Jagorawi Toll Road

Coordinates: 06°15′11.20″S 106°52′21.52″E / 6.2531111°S 106.8726444°E / -6.2531111; 106.8726444

Jakarta-Bogor-Ciawi
Jagorawi
Route information
Maintained by PT Jasa Marga Tbk
Length 46 km (29 mi)
Major junctions
From Cawang
  Jakarta Inner Ring Road

Jakarta Outer Ring Road
Jakarta Outer Ring Road 2
Bogor Ring Road
Bogor-Ciawi-Sukabumi Toll Road (under construction)
To Ciawi
Location
Major cities East Jakarta, Depok, Bogor Regency, Bogor
Highway system
Roads and Highways in Indonesia
The Jagorawi Toll Road

The Jagorawi Toll Road was the first toll road in Indonesia. Construction on the highway began in 1973 by some 200 workers at a cost of 350 million Indonesian rupiah per kilometer; it was officially opened by President of Indonesia Suharto on 9 March 1978.[1]

The Jagorawi Toll Road links the capital city of Jakarta to the West Javanese cities of Bogor and Ciawi. It has a length of more than 60 km going north and southbound and is operated by PT Jasa Marga, a state-owned enterprise. The name Jagorawi is an acronym of areas which it connects, which are Jakarta, Bogor, and Ciawi.

The toll road has achieved break-even point, making it the cheapeast toll road in Indonesia based on price per kilometer.

History

In 1973, the Indonesian government began building the first highway linking the capital Jakarta with the city of Bogor. When the road was still in its construction phase, it was not officially a toll road. When the highway was nearly finished, the government began considering ways to execute the operation and maintenance of the highway autonomously, without burden on governmental financing. For that purpose, the Labor Department suggested that the portion of the road between Jakarta and Bogor be changed to a toll road. Private investors, with government financing, created the semi-private corporation Jasa Marga and arranged to manage the highway two weeks before its opening.

Exits

KMToll Gate/InterchangeAbbreviationsLocationDestination
KM 2Cililitan Toll GateCLLTEast Jakarta, DKI JakartaCawang
Halim Perdanakusuma Airport
Jakarta Inner Ring Road
Soekarno–Hatta International Airport
KM 4Ramp Taman Mini Toll GateTMIITMII
Pondok Gede
Kramat Jati
Cipayung
KM 7Dukuh Toll GateDKUHJakarta Outer Ring Road
Jakarta–Cikampek Toll Road
Soekarno–Hatta International Airport
KM 8Pasar Rebo Toll GatePSRB
KM 13Cibubur Toll GateCBBRCibubur
Cikeas
Cileungsi
Jonggol
KM 14Cibubur Utama Toll GateCBBUMain gate to Bogor/Ciawi
KM 16Cisalak Toll GateCSLKDepok, West JavaJakarta Outer Ring Road 2
Cinere-Jagorawi Toll Road
Cisalak
Margonda
Depok
KM 18Cimanggis Utama Toll GateCMGUCentral Toll Gate to Jakarta
KM 19Cimanggis Toll GateCMGSCimanggis
Cikeas
Depok
KM 24Gunung Putri Toll GateGNPTBogor Regency, West JavaGunung Putri
Karanggan
Cikeas
KM 27Citeureup Toll GateCTRPCiteureup
Cibinong
Bogor Regency Office
KM 33Sentul Toll GateSNTLSentul Circuit
North Sentul
Indonesia Peace And Security Center
Nanggewer
KM 37Sentul Selatan Toll GateSTLS Bogor, West JavaSouth Sentul
Sentul City

Bogor Ring Road
Kedunghalang
KM 42Bogor Toll GateBGORBogor
Bogor Botanical Garden
Sukaraja
Baranangsiang Terminal
KM 44Ciawi Toll GateCAWIBogor Regency, West JavaCiawi
Puncak
Taman Safari
Sukabumi
Ciawi-Sukabumi Toll Road (Planned)

Facilities

The Jagorawi Toll Road is three lanes wide (in each direction) from Jakarta to Sentul, and it is planned that the road will be widened again through Bogor.

The toll road has two Pertamina gas stations which are combined with restaurants, rest areas, and outlet stores.

Notable accidents

On September 8, 2013, the toll road has been a major point for an accident involving Ahmad Dhani and Maia Estianty's youngest son Dul, primarily on the km 8+200 mark. 7 people were killed in the accident and 8 people were severely injured due to the crash. It was revealed that Dul was driving a black Mitsubishi Lancer, as he lost control of his car and hit the metal separator while going home from Bogor to Jakarta, crashing an oncoming Daihatsu Gran Max and a Toyota Avanza.

Floods

For the first time in January 2014, Jagorawi Toll Road was flooded from Cipinang River at Kilometer 4. The toll road was still operational in both directions, with vehicles driving slowly through the flood. Consequently, the toll road suffered from severe gridlock. [2]

Ciawi–Sukabumi Toll Road

Ciawi–Sukabumi Toll Road is a planned 54-km extension of Jagorawi Toll Road, subdivided into 4 sections:[3]

  • Ciawi–Cigombong, 15 km
  • Cigombong–Cibadak, 12 km
  • Cibadak–West Sukabumi, 14 km
  • West Sukabumi–East Sukabumi, 13 km

Concession is held by PT Trans Jabar Toll and land acquisition at January 2013 is 40 percent and predicted the construction will be initialized at end of 2013. However, construction is delayed due to problematic land acquisition.[4]

References

  1. Arief Rahman Topan, "Jagorawi", Jurnal Republik, 15 September 2007.
  2. "Jagorawi Toll Road Paralyzed due to Heavy Rain". January 13, 2014.
  3. "Pembangunan tol Ciawi-Sukabumi dimulai akhir 2013". February 6, 2013.
  4. Suryanis, Afrilia. "Pemprov Geber Pembangunan Tol Bocimi". Republika Online. Retrieved 14 March 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.