]". NST Online. 2018-03-04. Retrieved 2018-03-04.
  27. "MRT Line 2 at 24% completion, ahead of schedule (Updated)". www.thesundaily.my. Retrieved 2018-04-25.
  28. "MRT Sg Buloh line 30% done - Business News | The Star Online". www.thestar.com.my. Retrieved 2018-07-12.
  29. http://www.doe.gov.my/eia/wp-login.php?redirect_to=http%3A%2F%2Fwww.doe.gov.my%2Feia%2Feia-reports-under-review-peia-deia%2F&reauth=1
  30. http://ekas.doe.gov.my/ekas/eia/download_under_approved.php?s_JENIS_LAPORAN=DEIA&s_NEGERI=10&ID=13380
  31. https://www.youtube.com/watch?v=kXdbG7I7_dQ#t=31s
  32. "Stations". MRT Corp. Retrieved 2018-03-04.
  33. http://www.thestar.com.my/business/business-news/2016/05/12/mrcb-ijm-apex-among-winners-of-rm4b-mrt-line-2-jobs/
  34. Progress Report (PDF). MRT Corp. 2012. p. 13. Archived from the original (PDF) on 2016-03-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.