Line 10 (Beijing Subway)

Line 10 of the Beijing Subway (Chinese: 北京地铁10号线; pinyin: běijīng dìtiě shíhào xiàn) is the second loop line in Beijing's rapid transit network as well as the longest and most widely used line. The line is 57.1 km (35.5 mi) in length and runs entirely underground through Haidian, Chaoyang and Fengtai Districts, either directly underneath or just beyond the 3rd Ring Road.[3] The Line 10 loop is situated between two and six kilometers outside the Line 2 loop, which circumnavigates Beijing's old Inner City. Every subway line through the city centre intersects with Line 10, which has 24 transfer stations along route, and 45 stations in all.[3] Line 10's color is      Capri.

Line 10
 10 
Overview
Other name(s)M10 (planned name)
TypeRapid transit
SystemBeijing Subway
StatusOperational
LocaleHaidian, Chaoyang and Fengtai districts
Beijing
Stations45
Daily ridership1,931,000 (First Half of 2018 Peak)[1]
2,076,500 (2014 Peak)[2]
Operation
Opened19 July 2008 (2008-07-19)
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
CharacterUnderground
Depot(s)Bagou, Songjiazhuang, Wulu
Rolling stock6-car Type B (DKZ15, DKZ34)
Technical
Line length57.1 km (35.5 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third rail
Operating speed80 km/h (50 mph)
Route map

Bagou
Wanliu depot
Wanquan river
Suzhoujie
Line 16 (to be opened 2020)
Wanpingcheng – Bei'anhe
connects Line 4
Haidianhuangzhuang
Zhichunli
Zhichunlu
Jingzhang ICR
Xitucheng
Changping line (
southern extension
to be opened 2021
)
JimenqiaoChangping Xishankou
Mudanyuan
Line 19 (to be opened 2021)
Jiandemen
Beitucheng
connects Line 8
Anzhenmen
planned line 8 branch platform
connects Line 8
Huixinxijie Nankou
connects Line 5
Shaoyaoju
Taiyanggong
Line 17 (to be opened 2022)
Yizhuang Zhanqianqu SouthFuture Science Park North
Ba river
Capital Airport Express Terminal 3
line 12 Guanzhuangluxikou
Sanyuanqiao
Line 12 (to be opened 2021)
Caiptal Airport Express Dongzhimen
line 12 Sijiqing
Liangmaqiao
Liangma river
Agricultural Exhibition Center
Tuanjiehu
Line 3 (to be opened 2022)
Dongsi ShitiaoCaogezhuang North
Hujialou
Jintaixizhao
Line 28 (under construction)
DongdaqiaoGuangqu East Road
Guomao
Pingguoyuan – Sihui East
Tonghui river
Jingha railway
Shuangjing
Jinsong
Panjiayuan
Jingjin ICR crossing
Shilihe
Line 17 (to be opened 2022)
Yizhuang Zhanqianqu SouthFuture Science Park North
Fenzhongsi
Chengshousi
Songjiazhuang yard
connects Yizhuang line
Songjiazhuang
Shiliuzhuang
Liangshui river
Dahongmen
Line 8 (
line 8 station not yet opened
interchange not yet available
)
Jiaomen East
Jiaomen West
Caoqiao
Line 19 (to be opened 2021)
Lize Business District (to be opened 2022)Daxing Airport
Ma'cao river
Jinghu HSR
Jingjiu railway
Jijiamiao
Shoujingmao
(
northern extension
to be opened 2020
)
Fengtai railway station (subway)
Line 16 (to be opened 2021)
Bei'anhe – Wanpingcheng
Niwa
Xiju
Shangezhuang (to be opened 2022)Zhangguozhuang
Liuliqiao
Jingguang railway Xichang connection
Jingguang HSR
Lianhuaqiao
Gongzhufen
Sihui East – Pingguoyuan
Yongding River diversion canal
Xidiaoyutai
Jingmi diversion canal
Cishousi
Wulu yard
connects line 6
Chedaogou
Changchunqiao
Line 12 (to be opened 2021)
GuanzhuangluxikouSijiqing
Huoqiying
Jingmi diversion canal

