Line 10 (Shanghai Metro)
Line 10 | |||
---|---|---|---|
| |||
| |||
Overview | |||
Other name(s) | M1 (planned name) | ||
Type | Rapid transit | ||
System | Shanghai Metro | ||
Status | Northeast extension to Jilong Road under construction | ||
Locale |
Minhang, Changning, Xuhui, Huangpu, Jing'an, Hongkou, and Yangpu districts Shanghai | ||
Termini |
Xinjiangwancheng Hangzhong Road / Hongqiao Railway Station | ||
Stations | 31 | ||
Daily ridership | 990,000 (2018 peak)[1] | ||
Operation | |||
Opened | April 10, 2010 | ||
Character | Underground | ||
Technical | |||
Line length | 36 km (22.37 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | Overhead lines (1500 volts DC) | ||
Operating speed | 80 km/h (49.71 mph) | ||
|
Line 10, Shanghai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 10 is a southwest-northeast line of the Shanghai Metro network. It officially opened for service on April 10, 2010,[2][3] and has a main line and a branch line. The first phase of the main line currently runs from Xinjiangwancheng to Longxi Road; the branch line runs from Longxi Road on the main line to Hangzhong Road. The extension to Hongqiao Railway Station has operated since November 2010. It connects the Hongqiao International Airport with the downtown core of Shanghai, and also the dense residential districts of Yangpu and Hongkou.[4] The line is colored light purple on system maps.
Stations
Service routes[5] |
Station № |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
● | L10/01 | Hongqiao Railway Station | 虹桥火车站 | 2 17 |
0.00 | 0.00 | Minhang | |
● | L10/02 | Hongqiao Airport Terminal 2 | 虹桥2号航站楼 | 2 |
0.56 | 0.56 | ||
● | L10/03 | Hongqiao Airport Terminal 1 | 虹桥1号航站楼 | 1.93 | 2.49 | |||
● | L10/04 | Shanghai Zoo | 上海动物园 | 1.96 | 4.45 | Changning | ||
● | | | L10/05-3 | Hangzhong Road | 航中路 | 1.03 | 5.48 | Minhang | |
● | | | L10/05-2 | Ziteng Road | 紫藤路 | 1.19 | 6.67 | ||
● | | | L10/05-1 | Longbai Xincun | 龙柏新村 | 2.38 | 9.05 | ||
● | ● | L10/05 | Longxi Road | 龙溪路 | 1.27 | 10.32 | Changning | |
● | ● | L10/06 | Shuicheng Road | 水城路 | 1.27 | 11.59 | ||
● | ● | L10/07 | Yili Road | 伊犁路 | 1.25 | 12.84 | ||
● | ● | L10/08 | Songyuan Road | 宋园路 | 0.81 | 13.65 | ||
● | ● | L10/09 | Hongqiao Road | 虹桥路 | 3 4 | 0.99 | 14.64 | Xuhui |
● | ● | L10/10 | Jiaotong University | 交通大学 | 11 | 1.27 | 15.91 | |
● | ● | L10/11 | Shanghai Library | 上海图书馆 | 1.18 | 17.09 | ||
● | ● | L10/12 | South Shaanxi Road | 陕西南路 | 1 12 | 1.54 | 18.63 | Huangpu |
● | ● | L10/13 | Xintiandi | 新天地 | 13 | 1.68 | 20.31 | |
● | ● | L10/14 | Laoximen | 老西门 | 8 | 0.86 | 21.17 | |
● | ● | L10/15 | Yuyuan Garden | 豫园 | 1.35 | 22.52 | ||
● | ● | L10/16 | East Nanjing Road | 南京东路 | 2 | 1.17 | 23.69 | |
● | ● | L10/17 | Tiantong Road | 天潼路 | 12 | 0.71 | 24.40 | Jing'an |
