Proterra, Inc.

Proterra, Inc., is an American automotive and energy storage company based in Burlingame, California. The company designs and manufactures electric transit buses and electric charging systems. Proterra's Catalyst series includes transit buses ranging from 35 feet (11 m) to 40 feet (12 m) in length and various battery configurations. Buses are charged through an overhead charging station that is placed at maintenance facilities as well as route terminals.

Proterra, Inc.
Private
IndustryAutomotive
Founded2004 (2004) in Golden, Colorado
HeadquartersBurlingame, California
Area served
North America
Key people
Ryan Popple (CEO)
Amy Ard (CFO)
Number of employees
433 (2019)[1]
Websitewww.proterra.com

History

Proterra, Inc., was founded in Golden, Colorado, by Dale Hill in 2004. Hill had previously founded TransTeq, a Denver, Colorado, bus manufacturing company that built CNG hybrid buses throughout the 1990s, as well as Alumatech, a manufacturing company that made aluminum dump trailers.

Following the Federal Transit Administration (FTA)'s push for alternative fuels and forms of mobility through such programs as the Clean Fuels Grant Program Bus and Bus Facilities,[2] and the TIGER and TIGGER programs, Hill wanted go beyond the success of his CNG buses that launched the world's first fleet of alternative fuel buses at the 16th Street Mall in Denver, Colorado. He wanted to create a company that would take the lead in creating zero-emission, U.S.-based transit buses.

This was particularly important since many of the programs, including the Clean Fuels Grant Program[3] and the TIGGER[4] program, either exclude CNG buses and facilities, explicitly require capital investments that assist in reducing the energy consumption of a transit agency, and/or reduce greenhouse gas emissions of a transit agency.

In February 2010, Proterra announced that it would move its manufacturing plant from Golden, Colorado to Greenville, South Carolina due to its close proximity to Clemson University International Center for Automotive Research (CU-ICAR).[5] In October 2011, the company announced it would consolidate all operations in Greenville, moving management and research teams from Colorado.[6]

Ryan Popple, formerly of Tesla Motors, was appointed CEO in 2014.[7]

In 2015, Proterra was awarded a $3 million grant from the California Energy Commission to fund the design, development and construction of the company's battery-electric transit bus manufacturing line in the City of Industry, California.

Proterra moved its headquarters from Greenville, South Carolina, to Burlingame, California, in October 2015.[8]

As of January 2017, the company has sold more than 375 buses to municipal, corporate and university transit agencies in 20 states.

In September 2018, Daimler invested $155 million in Proterra.[9][10]

Products

EcoRide BE35

Proterra EcoRide
EcoRide BE35 in service with Foothill Transit
Overview
ManufacturerProterra, Inc.
Body and chassis
ClassTransit bus
LayoutRR
Powertrain
EngineUQM Technologies PP220 traction motor[11][12]
Transmission
Dimensions
Wheelbase236 to 237 in (5.99 to 6.02 m)[11][12]
Length35 ft 8 12 in (10.9 m)[11][12]
Width101.4 to 103 in (2.58 to 2.62 m)[11][13]
Height132 to 134 in (3.35 to 3.40 m)[12][12]
Curb weight27,680 to 28,180 lb (12,600 to 12,800 kg)[11][12]
Chronology
SuccessorProterra Catalyst

Proterra's EcoRide BE35 is a 35 ft (11 m) composite body, fast-charge, battery electric bus that seats 38 (including the driver) and has a passenger capacity of 60. Foothill Transit was the first user of the buses, which rolled out in September 2010.[14][15] It is the first 30 ft (9 m) or larger, heavy-duty all-electric bus ever to complete federally required durability, reliability and safety testing at the Bus Research and Testing Center at Altoona, Pennsylvania. The 12yr/500,000 mi (800,000 km) STURAA test was completed on March 5, 2012.[11]

Results from the STURAA test showed an average, combined fuel economy of 1.81 kWh/mi (1.12 kW⋅h/km) or 20.84 miles per US gallon (8.86 km/l) diesel equivalent.[12]:39 Compared to the buses it replaces—conventional diesel buses average 3.86 miles per US gallon (1.64 km/l); CNG buses return 3.27 miles per US gallon (1.39 km/l) diesel equivalent; and diesel-hybrid buses average about 4.6 miles per US gallon (2.0 km/l)[16]—the results are up to 600% better. During 15,000 miles (24,000 km) of testing at Altoona for the first BE35, unscheduled maintenance included the replacement of the transmission (twice) and the traction motor (once).[11]:86–90