Line 10 is the world's longest subway loop line[4] and one of the longest entirely underground subway lines requiring 104 minutes to complete one full journey in either direction.[5]

History

SegmentCommencementLengthStation(s)Name
Bagou — Jinsong 19 July 2008 24.680 km (15.34 mi) 22 Phase 1
Xiju — Bagou 30 December 2012 13.843 km (8.60 mi) 9 Phase 2 (initial section)
Jinsong — Shoujingmao 15.932 km (9.90 mi) 11
Shoujingmao — Xiju 5 May 2013 3.420 km (2.13 mi) 2 Phase 2 (final section)
Jiaomen East Infill station 1

Planning

The Beijing Subway network was originally conceived to have only one ring line.[6] The booming economy and explosive population growth of Beijing put huge demand on Line 2, surpassing its designed capacity. In 2001 and 2002, the China Academy of Urban Planning and Design proposed two "L-shaped" lines named Line 10 and 11. Together they would form a second loop around Beijing and relieve pressure on line 2.[7]

Phase I

On December 27, 2003, in preparation for the 2008 Summer Olympic Games in Beijing, Phase 1 of Line 10 started construction.[8] On July 19, 2008, Phase I of Line 10 entered operation ahead of the opening of the Olympic Games.[9] It was 24.68 km (15.34 mi) in length and had 22 stations. Phase I consisted of the northern and eastern sides of Line 10's rectangular loop from Bagou to Jinsong forming an inverted "L"-shaped line.

Beitucheng Station Mudanyuan station Station sign showing Exits
A, B & D of Zhichunli Station

Phase II

Construction on Phase II began on December 28, 2007. which meant that the original plan for Line 11 was not incorporated into the final network design and was instead absorbed into Line 10. Line 10 formed the second full loop around Beijing.[10] In 2010, the Ministry of Railways proposed that Fengtai Railway Station was to be renovated and expanded to become a bigger intercity rail terminal for Beijing, with access to the Beijing-Guangzhou high-speed railway. The rationale was to ease intercity traffic pressure on Beijing West railway station.[11] Due to the need to reorganize the stations on Line 10 to better serve the new rail terminal, work stopped on 2 stations, namely Mengjiacun (孟家村) and Niwa (泥洼).[12] The planning department proposed that the original Mengjiacun and Niwa subway stations be merged into the new Fengtai railway station, known as the "three stops into one" program. Local residents, after realizing their travel to a subway station would be greatly lengthened, quickly opposed the plan.[13] Planners reconsidered and moved Niwa Station 300m north to its current position and Mengjiacun 100m north to be renamed as Fengtai Railway Station.[14] The original station shells were demolished and new stations built in their respective new locations. Niwa station started reconstruction in February 2012,[15] while Fengtai railway station started on April 11, 2012.[16] This made the late 2012 opening date for that section of Line 10 highly unlikely and was postponed to the next year.[17] On December 30, 2012, the first section of Phase II, consisting of the southern and western sides of the loop opened. With the opening of Phase I and Phase II, Line 10 became a "C" shape.[18]

The near completion of Line 10 led to rapid growth of Line 10's ridership. At the same time, some traffic from Line 1 was diverted to the parallel and newly opened Line 6, allowing Line 10 to overtake Line 1 as Beijing's busiest subway line.[19] The Beijing Subway started operating express trains that ran non-stop between Songjiazhuang to Jinsong to alleviate traffic in the southeastern section of Line 10. These trains stopped operation after the completion of the loop.[20]

The loop was fully enclosed on May 5, 2013 with the opening of Fengtai Railway Station and Niwa, as well as the infill Jiaomen East.[3][9][21][22] Initially, Line 10 services consisted of a "full-loop" service that make the journey through all 45 stations in 104 minutes, and "partial-loop" trains that run from Chedaogou in the northwest to Songjiazhuang in the southeast before turning back.[3] With the delivery of more rolling stock, "partial-loop" trains were removed and all trains serving the full loop at a headway of 2 minutes and 15 seconds. By 2014, the completed loop carried on average 1.69 million passengers per day.[23]