● | ● | L10/18 | North Sichuan Road | 四川北路 | 0.92 | 25.32 | Hongkou | |
● | ● | L10/19 | Hailun Road | 海伦路 | 4 | 0.92 | 26.24 | |
● | ● | L10/20 | Youdian Xincun | 邮电新村 | 1.19 | 27.43 | ||
● | ● | L10/21 | Siping Road | 四平路 | 8 | 1.01 | 28.44 | |
● | ● | L10/22 | Tongji University | 同济大学 | 0.97 | 29.41 | Yangpu | |
● | ● | L10/23 | Guoquan Road | 国权路 | 0.84 | 30.25 | ||
● | ● | L10/24 | Wujiaochang | 五角场 | 1.02 | 31.27 | ||
● | ● | L10/25 | Jiangwan Stadium | 江湾体育场 | 0.60 | 31.87 | ||
● | ◐ | L10/26 | Sanmen Road | 三门路 | 1.26 | 33.13 | ||
● | ◐ | L10/27 | East Yingao Road | 殷高东路 | 1.00 | 34.13 | ||
● | ◐ | L10/28 | Xinjiangwancheng | 新江湾城 | 0.79 | 34.92 | ||
L10/29 | Guofan Road | 国帆路 | Yangpu | |||||
L10/30 | Shuangjiang Road | 双江路 | Pudong | |||||
L10/31 | West Gaoqiao | 高桥西 | ||||||
L10/32 | Gaoqiao | 高桥 | ||||||
L10/33 | Gangcheng Road | 港城路 | 6 | |||||
L10/34 | Jilong Road | 基隆路 |
Note: Eastbound trains from Hongqiao Railway Station may terminate at Jiangwan Stadium.
Important stations
- Hongqiao Railway Station - located within Hongqiao Railway Station, interchange with Line 2 and Line 17.
- Hongqiao Airport Terminal 2 - located within Hongqiao International Airport, interchange with Line 2 (Shanghai Public Transport Card required).
- Shanghai Zoo - Located near the Shanghai Zoo in Changning District.
- South Shaanxi Road - Interchange with Line 1.
- Xintiandi - Located in the Xintiandi shopping area.
- Laoximen - Interchange with Line 8.
- Yuyuan Garden - Located near the famous Yuyuan Garden.
- East Nanjing Road - Located under the pedestrianised Nanjing Road and close to The Bund. Interchange with Line 2.
- Tongji University station - Located near the Tongji University.
History
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Longxi Road — Xinjiangwancheng | 10 April 2010 | 24.76 km (15.39 mi) | 24 | Phase I (1st section) |
Hangzhong Road — Longxi Road | 4.84 km (3.01 mi) | 3 | ||
Hongqiao Railway Station — Longxi Road | 30 November 2010 | 5.8 km (3.60 mi) | 4 | Phase I (2nd section) |
Future
The second phase, under construction, is a northern extension of the first phase of Line 10 from Xinjiangwancheng to Jilong Road. This phase will be completed by 2018.
Rolling stock
Type | Time of manufacturing | Series | Sets | Assembly | Notes |
---|---|---|---|---|---|
Type A | 2009-2010 | 10A01 | 41 | Tc+Mp+M+M+Mp+Tc | Manufactured by Alstom and CSR Puzhen. |
Type A | 2017- | 10A02 | 26 | Tc+Mp+M+M+Mp+Tc | Manufactured by CSR Puzhen. |
References
- ↑ 1223.1万人次!上海地铁全网客流昨天再创新高 (in Chinese). 新民网. 2018-03-10. Retrieved 2018-03-10.
- ↑ 10号线4月10日提前开通试运营. Shanghai Metro. Retrieved 9 April 2010.
- ↑ http://2010.qq.com/a/20100409/000082.htm. Retrieved 9 April 2010.
- ↑ "Shanghai metro reaches Hongqiao Airport". Railway Gazette International. 2010-03-16.
- ↑ "10号线9月25日起增设小交路 夜间加开定点加班车".