Fossil fuelled
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Status | Notes |
---|---|---|---|---|---|---|
SA | Kingston [1] | Hybrid Energy | 36°48′S 139°48′E / 36.8°S 139.8°E (Check) | 300 | Cancelled | Brown coal |
SA | Arckaringa [2] | Altona Resources[3] | 27°30′S 135°30′E / 27.5°S 135.5°E (estimate) | 560[4] | Proposed | Coal to liquid, proposed to have CCS |
NSW | Redbank 2 [5] | Altona Resources | 27°36′S 152°52′E / 27.60°S 152.86°E (estimate) | 151 | Cancelled [6] | Coal tailings-fired power station |
SA | Reeves Plains[7] | Alinta Energy | 34°30′14″S 138°36′40″E / 34.504°S 138.611°E | 300 | Proposed | To be supplied from Moomba-Adelaide pipeline |
QLD | ZeroGen [8] | Government of Queensland[9] | 23°22′S 150°31′E / 23.37°S 150.51°E (estimate) | 300 | Cancelled | Integrated gasification combined cycle (IGCC) with carbon capture and storage (CCS) |
QLD | Spring Gully [10] | Origin Energy | 25°26′46″S 150°00′25″E / 25.446°S 150.007°E (estimate) | 1000 | Proposed | Combined-cycle gas-fired power station. First 500 MW stage was planned to be operational in 2008, but as of 2018 has not been built.[11] |
WA | Bluewaters 3 & 4 [12] | Griffin Energy | 416 | Proposed | Fuel is thermal coal. Project delayed due to decreasing demand.[13] | |
WA | Coolimba [14] | Aviva Corporation Ltd and AES, sold to Westgen | 29°56′56″S 115°12′47″E / 29.949°S 115.213°E (estimate) [15] | 450 | Rejected[16] | Fuel is sub-bituminous coal |
VIC | Shaw River[17] | Santos | 38°11′02″S 142°06′40″E / 38.184°S 142.111°E (estimate) | 1500 | Abandoned[18] | Gas |
VIC | Tarrone [19] | AGL | 38°10′52″S 142°10′48″E / 38.181°S 142.180°E | 920 | Proposed | Gas peaking |
SA | Quarantine Power Station Expansion | Origin Energy | 160/180 | Proposed | Includes an LPG import/storage terminal | |
Hydro
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Commissioning date | Status | Notes |
---|---|---|---|---|---|---|---|
QLD | Burdekin Hydro | Stanwell Corporation | 20°38′37″S 147°08′17″E / 20.6435°S 147.138°E | 37 | Proposed | [20] | |
QLD | Kidston | Genex | 19°05′00″S 144°07′26″E / 19.0833°S 144.124°E | 250 | Proposed | [21][22] | |
SA | Goat Hill Pumped Hydro | Altura Group/Delta Electricity | 220-270 | Proposed | |||
SA | Cultana Pumped Hydro | EnergyAustralia | 225 | Proposed | |||
SA | Highbury Pumped Hydro | Tilt Renewables | 300 | Proposed | |||
Biomass
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Commissioning date | Status | Notes |
---|---|---|---|---|---|---|---|
TAS | Bell Bay Pulp Mill [23] | Gunns | 41°09′18″S 146°55′12″E / 41.155°S 146.92°E | 180 | 2013 | Cancelled | Pulp Mill Biomass |
SA | Yorke Biomass Energy Project | Yorke Biomass Energy Pty Ltd | 15 | Proposed | Will use straw as fuel | ||
SA | Edinburgh Parks Bioreactor Plant Stage 1 | DeLorean Energy | 8 | 2020 | Proposed | Converts food waste into Methane gas | |
SA | Edinburgh Parks Bioreactor Plant Stage 2 | DeLorean Energy | 7 | 2021 | Proposed | Converts food waste into Methane gas | |
QLD | Ingham Integrated Energy Facility | North Queensland Bio-Energy Corporation Limited | 115 | June 2021 | Proposed | [24] | |
Landfill gas