Foothill Transit has been working with the California Air Resources Board and the United States Department of Energy National Renewable Energy Laboratory (NREL) to study the real-world performance of its Proterra buses.[17][18][19] Observed economy for twelve BE35 buses in the Foothill Transit fleet was 17.24 miles per US gallon (0.1364 l/km) diesel equivalent, compared to an observed 4.15 miles per US gallon (0.567 l/km) diesel equivalent for a fleet of eight NABI 42-foot CNG-fueled buses. However, the BE35 fleet operates on circulator routes at slower speeds compared to the NABI CNG fleet, which were dispatched as needed to any Foothill Transit route. The BE35 fleet achieved an availability of 80.6%, less than the desired 85% availability due to constraints on parts availability and low-voltage battery (i.e., not the propulsion batteries) reliability; the NABI CNG fleet achieved an availability of 96.8%. Total maintenance costs for the BE35 fleet ($0.41/mi) is also higher than the maintenance cost for the NABI CNG fleet ($0.27/mi).[19]

Docked in the overhead charger terminal (Feb 2016)
Curbside charging station (Nov 2015)
Charging infrastructure for Proterra Catalyst under evaluation with King County Metro Transit at Eastgate Park & Ride

The vehicle's 220-kW electric motor is powered by a lithium–titanate battery supplied by Altairnano that can be recharged in 5–10 minutes while stopped at a bus stop via overhead terminals connected to a charging station, without driver involvement.[20] Charging, which would normally take place during a brief layover, typically provides sufficient charge for a further 26 miles (42 km) of operation.[21][22] As of June 2016, Proterra will grant royalty-free access to the patents covering their overhead charging system.[23]

Catalyst

Proterra Catalyst
Catalyst BE40
Overview
ManufacturerProterra, Inc.
Body and chassis
ClassTransit bus
LayoutRR
Powertrain
EngineUQM Technologies PP220 traction motor[13]
TransmissionEaton EEV-7202[13]
Dimensions
Wheelbase296.5 in (7.53 m)[13]
Length42 ft 7 12 in (13.0 m)[13]
Width102 in (2.59 m)[13]
Height134 in (3.40 m)[13]
Curb weight
  • 27,370 lb (12,400 kg) (BE40)[13]
Chronology
PredecessorProterra EcoRide

In 2014 Proterra introduced the Catalyst, a fast-charge 100% electric bus to replace the EcoRide BE35. The bus was built on the EcoRide's design and engineering and delivered a longer, lighter and more fuel-efficient bus.

The second-generation bus measures 40 ft (12 m) and weighs approximately 27,000 lb (12,000 kg). The bus is built from lightweight, durable carbon composite. The overall lower weight helps reduce wear and tear on streets. It has no tailpipe and runs virtually silent.

With the on-route fast charging system, the Catalyst can be operated continuously, 24/7, without the need to head to the depot for lengthy charge times. Catalyst buses equipped with the Fast Charge (FC) battery pack can charge at a rate of up to 500 kW.[24] The company added a 35 ft (11 m) model of the Catalyst to its product line October 2015.

Catalyst is a modular system, offered with two different lengths, two different drivetrains, and seven different batteries, depending on the required passenger capacity, speed (hill performance),[25] and range, respectively.[26]

NREL also studied two Catalyst 40FC buses in the Foothill Transit fleet operating in 2017. The two Catalyst 40FC were slightly less efficient at 16.99 miles per US gallon (0.1384 l/km) diesel equivalent compared to the BE35s and suffered from the same low-voltage battery issues, resulting in an availability of 81.3% and a maintenance cost of $0.32/mi.[19]

Battery options

Buses equipped with the FC (Fast Charge) family of batteries are intended for circulator routes; XR (eXtended Range) battery buses are intended for intermediate-mileage routes; and E2 (Efficient Energy) battery buses are intended for high-mileage routes.[27] The buses were initially offered with lithium-titanate batteries, which Proterra redesignated the TerraVolt FC. The TerraVolt XR lithium nickel manganese cobalt oxide batteries[24] were introduced in 2015 with improved range but slower charging,[28] and the TerraVolt E2 batteries were introduced in 2016 with the longest range and slowest charging.[27]

