Pemalang-Batang Toll Road

Pemalang-Batang Toll Road
Pematang Toll Road
Route information
Part of
Maintained by PT Pemalang Batang Tol Road
Length 39 km (24 mi)
Major junctions
From Pemalang
  Batang-Semarang Toll Road
Pejagan-Pemalang Toll Road
To Batang
Location
Major cities Pekalongan, Pemalang
Highway system
Roads and Highways in Indonesia

Pemalang-Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang, Central Java, Indonesia . This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java . This toll road is planned to be used travelers during Eid ULl Fitre holiday in 2017, although not yet covered with asphalt. Land acquisition was initially targeted for completion in December 2016, but due to some constraints, the land acquisition target withdrew to January 2017.[1]

Sections

This toll road has two sections[2],

  • Section I: (Pemalang - Pekalongan), length 20,05
  • Section II: (Pekalongan - Batang), length 16,7 km.

Toll gates

NamekmDestination
Pemalang306Pantura
Pekalongan326Pekalongan
Batang
Batang343Batang
Kendel
Semarang
Batang-Semarang Toll Road

References

  1. "Proyek Jalan Tol Pemalang-Batang Bisa Dilintasi Lebaran 2017". Tempo. Retrieved 23 December 2017.
  2. "Merak-Semarang Tersambung Tol Lebaran 2017, Begini Kondisi Lahannya". Detik. Retrieved 23 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.