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Commissioning date | Status | Notes |
---|---|---|---|---|---|---|---|
NSW | Woodlawn Bioreactor (units 7 to 12) [25] | EnergyAustralia | 6 | Q3, 2015 to Q4, 2021 | Proposed | Landfill gas | |
NSW | Woodlawn Bioreactor (units 4 to 6) [26] | EnergyAustralia | 3 | Q4 2011 to Q2 2014 | Proposed | Landfill gas | |
NSW | Club Merrylands [27] | Energy Response | 0.8 | Q4 2011 to Q2 2014 | Proposed | Liquid fuel | |
Wind
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Commissioning date | Status | Notes |
---|---|---|---|---|---|---|---|
NSW | Gullen Range | Epuron | 167.9 | Proposed | [28] | ||
QLD | Kennedy Wind Farm | Windlab | 21°S 145°E / 21°S 145°E | 750 | Proposed | [29] | |
QLD | Mount Emerald | Port Bajool Ratch Australia |
17°11′S 145°22′E / 17.183°S 145.367°E | 220 | Proposed | [30] | |
QLD | Crows Nest | AGL Energy | 27°13′S 151°57′E / 27.217°S 151.950°E | 200 | Proposed | ||
QLD | Archer Point | 15°34′S 145°18′E / 15.567°S 145.300°E | 120 | Proposed | [31] | ||
QLD | Clarke Creek Wind and Solar Farm | Lacour Energy | 22°39′25″S 149°24′14″E / 22.657°S 149.404°E | 800 | Proposed | Joint Solar / Wind Project. Battery Storage[32] | |
TAS | TasWind | Hydro Tasmania | 39°52′S 143°59′E / 39.867°S 143.983°E | 600 | Proposed | [33] | |
TAS | Western Plains Wind Farm | Epuron | 40°43′26″S 145°15′40″E / 40.724°S 145.261°E | 40 | Proposed | 13 turbines.[34] | |
QLD | Forsayth Wind Farm | Infigen Energy | 18°29′56″S 143°35′31″E / 18.499°S 143.592°E | 75 | Proposed | [35] | |
QLD | High Road Wind Farm | Ratch Australia | 17°36′S 145°28′E / 17.60°S 145.47°E | 80 | Proposed | [36] | |
QLD | Kaban Green Power Hub | Neoen | 17°34′S 145°24′E / 17.56°S 145.40°E | 130 | Proposed | 100MW of battery storage[37] | |
QLD | Lakeland Wind Farm | Windlab | 15°48′S 144°48′E / 15.8°S 144.8°E | 100 | Proposed | ||
QLD | Archer Point Wind Farm | Wind Power Queensland | 15°48′S 144°48′E / 15.8°S 144.8°E | 240 | Proposed | ||
Solar
State | Project name | Sponsoring company | Coordinates | Capacity in MW | Commissioning date | Status | Notes |
---|---|---|---|---|---|---|---|
QLD | Clarke Creek Wind and Solar Farm | Lacour Energy | 22°39′25″S 149°24′14″E / 22.657°S 149.404°E | 200-400 | Proposed | Joint Solar / Wind Project. Battery Storage[38] | |
QLD | Bulli Creek Solar Farm | Solar Choice
Sun Edison |
27°59′46″S 150°51′18″E / 27.996°S 150.855°E | 2000 | Proposed | Could become largest solar farm in the world when constructed.[39] | |
QLD | Munna Creek Solar Farm | Renewable Energy System Technologies | 25°52′S 152°28′E / 25.87°S 152.46°E | 120 | Proposed | [40] | |
QLD | Moranbah Solar Farm | Adani | 170 | Proposed | [40] | ||
QLD | Oakey Solar Farm (Stage 2) | Oakey 1 AssetCo Pty Ltd | 55 | Proposed | [40] | ||
QLD | Childers Solar Farm | ESCO Pacific | 80 | Proposed | [40] | ||
QLD | Rollingstone Solar Farm | ESCO Pacific | 110 | Proposed | [40] | ||
QLD | Aramara Solar Farm | Eco Energy World Australia | 140 | Proposed | [40] | ||
See also
References
- ↑
- ↑
- ↑ Altona Resources
- ↑ 2014 South Australia Fuel and Technology Report
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on 2012-02-11. Retrieved 2014-11-08.
