North Wales Coast Line

North Wales Coast Line
Overview
Type Heavy Rail
System National Rail
Locale Anglesey
Gwynedd
Conwy
Denbighshire
Flintshire
Cheshire
Termini Crewe
Holyhead
Stations 18
Operation
Opened 1850
Owner Network Rail
Operator(s) Transport for Wales Rail
Virgin Trains
Character Coastal
Rolling stock Class 67
Class 150 "Sprinter"
Class 153 "Super Sprinter"
Class 158 "Express Sprinter"
Class 175 "Coradia"
Class 221 "SuperVoyagers"
Technical
Line length 84.38 miles (135.80 km)
Number of tracks Double track mostly except on Britannia Bridge between Bangor and Llanfair PG where it is single track
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Operating speed 90 mph (140 km/h) maximum
Route map
North Wales Coast Line
to Dublin
and formerly Dún Laoghaire
Holyhead
Stanley Embankment
Valley
Rhosneigr
Tŷ Croes
Bodorgan
Anglesey Central Railway
to Amlwch
Gaerwen
Llanfairpwll
Britannia Bridge
over Menai Strait
Britannia Bridge
Bangor & Carnarvon Rly
to Caernarvon
Menai Bridge
Bangor
Bethesda branch line
Penrhyn Quarry Railway
Port Penrhyn
Aber
Llanfairfechan
Penmaenmawr
Conway Marsh
Conwy
Conwy Railway Bridge
over River Conwy
Llandudno
Deganwy
Llandudno Junction
Conwy Valley line
Mochdre & Pabo
Colwyn Bay
Old Colwyn
Llysfaen
Llandulas
Abergele & Pensarn
Foryd
Vale of Clwyd Railway
to Denbigh and Corwen
Rhyl
Dyserth branch line
Prestatyn
Talacre
Mostyn
Holywell Junction
Holywell branch line
Bagillt
Flint
Connah's Quay
Shotton
Borderlands line
Queensferry
Sandycroft
Mold Railway
Saltney Ferry
Wales
England
border
Shrewsbury–Chester line
Dee Bridge
over River Dee
Roodee Viaduct
Shropshire Union Canal
Northgate Tunnel
Wirral line
ChesterMerseyrail
Chester–Manchester line
Mid-Cheshire line
Waverton
Whitchurch & Tattenhall Rly
Tattenhall Road
Beeston Castle
and Tarporley
Calveley
Worleston
West Coast Main Line
Crewe–Manchester line
Crewe
Crewe–Derby line
Welsh Marches line
West Coast Main Line

The North Wales Coast Line (Welsh: Rheilffordd Arfordir Gogledd Cymru), also known as the North Wales Main Line,[1] is the railway line from Crewe to Holyhead. Virgin Trains consider their services along it to be a spur of the West Coast Main Line.

In April 2006, Network Rail organised its maintenance and train control operations into "26 Routes". The main line through Crewe forms part of Route 18 (The West Coast Main Line). The North Wales Coast Line from Crewe (North Junction) to Chester and North Wales has been designated Route 22 (North Wales and Borders) and this includes the line to Chester from Acton Grange Junction, south of Warrington. The line from Shrewsbury to Chester via Wrexham is Route 14 (South and Central Wales and Borders) (until Saltney Junction).

The line is not currently electrified, so Virgin Trains, the current operator of the InterCity West Coast franchise, currently uses its diesel Super Voyagers, which they have done since December 2007, on routes to Holyhead. There are no official plans to electrify the line, but both the Welsh government and former Chancellor George Osborne have indicated that there is a strong case for electrification in the future.

The line contains several notable engineering structures, namely Conwy railway bridge across the River Conwy, and Britannia Bridge across the Menai Strait.

History

The first section from Crewe to Chester was built by the Chester and Crewe Railway and absorbed by the Grand Junction Railway shortly before opening in 1840. The remainder was built between 1844 and 1850 by the Chester and Holyhead Railway Company as the route of the Irish Mail services to Dublin. The line was later incorporated in the London and North Western Railway. Between Chester and Saltney Junction, the line was, from the start, used by trains of the Shrewsbury and Chester Railway later to be incorporated in the Great Western Railway.

So important was the line in the 19th and early 20th centuries to passenger, mail and freight traffic between Britain and Ireland that the world's first experimental and operational water troughs were installed at Mochdre between Colwyn Bay and Llandudno Junction. Their purpose was to enable steam engines (especially on the Irish Mail) to collect water without stopping. Later, considerable stretches of line between Chester and Colwyn Bay were quadrupled to increase line capacity but these sections have now been reduced to two tracks.

Main calling points

The main towns served by the route are listed below:

Services

Principal through passenger services are London Euston to Holyhead, Bangor, Chester and Wrexham General operated by Virgin Trains (West Coast) and Crewe to Holyhead, Cardiff to Holyhead and Manchester to Llandudno currently operated by Transport for Wales Rail (who replaced Arriva Trains Wales). A revised timetable has operated since December 2005 incorporating a new service to and from Cardiff Central every two hours. The line still provides the UK railway part of the through passenger service to Dublin using fast car ferries from Holyhead to Dublin Port.

Future

North Wales Coast Line between Chester and Saltney, showing the two tracks over the River Dee. The path of the other two tracks which were removed can also be seen.

The Welsh Government would like the line to be electrified, especially if Crewe becomes a rail hub due to HS2 in 2026.[2] Chancellor George Osborne said in July 2015 that there was a "really strong case" for electrification of the line.[3] The Electrification Task Force said that the Chester to Crewe line was a Tier 2 priority for being electrified in the CP6 period (2019-2024).[4] A £50 million signalling upgrade programme is currently being carried out between Shotton and Colwyn Bay, which will see modular colour lights supervised from the South Wales Rail Operating Centre in Cardiff replace the manual signal boxes and mixture of semaphore and older colour lights currently in use, in March 2018.[5]

References

  1. "Route Utilisation Strategy - Wales" (PDF). Network Rail. 2011. Retrieved 7 February 2012.
  2. Williamson, David (21 March 2014). "HS2 report has pushed electrification of North Wales rail line forward, Welsh Secretary claims". Wales Online. Retrieved 27 November 2015.
  3. "'Strong case' for north Wales rail electrification". BBC News. 17 July 2015. Retrieved 27 November 2015.
  4. "Electrification Task Force Final Report Revealed". Rail North. 5 March 2015. Retrieved 27 November 2015.
  5. £50m North Wales Railway Upgrade Project underway Network Rail Media Centre; Retrieved 4 August 2017

Further reading

Route map:

KML is from Wikidata
  • Allen, David (18 June – 1 July 1997). "Sun, sea, sand...and semaphores". RAIL. No. 307. EMAP Apex Publications. pp. 40–45. ISSN 0953-4563. OCLC 49953699.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.