Batteries are carried under the Catalyst chassis, and use an interchangeable mounting system, so each Catalyst can hold between four and ten battery packs. The batteries can be swapped out, upgraded, or reconfigured as needs change.[24]

Others

Proterra partnered with Van Hool to build that firm's first all-electric coach for North America.[31] The Van Hool CX45E was announced in October 2017, to be available in 2019; it would be followed by a shorter CX35E model. Both of the Van Hool coaches were powered by the Proterra Catalyst E2 battery.[32] A prototype CX45E was exhibited at Busworld Kortrijk in October 2019, the only North American coach shown at the European show.[33]

In July 2018, Foothill Transit announced they had ordered two Alexander Dennis Enviro500EV double-decker buses with powertrains built by Proterra.[34] The Enviro500EV will use Proterra Catalyst E2 battery packs, on-board charging hardware, and thermal management.[35]

In October 2018, Proterra announced they had partnered with Thomas Built Buses to build an electric school bus, the Saf-T-Liner C2 Jouley (initially known as the Saf-T-Liner eC2).[36][31] The Jouley is equipped with a 220 kW-hr battery, providing an estimated range of 134 miles (216 km) and capable of recharging in three hours using 60 kW DC fast charging equipment provided by Proterra. Dominion Energy announced an order for 50 C2 Jouley school buses in December 2019, which would be deployed in the initial phase of its school bus replacement program in Virginia.[37]

The partnerships with other bus OEMs led Proterra to announce in August 2019 the Proterra Powered initiative, which supports OEMs that are interested in using Proterra's battery-electric drivetrain for heavy-duty commercial vehicles.[38][39]

Development and manufacturing

Proterra is a national company with its headquarters in Silicon Valley and manufacturing in San Gabriel Valley within metro Los Angeles and in South Carolina's Upstate Region—utilizing strengths and competitive advantages of all locations. The Proterra headquarters is centrally-located in California, home to America's largest concentration of electric vehicle and transportation technology development in North America and the number one market for transit in the U.S. The company also operates a West Coast manufacturing facility in the City of Industry, California. Proterra's East Coast manufacturing and engineering operations are located in Greenville, South Carolina and sits directly outside CU-ICAR. CU-ICAR's 250-acre campus—its research is focused entirely on industry needs and economic development—gives Proterra access to research and development resources that help further development of its EV buses and charging stations.

Current and future operations

A Proterra Catalyst operated by King County Metro.
Proterra electric bus in downtown Dallas, TX

As of 2017, Proterra stated it had sold more than 400 vehicles to more than 45 customers in 20 states.[40] Current operations and future purchases include:

