Line 15 (Shanghai Metro)

Line 15
 15 
Overview
Other name(s) L1 (planned name)
Type Rapid transit
System Shanghai Metro
Status Under construction
Locale Shanghai
Stations 30
Technical
Line length 42.3 km (26.3 mi)
Track gauge 1,435 mm (4 ft 8 12 in)

Line 15 of the Shanghai Metro is a metro line currently under construction in the city of Shanghai and scheduled to open in 2020. The line begins at Gucun Park in Baoshan District, and terminates at Zizhu Hi-Tech Industrial Development Zone in Minhang District, via West Shanghai Railway Station and Shanghai South Railway Station. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations.[1][2] Line 15 will interchange with lines 1, 2, 3, 7, 9, 10, 11, 12, 13 and 14.[3]

Controversy

On December 28, 2011 the northern terminus of the line was shifted from Qihua Road station to an independent station called Jinqiu station beside Line 7 between Qihua and Shanghai University station but with no direct transfers to Line 7.[4] This has stirred controversy among residents over Line 15's already lack of convenient connections with other major subway lines such as Line 2 and Line 10.[5] Planners reconsidered and extended Line 15 north of Jinqiu station to connect with Line 7 at Gucun Park station.[6]

Stations

Station name Connections Distance
km
Location
English Chinese
Gucun Park 顾村公园  7  0.0 0.0 Baoshan
Jinqiu Road 锦秋路  7  (at Shanghai University)[note 1]
Fengxiang Road 丰翔路
Nanda Road 南大路
Qi'an Road 祁安路 Putuo
Gulang Road 古浪路
East Wuwei Road 武威东路
West Shanghai Railway Station 上海西站  11  Shanghai West railway station SXH
Tongchuan Road 铜川路  14 [note 2]
North Meiling Road 梅岭北路
Daduhe Road 大渡河路  13 
Changfeng Park 长风公园
Tianshan Road 天山路  2  (at Loushanguan Road)[7][note 3] Changning
Gubei Road 古北路 Yan'an BRT[note 4]  10  (at Yili Road)[7][note 5]
Yaohong Road 姚虹路
Wuzhong Road 吴中路 Minhang
Guilin Road 桂林路  9  Xuhui
Guilin Park 桂林公园  12 
Shanghai South Railway Station 上海南站  1   3   Jinshan  Shanghai South railway station SNH
Bose Road 百色路
Luoxiu Road 罗秀路
Zhumei Road 朱梅路
Jinghong Road 景洪路
South Hongmei Road 虹梅南路 Minhang
Jingxi Road 景西路
Shujian Road 曙建路
Shuangbai Road 双柏路
Yuanjiang Road 元江路
Yongde Road 永德路
Zizhu Hi-Tech Industrial Development Zone 紫竹高新区

As of 2018, construction sites are visible at stations like Guilin Road and Guilin Park.

References

  1. 关于轨道交通15号线专项规划(草案)的公示. www.shgtj.gov.cn (in Chinese). Retrieved 2017-08-06.
  2. 上海轨交15号线开始盾构施工 跨宝山至闵行5个区设30站. NetEase (in Chinese). 2017-09-08. Retrieved 2018-01-16.
  3. 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  4. "关于轨道交通15号线(祁华路停车场—南大路段)专项规划(调整)的公示". 上海规划和国土资源. 2011-12-28.
  5. 实习生叶页. "无法与多线换乘引热议 换乘方案未定或进一步优化修改-换乘 公示 天山路 规划 线 该图 网友 车站 市民 推说-上海频道-东方网". sh.eastday.com. Retrieved 2017-08-06.
  6. "关于轨道交通15号线南段车辆基地选址专项规划调整的公示". 2015-02-17.
  7. 1 2 Changning District (2017-09-17). 轨交15号线首台盾构成功始发,未来长宁人出行更方便啦!. Weibo (in Chinese). Retrieved 2018-01-16.

Notes

  1. Out-of-station virtual transfer to Line 7 at Shanghai University via street level – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer here to continue their journey.
  2. Line under construction.
  3. Out-of-station virtual transfer to Line 2 at Loushanguan Road via underground passageway – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer here to continue their journey.
  4. Yan'an Road Mid-Capacity Bus System has preserved Gubei Road Station, but it is not open to public at this time.
  5. Out-of-station virtual transfer to Line 10 at Yili Road via street level – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer here to continue their journey.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.