Line 10 (Chengdu Metro)

Line 10
10
Platform of Huaxing station
Overview
Type rapid transit
System Chengdu Metro
Status Operational
Locale Chengdu, Sichuan
Termini Taipingyuan
Terminal 2 of Shuangliu International Airport
Stations 6
Services 2
Daily ridership 106,800 (2018 Peak)[1]
Operation
Opened 6 September 2017
Owner City of Chengdu
Operator(s) Chengdu Metro Corporation
Character underground and elevated
Technical
Line length 10 km (6.21 mi) (current)
38.2 km (23.74 mi) (total)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification overhead lines, 1,500 V DC

Line 10 of the Chengdu Metro (simplified Chinese: 成都地铁10号线; traditional Chinese: 成都地鐵10號線; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) or Airport Express Line (机场快线; 機場快線; Jīchǎng Kuàixiàn) runs from Wuhou District to Shuangliu District/Xinjin County. It starts at Taipingyuan and ends at Airport T2/Nanhe. Its total length is 38.2 km (23.7 mi). Line 10's color is sky. Phase I of Airport Express Line began construction in July 2014 and opened on September 2017. Phase II began construction in 2016 and is expected to be ready by 2020.[2] from Taiping yuan to Airport T2/Nanhe. It is the first line in Chengdu Metro to use 6-car Type A coaches for service.

Opening timeline

SegmentCommencementLengthStation(s)Name
Taipingyuan — Terminal 2 6 September 2017 10.0 km (6.21 mi) 6 Phase 1

Stations

Station name Transfer Distance
km
Location
English Chinese
Taipingyuan 太平园 3 7 0.00 0.00 Wuhou
Cujin 簇锦 1.92 1.92
Huaxing 华兴  9  1.65 3.57
Jinhua 金花  12  3.33 6.90
Terminal 1 of Shuangliu International Airport 双流机场1航站楼 Chengdu Shuangliu International Airport CTU 1.95 8.85 Shuangliu
Terminal 2 of Shuangliu International Airport 双流机场2航站楼  19  Chengdu Shuangliu International Airport CTU Shuangliu Airport railway station IPW 1.15 10.00

Phase II

stationChineseTransfers
Shuangliu West双流西站3 17 (planned) Shuangliu West railway station IQW
Yingtiansi Temple应天寺
Huangshui黄水
Huayuan花源
Xinjin新津
Huaqiao花桥
Wujin五津
Rulinlu儒林路11 (planned)
Liujianian刘家碾
Xinping新平

References

  1. 戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
  2. 成都地铁10号线开始站后施工 预计2017年通车 (in Chinese). Sichuan online. 2 June 2016. Retrieved 2016-07-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.