Hall of Panjiayuan station Hall of Fengtai Railway Station
(subway station)
Ceiling of Gongzhufen station, Line 10

Operation

Line 10 to scale

From Bagou near Wanliu Park in Haidian District, Line 10 runs straight east, between the northern 3rd and 4th Ring Roads. At Xitucheng, the line meets the northern section of the Yuan dynasty earthen city wall, called tucheng. The Jiandemen and Anzhenmen stops are named after former gates in the wall. At Beitucheng, Olympic Branch Line extends off Line 10 and provides access to the Beijing Olympic Green. Farther east, Line 10 turns south after the Sanyuanqiao and follows the eastern 3rd Ring Road straight south to Jinsong in Chaoyang District. The Bagou-Jinsong section constituted Phase I of Line 10, which first opened in July 2008, and connects the university district in Haidian with the embassy district and Beijing CBD. A trip from Bagou to Jinsong takes about 40 minutes.

Fare

Starting fare of RMB(¥) 3 that increases according to the distance fare scheme introduced in December 2014.

Regular subway users can use a Yikatong card, which offers even cheaper journeys, as well as mobile phone apps, which deploy payment via a QR code.

Hours of Operation

The first train on the inner (clockwise) loop departs from Xiju towards Shoujingmao at 5:20am. The first train on the outer (counter-clockwise) loop departs from Shoujingmao towards Xiju at 6:12am. The last inner loop train leaves Xiju for Bagou at 11:29pm. The last outer loop train leaves Shoujingmao for Chedaogou at 11:06pm. For the official timetable, see.[24]

Safety

There are subway public security bureaus (police stations) located in the Bagou, Beitucheng and Liangmaqiao stations. Emergencies can be reported by calling 110 or 64011327.[25]

Stations

Some trains terminate at stations marked '*'.