Year[lower-alpha 1] City/Location State Agency Vehicles[lower-alpha 2] Refs
2010 PomonaCA Foothill Transit 31 [41][42]
2012 TallahasseeFL StarMetro[lower-alpha 3] 27 [42][45][46][47][48]
2013 San AntonioTX VIA Metropolitan Transit 3 [49]
StocktonCA San Joaquin Regional Transit District 11 [50][51]
WorcesterMA Worcester Regional Transit Authority 7 [42][52][53]
2014 ChicagoIL Chicago Transit Authority 22 [54]
Reno[lower-alpha 4]NV Regional Transportation Commission of Washoe County 20 [56]
2015 King CountyWA King County Metro Transit[lower-alpha 5] 23[lower-alpha 6] [59][60]
LouisvilleKY Transit Authority of River City 16 [61]
NashvilleTN Nashville Metropolitan Transit Authority 9 [62][63][64]
SenecaSC Clemson Area Transit[lower-alpha 7] 7 [65]
2016 ChicagoIL JLL[lower-alpha 8] 10 [66]
MissoulaMT ASUM Transportation 2 [67]
Pioneer ValleyMA Pioneer Valley Transit Authority 3 [68][69]
PortervilleCA Porterville Transit 2 [70]
2017 AtlantaGA Metropolitan Atlanta Rapid Transit Authority[lower-alpha 9] 1 [71]
EverettWA Everett Transit[lower-alpha 10] 4 [73]
FresnoCA California State University, Fresno 3 [74]
FresnoCA Fresno County Rural Transit 4 [74]
LexingtonKY Lexington Transit Authority[lower-alpha 10] 6
ModestoCA Modesto Area Express 4 [75]
Park CityUT Park City Public Works[lower-alpha 10] 6 [76][77]
Port ArthurTX Port Arthur Transit[lower-alpha 10] 6 [78]
ShreveportLA Shreveport Area Transit System[lower-alpha 10] 5 [79]
VisaliaCA City Of Visalia Transit Division 4 [74]
WilmingtonDE Delaware Transit Corporation[lower-alpha 10] 6
2018 Pierce CountyWA Pierce Transit[lower-alpha 10] 3 [73]
AnchorageAK PeopleMover[lower-alpha 11] 1 [80]
BaltimoreMD Baltimore Gas and Electric 2 [81][82]
BremertonWA Kitsap Transit 1 [83]
DallasTX Dallas Area Rapid Transit[lower-alpha 12] 7 [84][85][86]
DuluthMN Duluth Transit Authority 7 [87][88]
GreensboroNC Greensboro Transit Authority[lower-alpha 13] 4 [89]
MolineIL Quad Cities MetroLINK 2 [90]
New York CityNY Metropolitan Transportation Authority[lower-alpha 14] 5 [91]
San JoséCA Mineta San José International Airport 10 [92]
Santa Clara CountyCA Santa Clara Valley Transportation Authority[lower-alpha 10] 5 [93]
Washington, DC DC Circulator 14 [94]
YosemiteCA United States National Park Service 2 [95]
2019 San Mateo CountyCA San Mateo County Transit District 10 [96]
Los AngelesCA Los Angeles Department of Transportation[lower-alpha 3] 25 [97]
TorontoON Toronto Transit Commission[lower-alpha 15] 10 [98]
AthensGA University of Georgia 20
2020 EdmontonAB Edmonton Transit Service 25 [99]
Los AlamosNM Atomic City Transit 2 [100]
  TOTAL 397
Notes
  1. Year of initial deployment
  2. Deliveries, leased, and firm orders
  3. Selected under the 2017 FTA Low or No Emission Program — 5339(c) enacted by the FAST Act.[43] 55% of the funds granted in 2017 went to 29 agencies that intend to purchase or lease Proterra electric buses.[44]
  4. Proterra has also partnered with University of Nevada, Reno to deploy a single autonomous bus in Reno based on the Catalyst.[55]
  5. Demonstrations began in 2015,[57] with regular service in 2016.[58]
  6. Of the 23, 3 are in service and 20 are on firm order from an option held for 73 additional buses.[58]
  7. World's first all-electric municipal bus fleet.
  8. Leased by JLL.
  9. On loan as a pilot program.
  10. Selected under the 2016 FTA Low or No Emission Program — 5339(c) enacted by the FAST Act.[72]
  11. Under a four month sponsored trial. Sponsored by the local waste management company Anchorage Solid Waste Services.
  12. First customer for the 35-foot Catalyst.
  13. GTA holds a five-year contract with Proterra and expects to purchase more than 4 buses.[89]
  14. 3-year pilot program testing 10 all-electric buses: 5 from Proterra and 5 from New Flyer.
  15. TTC is purchasing 30 electric buses (10 each from the leading manufacturers) as part of an evaluation program.

Investors

Since inception, Proterra has been funded through FTA grants as well as venture capital funding. Since 2011 Proterra has raised more than $130 million in private equity funding. Investors include:

  • Kleiner Perkins Caufield & Byers, a venture capital private equity firm based in Silicon Valley.[7]
  • General Motors Ventures LLC.[7]
  • Mitsui & Co. Global Investment Inc., a subsidiary of Mitsui & Co., Ltd.
  • Vision Ridge Partners LLC, a Boston-based organization that advises and invests in transformative growth companies with a focus on sustainability.[101]
  • 88 Green Ventures LLC, an investment firm that manages asset capabilities to assist emerging green companies.[101]
  • TAO Capital Partners, invests in technology, alternative energy, healthcare, consumer, and real estate businesses that have a sustainable positive impact.[7]
  • BMW i Ventures [102]

