Line 17 (Beijing Subway)

Line 17 of the Beijing Subway (Chinese: 北京地铁17号线; pinyin: běijīng dìtiě shíqī hàoxiàn) is a rapid transit line under construction in Beijing.[4][5] The line is fully underground with a total length of 49.7 km (30.9 mi).[6] The line is scheduled to open in 2022.[1] It will be operated by Beijing MTR Corporation Limited.[2]

Line 17
 17 
Project headquarters of Line 17 Dongdaqiao station
Overview
Other name(s)M17 / R2 (planned name)
TypeRapid transit
SystemBeijing Subway
StatusUnder construction
TerminiFuture Science Park North
Yizhuang Zhanqianqu South
Stations21
Operation
Opened2022[1] (Planned)
Operator(s)Beijing MTR Corporation Limited[2]
Characterunderground[3]
Rolling stock8-car Type A
Technical
Line length49.7 km (30.9 mi)
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed100 km/h (62 mph)
Route map

Future Science Park North
Wenyu river
Future Science Park South
Xiejiacun depot
Tiantongyuan East
Qing river
Qingheying
Line 13 crossing
Shuangsha railway crossing
Yongshiying
Beixiao river
line 13 Xizhimen
Wangjing West
line 13 Dongzhimen
Taiyanggong
outer - inner
Ba river
Xibahe
Sijiqing - Guanzhuangluxikou
connects line 12
Xiangheyuan
Liangma river
Workers' Stadium
Dongsi Shitiao - Caogezhuang North
connects line 3
Dongdaqiao
Guangqudonglu
Yong'anli
Pingguoyuan - Sihui East
Tonghui river
Jingha railway crossing
Guangqumenwai
Beijing West railway station - Universal Beijing Resort
Panjiayuan West
Shilihe
Zhangguozhuang - Shangezhuang
inner - outer
Chaoyanggang
Fengshuang railway
Jingjin ICR
Beishenshu
Tonghui irrigate canal
Ciqu North
Ciqu
Ciqu South yard
Yizhuang Zhanqianqu South

Description

Line 17 is planned to run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[7][8] The line is fully underground with a total length of 49.7 km (30.9 mi).[9][8] The expected end to end travel time to be approximately 56 minutes.[10] When complete, the line will provide relief to the congestion on Line 5, Line 10 and Line 13.[10]

Rolling stock

Line 17 will use 8-car Type A rolling stock.[5]

Stations

Station Name Connections Distance
km
English Chinese
Future Science Park North 未来科学城北区      
Future Science Park South 未来科学城南区      
Tiantongyuan East 天通苑东      
Qingheying 清河营      
Yongshiying 勇士营      
Wangjing West 望京西  13   15     
Taiyanggong 太阳宫  10     
Xibahe 西坝河  12     
Xiangheyuan 香河园      
Workers' Stadium 工人体育场  3     
Dongdaqiao 东大桥  6   28     
Yong'anli 永安里  1     
Guangqumenwai 广渠门外  7     
Panjiayuan West 潘家园西      
Shilihe 十里河  10   14     
Shibalidian[lower-alpha 1] 十八里店      
Chaoyanggang 朝阳港      
Beishenshu 北神树      
Ciqu North 次渠北      
Ciqu 次渠  Yizhuang     
Yizhuang Zhanqianqu South 亦庄站前区南      
  1. The station is not included in the original plan. It was added in the plan in 2018.[11]

History

In January 2011, an official with the city's planning committee indicated that Line 17 of the subway was planned to run east–west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.[12] However, the line run through Central Business District is known as Line 28 now.

In February 2012, the city's planning committee identified a different Line 17, as a line planned for 2020, that would run north–south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5.[13] On June 15, 2012, the city government disclosed tentatively planned stations for the line.[14][7][15][8]

On October 10, 2013, city authorities confirmed that Line 17 would run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[8] Construction was expected to begin in 2014 and Line 17 would have a total length of 49.7 km (30.9 mi).[8]

Construction of the line began in 2015.[16][17]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.