Station Name Connections Nearby Bus Stops Travel
Time
Distance
km[26]
Location
English Chinese
— ↑ loop line - towards Huoqiying ↑ — -1.495 -1.495
Bagou 巴沟*  Xijiao  74 302 304 307 361 386 424 528 534 539 611 614 630 644 664 夜9 0:00 0.000 0.000 Haidian
Suzhoujie 苏州街 26 302 304 307 361 374 386 424 450 528 609 611 630 634 644 671 688 夜9 0:02 1.110 1.110
Haidianhuangzhuang 海淀黄庄  4  302 304 305 307 320 332 355 365 386 584 609 611 614 630 634 653 671 681 686 特4 特15 夜8 夜9 0:04 0.950 2.060
Zhichunli 知春里 304 323 386 549 579 609 611 630 634 653 671 夜9 0:06 0.975 3.035
Zhichunlu 知春路  13  79 304 311 386 579 601 630 653 671 751 夜9 专168 0:08 1.058 4.093
Xitucheng 西土城 21 79 94 304 375 386 478 498 579 601 603 653 658 671 夜9 夜14 0:10 1.101 5.194
Mudanyuan 牡丹园 16 21 22 47 92 123 304 331 345快 425 508 510 579 601 606 618 620 635 645 653 658 夜4 夜9 0:12 1.330 6.524
Jiandemen 健德门 21 55 92 315 344 345 510 601 618 620 625 653 658 695 特13 夜2 夜9 夜38 0:14 0.973 7.497 Haidian / Chaoyang[lower-alpha 1]
Beitucheng 北土城  8  5 21 81 82 92 113 380 409 515 607 620 653 694 特2 夜6 夜9 专8 0:16 1.100 8.597 Chaoyang
Anzhenmen 安贞门 108 117 124 301 380 409 515 653 694 944 BRT3(快速公交3) BRT3区(快速公交3区) 特2 夜9 夜34 专8 0:18 1.020 9.617
Huixinxijie Nankou 惠新西街南口  5  95 125 361 430 464 491 515 921 944 夜26 0:21 0.982 10.599
Shaoyaoju 芍药居  13  119 515 547 567 696 942快 专22 0:24 1.712 12.311
Taiyanggong 太阳宫 130 132 467 515 567 939 966 985 0:26 1.003 13.314
Sanyuanqiao 三元桥  Capital Airport  18 95 104 132 300 300快 302 359 379 401 403 404 419 536 604 641 671 847 850 850快 852 915 915快 916 916快 918 935 935快 936 939 980 980快 985 特8 夜18 夜30 0:28 1.759 15.073
Liangmaqiao 亮马桥 95 402 403 405 413 416 418 419 499 516 536 672 675 687 701 985 夜30 夜32 0:31 1.506 16.579
Agricultural Exhibition Center 农业展览馆 95 300 300快 302 402 405 416 499 516 635 671 672 675 687 690 701 特8 夜30 夜32 专142 0:33 0.914 17.493
Tuanjiehu 团结湖 43 95 113 115 117 302 405 431 499 650 687 690 701 特16 夜3 夜30 夜34 专142 0:35 0.853 18.346
Hujialou 呼家楼  6  75 113 115 126 140 350 405 650 671 687 BRT2(快速公交2) 特8 夜6 夜30 夜34 0:37 1.149 19.495
Jintaixizhao 金台夕照 9 98 101 112 113 118 350 405 488 615 619 650 671 687 BRT2(快速公交2) 特8 夜13 夜30 夜34 0:39 0.734 20.229
Guomao 国贸  1  1 9 11 28 57 58 72 98 113 348 382 388 402 405 421 488 619 647 650 666 667 668 669 687 804 805快 806 807 808 809 814 816 817 818 818快 846 848 930 938快 976 特8 夜1 夜27 夜30 专5 专10 专164 0:41 0.835 21.064
Shuangjing 双井  7  23 28 54 57 72 98 300 300快 312 348 402 637 669 687 846 848 976 特8 夜7 夜29 夜30 专10 专87 专164 专165 0:43 1.759 22.823
Jinsong 劲松 8 28 29 35 41 52 54 72 91 98 352 402 457 535 561 637 638 687 特8 夜19 夜30 0:45 1.006 23.829
Panjiayuan 潘家园 28 34 300 300快 378 535 638 674 687 805快 846 848 938快 976 特8 夜30 0:47 1.021 24.850
Shilihe 十里河  14  28 53 300 300快 352 378 439 440 513 638 680 687 846 848 973 975 976 985 986 995 特8 夜30 专19 专72 0:49 1.097 25.947
Fenzhongsi 分钟寺 352 0:52 1.804 27.751 Fengtai
Chengshousi 成寿寺* 25 93 128 665 680 821 985 990 夜23 0:54 1.058 28.809 Chaoyang
Songjiazhuang 宋家庄*  5   Yizhuang  2 39 139 366 511 524 555 576 684 990 特11 夜28 专62 0:57 1.677 30.486 Fengtai
Shiliuzhuang 石榴庄 120 525 820 829 特11 夜28 专76 专130 0:59 1.269 31.755
Dahongmen 大红门 54 324 343 526 622 687 827 954 997 BRT1(快速公交1) 专13 专34 专76 专163 1:01 1.244 32.999
Jiaomen East 角门东 14 54 70 343 501 511 687 957 专13 专34 专76 专145 1:03 1.130 34.129
Jiaomen West 角门西  4  51 72 474 501 529 556 646 998 特14 夜18 专26 专145 1:06 1.254 35.383
Caoqiao 草桥  Daxing Airport 
381 410 423 434 456 483 497 529 676 679 夜22 1:09 1.688 37.071
Jijiamiao 纪家庙 1:11 1.547 38.618
Shoujingmao 首经贸 67 351 692 912 1:14 1.143 39.761
Fengtai Railway Station 丰台站 专4 1:17 1.717 41.478
Niwa 泥洼 349 395 459 678 845 1:19 0.954 42.432
Xiju 西局  14  83 323 458 480 483 531 830 958 969 973 夜36 1:21 0.749 43.181
Liuliqiao 六里桥  9  57 133 477 491 554 568 941 941快 982 专3 1:24 1.584 44.765
Lianhuaqiao 莲花桥 62 89 323 420 603 890 977 夜30 专3 1:28 2.392 47.157 Haidian
Gongzhufen 公主坟  1  1 32 33 40 52 62 64 68 74 76 77 89 94 300 300快 308 323 335 337 370 374 394 420 437 491 603 624 631快 698 977 977快 特8 夜1 夜5 夜30 1:30 1.016 48.173
Xidiaoyutai 西钓鱼台 27 33 40 62 85 87 92 97 121 335 414 481 612 627 632 634 653 686 693 698 701 967 977 977快 BRT4(快速公交4) 夜13 夜16 1:33 2.386 50.559
Cishousi 慈寿寺*  6  33 40 61 73 85 481 507 632 夜3 专98 1:35 1.214 51.773
Chedaogou 车道沟* 33 40 85 87 114 334 347 360 360快 424 437 450 481 604 609 610 632 658 夜12 1:37 1.590 53.363
Changchunqiao 长春桥 33 74 79 355 360 365 424 425 437 539 611 644 664 688 921 1:39 1.205 54.568
Huoqiying 火器营 74 424 437 专75 1:41 0.961 55.529
— ↓ Loop line - towards Bagou ↓ — 1.495 57.024
  1. The Jiandemen Station straddles the border between Haidian and Chaoyang Districts.

