Solar One Ceylon Power Station

Solar One Ceylon Power Station
Country Sri Lanka
Location Welikanda
Status Operational
Commission date January 2017
Owner(s) Windforce (Pvt) Ltd
Operator(s) Solar One Ceylon
(Private) Limited
Solar field
Type Flat-panel PV
Site area 19.95 acres (8.07 ha)
Power generation
Nameplate capacity 12.56 megawatt
Annual net output 20,000 MWh

The Solar One Ceylon Power Station is a 12.56-megawatt solar photovoltaic farm built in January 2017 at Welikanda, in the Polonnaruwa District of Sri Lanka. The solar farm utilizes 315W and 320W polycrystalline modules manufactured by JA Solar Holdings, which are installed over 624 single-axis solar trackers supplied by the Spanish firm Grupo Clavijo.[1] The trackers are expected to boost production up by 20%, compared to a fixed tilt setup.[2]

Hayleys partly funded the project, which is developed and owned by Windforce (Private) Limited, a Sri Lankan company well-known for working closely with the government in the energy market. The facility took five months to build, and was ceremonially declared open by the Ministry of Power and Renewable Energy Ranjith Siyambalapitiya and deputy minister Ajith Perera. The solar farm is expected to produce approximately 20,000 MWh annually.[2]

See also

References

  1. "Solar One Ceylon Power Plant Completed In Sri Lanka". Energyinsight.info. 3 February 2017. Retrieved 31 October 2017.
  2. 1 2 "Hayleys unveils Sri Lanka's largest capacity solar power plant in Welikande". Lanka Business Online. 16 January 2017. Retrieved 31 October 2017.
  • "Windforce Power Projects: Solar One Ceylon". Windforce.lk. Retrieved 31 October 2017.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.