See also

References

  1. "Proterra Company Profile".
  2. "Clean Fuels Grant Program Bus and Bus Facilities (5309, 5318)". Federal Transit Administration. Archived from the original on January 15, 2012. Retrieved July 12, 2018.
  3. "Clean Fuels Grant Program (5308)". US: Federal Transit Administration. Retrieved April 18, 2016.
  4. Eudy, Leslie (2012). FTA’s TIGGER Program Supporting Sustainable Transit Operations (PDF). Sustainability and Public Transportation Workshop. Colorado, US. Archived from the original (PDF) on March 3, 2016. Retrieved April 18, 2016.
  5. Gouch, John. "Proterra selects CU-ICAR for research, development and assembly of hybrid commercial vehicles". Newsstand – Clemson University News and Stories, South Carolina. Retrieved August 28, 2018.
  6. "Proterra Moves Headquarters to South Carolina Facility". Mass Transit. Retrieved August 28, 2018.
  7. Vance, Ashlee (June 20, 2014). "Proterra, an Electric Bus Maker, Aims to Follow the Tesla Model". Bloomberg. US. Retrieved April 18, 2016.
  8. "Proterra Joins the San Francisco Bay Area's Highly Touted Transportation and Tech Hubs". US: Proterra. October 5, 2015. Retrieved April 18, 2016.
  9. Ohnsman, Alan. "Next Stop Unicorn? Daimler Leads $155 Million Round For Silicon Valley Electric Bus Maker Proterra". Forbes. Retrieved September 20, 2018.
  10. "Electric bus maker Proterra secures $155 million investment led by Daimler". Electrek. September 19, 2018. Retrieved September 20, 2018.
  11. STURAA Test: 12 Year, 500,000 mile bus from Proterra, Inc. | Model BE-35 (Report). Pennsylvania Transportation Institute. April 2012.
  12. STURAA Test: 12 Year, 500,000 mile bus from Proterra, Inc. | Model BE-35 (Report). Pennsylvania Transportation Institute. May 2013.
  13. Federal Transit Bus Test: 12 Year/500,000 Mile bus from Proterra, Inc. | Model BE40 (Report). Pennsylvania Transportation Institute. May 2015.
  14. "L.A. Gets World's First Rapid-Charge Electric Bus". TechChunks. US. September 20, 2010. Retrieved April 18, 2016.
  15. Barry, Keith (September 13, 2010). "Quick-charge electric bus rolls into L.A. County". Wired. Retrieved July 12, 2018.
  16. Argonne GREET model 2012, assuming 36,000 mi (58,000 km) per year and fuel consumption of 3.86 miles per US gallon (1.64 km/l) diesel and 3.27 miles per US gallon (1.39 km/l) diesel equivalent for CNG.
  17. Eudy, Leslie; Prohaska, Robert; Kelly, Kenneth; Post, Matthew (January 2016). Foothill Transit Battery Electric Bus Demonstration Results (PDF) (Report). National Renewable Energy Laboratory. Retrieved July 13, 2018.
  18. Eudy, Leslie; Jeffers, Matthew (June 2017). Foothill Transit Battery Electric Bus Demonstration Results: Second Report (PDF) (Report). National Renewable Energy Laboratory. Retrieved July 13, 2018.
  19. Eudy, Leslie; Jeffers, Matthew (May 2018). Foothill Transit Battery Electric Bus Progress Report (PDF) (Report). National Renewable Energy Laboratory. Retrieved July 13, 2018.
  20. Barry, Keith (November 4, 2009). "Altairnano batteries make Proterra a magic bus". Wired. Retrieved July 12, 2018.
  21. "California City First To Get 2nd-Generation Proterra Electric Bus".
  22. "Electric bus manufacturers BYD and Proterra are making serious moves".
  23. "Proterra Opens Its Electric Vehicle Fast-Charging Technology to Mass Transit Industry". Proterra. June 28, 2016. Retrieved August 4, 2016.
  24. "Proterra Catalyst Platform Introduction" (PDF). Louisiana Alternative Fuels Conference & Expo. April 14, 2016. Retrieved July 13, 2018.
  25. "Proterra 40 Foot Bus drivetrain performance" (PDF). Proterra. Retrieved July 12, 2018.
  26. "The Proterra Catalyst 35-foot transit vehicle". Proterra. Retrieved July 12, 2018.