- ↑
- ↑ "Reeves Plains Power Station Proposal". Alinta Energy. 27 July 2017. Retrieved 11 September 2017.
- ↑
- ↑ "Archived copy". Archived from the original on 2008-08-03. Retrieved 2014-11-08.
- ↑ "Archived copy". Archived from the original on 2009-05-22. Retrieved 2014-11-08.
- ↑ "Origin power station under assessment". www.insideconstruction.com.au. Retrieved 2018-09-21.
- ↑ "Archived copy". Archived from the original on 2012-02-24. Retrieved 2014-11-08.
- ↑ "Bluewaters gets five-year extension". The West Australian. 2015-05-06. Retrieved 2018-09-21.
- ↑ "Archived copy". Archived from the original on 2014-11-08. Retrieved 2014-11-08.
- ↑
- ↑ "WA's EPA rejects Aviva coal-fired power station proposal". 12 February 2011. Retrieved 22 September 2018.
- ↑ "Archived copy". Archived from the original on 2011-04-23. Retrieved 2011-04-17.
- ↑ "Industry Report - Projects". Retrieved 22 September 2018.
- ↑ "Archived copy". Archived from the original on 2011-05-25. Retrieved 2011-04-17.
- ↑ "Burdekin Dam Hydro". Stanwell Corp. Retrieved 4 February 2012.
- ↑ "Kidston solar and pumped hydro plant clears another hurdle". Renew Economy. 2016-11-08. Retrieved 2017-03-27.
- ↑ "The Kidston Pumped Storage Hydro Project (250MW)". Genex Power Limited. Retrieved 2017-03-27.
- ↑ "Archived copy". Archived from the original on 2011-07-25. Retrieved 2011-07-26.
- ↑ "North Queensland Bio-Energy Corporation (NQBE)". www.nqbioenergy.com.au. Retrieved 2018-09-21.
- ↑ "Archived copy". Archived from the original on 2011-07-25. Retrieved 2011-07-26.
- ↑ "Archived copy". Archived from the original on 2011-07-25. Retrieved 2011-07-26.
- ↑ "Archived copy". Archived from the original on 2011-07-25. Retrieved 2011-07-26.
- ↑ "gullen range wind farm". Retrieved 4 February 2012.
- ↑ "Kennedy Wind Farm". windlab. Archived from the original on 18 July 2010. Retrieved 26 July 2011.
- ↑ "Mount Emerald Wind Farm". Ratch Australia. Archived from the original on 28 March 2012. Retrieved 4 February 2012.
- ↑ "Archer Point Wind Farm". Archived from the original on 26 March 2012. Retrieved 4 February 2012.
- ↑ "The Project". Clarke Creek Wind and Solar Farm project. Retrieved 2018-09-21.
- ↑ "Big wind farm project for King Island". 28 November 2012. Retrieved 28 November 2012.
- ↑ "Western Plains". Retrieved 22 September 2018.
- ↑ "Media Release" (PDF). Retrieved 21 September 2018.
- ↑ "Introduction to RATCH-Australia and Mount Emerald Wind Farm" (PDF). October 2016. Retrieved 21 September 2018.
- ↑ "Overview". Retrieved 21 September 2018.
- ↑ "The Project". Clarke Creek Wind and Solar Farm project. Retrieved 2018-09-21.
- ↑ "Bulli Creek Solar Farm". POWER PLANTS. Retrieved 2018-09-22.
- 1 2 3 4 5 6 "2018 Major Projects List" (PDF). Retrieved 22 September 2018.