Technology

Rolling Stock

A mockup of the front car of a DKZ34 train, November 2011

Line 10 utilizes a fleet of 6-car DKZ15 trains manufactured by Changchun Railway Vehicles. Initially when Phase I opened the line was operated with a fleet of only 40 trainsets (240 cars).[27] Some sets operated on the Olympic section of Line 8 before Line 8 was extended and acquired its own dedicated rolling stock.[28] When Line 10 Phase II opened the fleet was expanded to 84 trains.[29] However the two existing depots serving Line 10 had insufficient capacity for the entire fleet. Therefore, only 76 trainsets could operate on the line with 8 being temporary stored in other Beijing Subway depots.[30] With the opening of the new depot in Songjiazhuang and the need to reduce the headway on line to decrease crowding, an additional 32 trainsets have been ordered. The fleet will grow to 116 trainsets allowing Line 10 to operate at a headway of every 2 minutes throughout the line during rush hour.[31]

ModelImageManufacturerYear BuiltAmount in ServiceFleet NumbersDepot
DKZ15 CRRC Changchun Railway Vehicles
Beijing Subway Rolling Stock Equipment
CRRC Dalian
2007 43 W401–W443 Wanliu
Wulu
DKZ34 2011 73 10 044–10 116

Signaling system

Siemens Transportation Systems and China Railway Signaling & Communication Corp. have equipped the entire line with Siemens's Trainguard MT Communication Based Train Control (CBTC) system.[32] As a fallback, ETCS Level 1 is also available.[33]