  27. "Proterra launches new Catalyst E2 series electric bus with nominal range of up to 350 miles". Green Car Congress. September 12, 2016. Retrieved July 12, 2018.
  28. "Proterra introduces new extended range battery pack for electric transit buses; up to 180 miles". Green Car Congress. February 24, 2015. Retrieved July 12, 2018.
  29. "Proterra introduces two-motor DuoPower drivetrain for its Catalyst electric buses; partnership with Van Hool". Green Car Congress. October 9, 2017. Retrieved July 12, 2018.
  30. Marshall, Aarian (September 12, 2016). "This new electric bus can drive 350 miles on one charge". Wired. Retrieved July 12, 2018.
  31. "Proterra to electrify other OEMs' heavy-duty vehicle offerings". Metro Magazine. August 6, 2019. Retrieved March 13, 2020.
  32. "Van Hool builds first 100% electric coach for the American market" (Press release). Van Hool. October 9, 2017. Retrieved March 13, 2020.
  33. "ABC, Proterra unveil all-electric Van Hool CX45E motorcoach". Metro Magazine. October 29, 2019. Retrieved March 13, 2020.
  34. "We're Bringing All-Electric Double Decker Buses To The SGV!" (Press release). Foothill Transit. July 12, 2018. Retrieved July 20, 2018.
  35. "Global double deck bus market leader, Alexander Dennis, selects Proterra to power North America's first electric double deck transit bus" (Press release). Proterra. July 12, 2018. Retrieved July 20, 2018.
  36. "Proterra and Thomas Built Buses debut electric school bus" (Press release). Proterra. October 30, 2018. Retrieved March 13, 2020.
  37. "Thomas Built Buses' Jouley Selected for Phase One of Dominion Energy's Electric School Bus Initiative" (Press release). Proterra. December 17, 2019. Retrieved March 13, 2020.
  38. "Proterra offers electric platform to OEMs. 'Proterra Powered' initiative is born". Sustainable Bus. August 15, 2019. Retrieved March 13, 2020.
  39. Ohnsman, Alan (August 6, 2019). "Beyond The Bus: Proterra Repackages Its Electric Transit Tech To Power Heavy-Duty Commercial Vehicles". Forbes. Retrieved March 13, 2020.
  40. "Proterra Company Overview" (PDF). Proterra. September 12, 2017. Retrieved August 8, 2018.
  41. Barry, Keith (September 13, 2010). "Quick-charge electric bus rolls into L.A. County". Wired. Retrieved August 7, 2018.
  42. Gross, Daniel (September 5, 2014). "Further: Forget Tesla. If you really want to reduce vehicle emissions, it's unglamorous buses, not flashy sedans, that need to go electric". Slate. Retrieved August 7, 2018.
  43. "Fiscal Year 2017 Low or No-Emission (Low-No) Bus Program Projects". Federal Transit Administration. March 19, 2018. Retrieved August 7, 2018.
  44. "Proterra congratulates the winners of FTA Low-No Grant funding for battery-electric buses" (Press release). Proterra. September 26, 2017. Retrieved August 8, 2018.
  45. "Proterra Signs Contract with StarMetro to Deliver Zero-Emission EcoRide Transit Buses" (Press release). BusinessWire. October 3, 2011. Retrieved August 7, 2018.
  46. "Proterra congratulates the winners of FTA Low-No Grant funding for battery-electric buses" (Press release). Proterra. September 26, 2017. Retrieved August 7, 2018.
  47. Ash, Jim (September 21, 2017). "U.S. DOT Giving Star Metro A Miollion-Dollar Re-Charge". WFSU News. Retrieved August 7, 2018.
  48. Proterra (March 22, 2019). "STARMETRO PLACES ITS THIRD ORDER WITH PROTERRA, BRINGING MORE BATTERY-ELECTRIC BUSES TO FLORIDA STATE UNIVERSITY". Proterra. Retrieved April 16, 2019.
  49. Davila, Vianna (February 26, 2013). "VIA rolls out electric buses". San Antonio Express-News. Retrieved August 7, 2018.
  50. Breitler, Alex (December 11, 2012). "All-electric mass transit rolling into town". The Stockton Record. Retrieved August 7, 2018.
  51. "Proterra continues North American market leadership with milestone deployment to San Joaquin RTD" (Press release). Proterra. April 13, 2017. Retrieved August 7, 2018.
