Peddapalli–Nizamabad section

Peddapalli-Nizamabad Line
Route Map
Overview
System Diesel (Electrification in progress)
Status Operational
Locale Telangana
Termini Nizamabad Railway Station
Peddapalli Railway Station
Stations ~16
Services Delhi-Chennai line
Secunderabad-Manmad section
Operation
Opened 25 March 2017
Owner Indian Railway
Operator(s) South Central Railway Zone (India)
Technical
Line length 177 km
Track gauge Broad gauge 1,676 mm (5 ft 6 in)

Peddapalli-Nizamabad Railway Line is a single broad gauge railway line in the Indian state of Telangana. It connects Nizamabad city (Hyderabad Division)of Nizamabad District to Peddapalli town (Secunderabad Division) of Peddapalli District under South Central Railway zone. It reduces the distance between North Telangana Cities Nizamabad-Karimnagar-Warangal (262 km) when compared to present running route of Nizamabad-Secunderabad-Warangal(303 km).

Peddapalli Railway station is located on Kazipet-Balharshah section of Delhi-Chennai line which is known as Grand Trunk(G.T) line while Nizamabad Railway Station is located on Secunderabad-Manmad railway line.

History

Peddapalli-Karimnagar-Nizamabad railway line (177 km) was sanctioned by the Late Shri.P.V. Narasimha Rao[1] who was the 10th Prime Minister of India in the year of 1993.[2] It took 23 years to be completed in a phased manner.[3]

The section between Peddapalli and Karimnagar was completed and train services were started in 2001. It took another 6 years to complete the stretch between Karimnagar and Jagityal and passenger trains were extended till Jagityal from 2007. On 29 December 2016 upon the completion of railway tracks between Jagityal and Morthad, the demu trains were further extended till Morthad mandal of Nizamabad district and passenger trains began moving between Karimnagar-Morthad and Peddapalli-Jagityal. After the fund allocation for the remaining section between Morthad and Nizamabad, the works were accelerated and within a year the Peddapalli-Nizamabad line via Karimnagar was ready for operations and the services began from 25 March 2017.

Stations

  • Peddapalli Junction (PDPL)
  • Sultanabad (STBD)
  • Karimnagar (KRMR)
  • Kothapalli(haveli) (KPHI)
  • Gangadhara (GDRA)
  • Podur (PUDR)
  • Mallial Nukapalli (NPML)
  • Lingampet-Jagityal(LPJL)
  • Medipalli (MDPLI)
  • Korutla (KRLA)
  • Metpally(MTPI)
  • Morthad (MRTD)
  • Anksapur (AKSP)
  • Armoor (ARMR)
  • Mamidipalle (MMDPL)
  • Nizamabad Junction (NZB)

Electrification

Single line electrification is sanctioned between Peddapalli and Lingampet Jagityal section (83 km) under Phase 1 Construction.

Passenger Trains

  • Karimnagar-Tirupati-Karimnagar Super Fast Express (12762/12761)
  • Kacheguda- Karimnagar- Kacheguda PASS (57601/02)
  • Karimnagar-Sirpur Town-Karimnagar DEMU (77255/77256)
  • Karimnagar-Lingampet Jagityal-Karimnagar DEMU (77274/77273)
  • Peddapalli-Lingampet Jagityal-Peddapalli DEMU (77258/77257)
  • Nizamabad-Karimnagar-Nizamabad DEMU (77260/77259)

References

  1. "P V Narasimha Rao's projects in North Telangana neglected". Deccan Chronicle. Retrieved 30 August 2014.
  2. "Peddapalli-Nizamabad rail services soon". The Hindu. Retrieved 30 August 2014.
  3. http://www.thehindu.com/news/cities/Hyderabad/23-year-wait-for-railway-line-ends/article17619586.ece
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.