Notes

    References

    1. "Archived copy" 北京市人大代表丁树奎:地铁10号线客流压力大 建议修建复线. Nanfang. Archived from the original on 2019-01-17. Retrieved 2019-01-15.CS1 maint: archived copy as title (link)
    2. 2014年4月30日综合交通总体运行情况. 北京市交通信息中心 北京市交通运行监测调度中心. Archived from the original on 2014-05-02. Retrieved 2014-05-02. |date=2014-05-01}}
    3. Chen Lin (陈琳); Liu Yang (刘洋); Zhang Lu (张璐) (2013-05-06). 北京地铁10号线贯通全长57公里 跑一圈近2小时. Beijing Morning News.
    4. "Beijing Subway Line 10: "If you like it then you should have put a ring round it"". Explore Metro. Retrieved 2013-05-06.
    5. Chen Lin (陈琳) (2013-04-30). 北京地铁10号线将"成环" 全程57公里104分钟 [Beijing Subway Line 10 to "complete loop"; the full 57 km (35 mi) journey will take 104 minutes]. Retrieved 2013-05-05.
    6. "北京地铁诞生记:周总理称筹建地铁是为备战(第一部分)". 北京日报. 新华网. 2007-09-28. Retrieved 2009-01-23.
    7. "北京城市轨道交通线网调整规划". 郭春安. Archived from the original on 2010-12-05. Retrieved 2009-07-29.
    8. 北京地铁10号线一期奥运前竣工 解读全部站点. 搜狐. 2007-10-08. Retrieved 2009-07-29.
    9. (Chinese) 北京地铁10号线二期12月28日开工 京华时报 Nov. 4, 2008
    10. "北京:地铁10号线二期12月28日开工 2013年竣工". Archived from the original on 2010-01-03. Retrieved 2009-07-29.
    11. 李贵民 (2010-03-29). "北京丰台火车站改造扩建工程提上日程". Retrieved 2013-01-20.
    12. 梁琦 (2011-01-05). "丰台站改扩建 启动拆迁前期准备". Archived from the original on 2013-07-06. Retrieved 2013-01-20.
    13. 林阿珍 (2010-06-12). "七千人签名反对地铁"三站合一"". Archived from the original on 2013-12-24. Retrieved 2013-01-20.
    14. 耿诺 (2010-07-30). "北京地铁10号线两车站北移与丰台火车站接驳". Retrieved 2013-01-20.
    15. "北京地铁10号线将于明年6月全线贯通运行". 2012-12-09. Retrieved 2013-01-20.
    16. "10号线二期提前"C"型贯通". 2012-04-19. Archived from the original on 2012-06-22. Retrieved 2013-01-20.
    17. 罗源源. "地铁丰台站有望下月封顶". Archived from the original on 2013-12-24. Retrieved 2013-01-21.
    18. "4条地铁新线12月30日试运营". 北京市重大项目建设指挥部办公室. 2013-01-08. Archived from the original on 2013-12-24. Retrieved 2013-01-20.
    19. "日均客流超过1号线 地铁10号线变得最拥挤". 2013-01-07. Archived from the original on 2013-04-24. Retrieved 2013-01-07.
    20. 李秋萌 (2013-05-02). "环线运营后 10号线东段将取消大站快车". Archived from the original on 2014-12-31. Retrieved 2013-05-05.
    21. (Chinese)"北京地铁10号线拟明年5月全线"O"形贯通". 北京晨报. Retrieved 19 December 2012.
    22. "BII Line 10 Phase II page" (in Chinese).
    23. 北京地铁10号线贯通一个月客流增近八成. chinanews. Retrieved 2013-06-06.
    24. 10号线列车时刻表 | 北京地铁官方网站 Archived 2012-12-27 at the Wayback Machine. Bjsubway.com (2013-05-21). Retrieved on 2013-07-12.
    25. (Chinese) "北京地铁地铁10号线三个派出所正式挂牌办公". 竞报. July 20, 2008. Retrieved 2008-07-22.
    26. "站间公里数 北京地铁官方网站".
    27. 孟环 (2007-12-03). "北京地铁10号线首批车辆进驻万柳车辆段". Retrieved 2013-01-20.
    28. "北京地铁8号线二期北段通车 回龙观25分钟进城". 2011-12-31. Retrieved 2013-01-20.
    29. "10号线二期将于年底开通试运营". 2012-11-22. Archived from the original on 2013-10-19. Retrieved 2013-01-19.
    30. 陈琳 (2013-04-03). "北京地铁10号线13日起试跑整圈". Retrieved 2013-07-22.
    31. 李博 (2013-05-06). "10号线昨日终成"环"" (PDF). 首都建设报. Retrieved 2013-07-22.
    32. "Beijing opens world's longest CBTC-based metro line". Siemens AG. Retrieved 2013-04-29.
    33. "Metro Line 10 (Olympic Line), Wanliu - Jinsong, Beijing". Siemens AG. Retrieved 2008-07-06.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.