  52. "Proterra to Provide Three EcoRide Zero-Emission Battery-Electric Transit Buses to WRTA" (Press release). Mass Transit. September 26, 2012. Retrieved August 7, 2018.
  53. Kane, Mark (February 6, 2014). "Proterra delivers three additional EcoRide BE35 buses to WRTA". InsideEVs. Retrieved August 7, 2018.
  54. "CTA Expands Electric Bus Fleet" (Press release). Chicago Transit Authority. June 13, 2018. Retrieved August 7, 2018.
  55. Baker, David R. (May 2, 2017). "Proterra to test self-driving bus in downtown Reno". San Francisco Chronicle. Retrieved August 7, 2018.
  56. "Reno unveils 4 new electric buses". Las Vegas Review-Journal. Associated Press. April 15, 2014. Retrieved August 7, 2018.
  57. Lindblom, Mike (August 18, 2015). "5 new trolleys arrive as part of Metro's replacement plan". The Seattle Times. Retrieved September 7, 2015.
  58. Ayre, James (January 16, 2017). "King County Metro To Buy 120 All-Electric Buses By 2020 (73 Coming From Proterra)". Clean Technica. Retrieved August 8, 2018.
  59. "King County launches next generation of electric trolleys and previews new battery-powered bus" (Press release). King County Metro. August 18, 2015. Retrieved September 7, 2015.
  60. "King County Executive announces purchases of battery buses, challenges industry to build next-generation transit" (Press release). King County Executive. January 10, 2017. Retrieved August 8, 2018.
  61. Ryan, Jacob (January 12, 2015). "Zero Emission, All-Electric Buses Take To Louisville Streets". WFPL. Retrieved August 7, 2018.
  62. "Proterra Sells Seven Battery-Electric Transit Buses to Nashville MTA" (Press release). Proterra. February 26, 2014. Retrieved August 7, 2018.
  63. Hubbard, Alex (May 16, 2016). "Nashville MTA awarded for electric buses". The Tennessean. Retrieved August 7, 2018.
  64. "Nashville Embraces Zero-Emission Proterra Buses to Achieve Transit Goals". Mass Transit. September 13, 2017. Retrieved August 7, 2018.
  65. Barnett, Ron (February 27, 2015). "Seneca celebrates start of 'world's first' all-electric bus fleet". Greenville News. Retrieved August 7, 2018.
  66. Gross, Daniel (November 22, 2016). "The Electric Company". Slate. Retrieved August 7, 2018.
  67. "UM Orders Zero-Emission Electric Buses for UDASH Fleet" (Press release). The University of Montana. February 2, 2016. Retrieved April 14, 2016.
  68. "Zero-emission buses expand west from Worcester". Worcester Business Journal. State House News Service. December 12, 2016. Retrieved August 7, 2018.
  69. "PVTA Introduces First Battery Electric Buses into Fleet". Mass Transit. December 16, 2016. Retrieved August 7, 2018.
  70. Hess, Jeffrey (July 21, 2015). "Electric Buses Headed To Porterville". Valley Public Radio. Retrieved August 7, 2018.
  71. "MARTA Goes Green with New Electric Bus Unveiling, Tour March 17th" (Press release). Metropolitan Atlanta Rapid Transit Authority. March 13, 2017. Retrieved August 7, 2018.
  72. "Fiscal Year 2016 Low or No-Emission (Low-No) Bus Program Projects". Federal Transit Administration. September 7, 2016. Retrieved August 7, 2018.
  73. Englehardt, Bruce (August 2, 2016). "Everett Transit and Pierce Transit to Buy Electric Buses". Seattle Transit Blog. Retrieved August 7, 2018.
  74. Panoo, Ashleigh (November 16, 2016). "Zero-emission buses coming to San Joaquin Valley". The Fresno Bee. Retrieved August 7, 2018.
  75. "Modesto accepts grant for electric buses". The Modesto Bee. July 2, 2016. Retrieved August 7, 2018.
  76. Vaifanua, Tamara (January 17, 2017). "Park City rolls out its first electric express bus". Fox 13 Salt Lake City. Retrieved August 7, 2018.
  77. Hamburger, Jay (August 5, 2016). "Park City opts for electric buses on a lightning-fast route". Park City Record. Retrieved August 7, 2018.
  78. Moore, Chris (November 16, 2016). "New buses on the way for Port Arthur". The Port Arthur News. Retrieved August 7, 2018.
  79. "SporTran and Proterra deploy Louisiana's first battery-electric buses in Shreveport" (Press release). Proterra. November 8, 2017. Retrieved August 8, 2018.
  80. "Electric Bus". Municipality of Anchorage. Retrieved March 9, 2018.
  81. "BGE Adds State-of-the-Art Electric Buses to Company Vehicle Fleet" (Press release). BGE, an Exelon Company. March 15, 2018. Retrieved August 8, 2018.
  82. "Baltomire Gas and Electric and Proterra deploy nation's first electric shuttle buses at a utility campus" (Press release). Proterra. March 15, 2018. Retrieved August 8, 2018.
  83. Vosler, Christian (April 29, 2018). "Kitsap Transit debuts new electric bus". Kitsap Sun. Retrieved August 8, 2018.
  84. "Proterra Expands its Catalyst™ EV Bus Platform to Include a Nimbler Bus" (Press release). Proterra. October 5, 2015. Retrieved August 7, 2018.
  85. Ptacek, Karen (January 10, 2018). "DART Demos New Proterra Zero-Emission, All-Electric Buses". DART Daily. Retrieved August 7, 2018.
  86. Branham, Dana (July 10, 2018). "DART's fleet of electric buses roll out in downtown Dallas". Dallas Morning News. Retrieved August 7, 2018.
  87. Slater, Brady (August 25, 2016). "Duluth's electric buses delayed". Duluth News Tribune. Retrieved August 7, 2018.
  88. Slater, Brady (May 13, 2018). "Electric buses arriving soon in Duluth". Duluth News Tribune. Retrieved August 7, 2018.
  89. "Greensboro Transit orders Proterra electric buses". Metro Magazine. November 13, 2017. Retrieved August 8, 2018.
  90. Lagerstam, Leon (April 17, 2018). "MetroLINK introduces battery-operated fleet". The Rock Island Dispatch·Argus. Retrieved August 7, 2018.
  91. "MTA Testing 10 New, All-Electric Buses to Reduce Emissions & Modernize Public Transit Fleet" (Press release). MTA. January 8, 2018. Retrieved August 8, 2018.
  92. "Mineta San José International Airport selects Proterra to deliver Bay Area's first electric airport bus fleet" (Press release). Proterra. November 7, 2017. Retrieved August 8, 2018.
  93. Harnack, Leah (April 23, 2018). "VTA Pilots Smart Charging System with Rollout of New Electric Buses". Mass Transit. Retrieved August 7, 2018.
  94. "Washington D.C. Circulator Deploys Proterra Battery Electric Busses Across Nation's Capital" (Press release). Proterra. April 20, 2018. Retrieved July 4, 2018.
  95. "Yosemite becomes first U.S. National Park to purchase zero-emission buses from Proterra" (Press release). Proterra. December 4, 2017. Retrieved August 8, 2018.
  96. "SamTrans orders 10 Proterra Catalyst® E2 buses and sets a 100 percent zero-emission fleet goal by 2033" (Press release). Proterra. March 14, 2018. Retrieved August 8, 2018.
  97. "Los Angeles Department of Transportation wins FTA Low-No Grant and selects Proterra to provide 25 zero-emission buses for one of California's largest bus fleets" (Press release). Proterra. December 21, 2017. Retrieved August 8, 2018.
  98. "UNIVERSITY OF GEORGIA PURCHASES TWENTY 40-FOOT CATALYST® E2 BUSES FROM PROTERRA" (Press release). Proterra. April 3, 2019. Retrieved April 16, 2019.
  99. "Edmonton Transit Makes Move To Battery Electric Buses" (Press release). Indie Garage. August 23, 2018.
  100. "Atomic City Transit Adding Two Electric Buses To Fleet" (Press release). Los Alamos Daily Post. September 20, 2018. Retrieved November 8, 2019.
  101. "Electric bus maker Proterra raises more than $30M; Kleiner Perkins and GM led". Green Car Congress. US. June 19, 2014. Retrieved April 18, 2016.
  102. http://www.bmwblog.com/2017/06/13/bmw-ventures-announces-strategic-investment-proterra/

Altoona testing

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.