Kennedy Energy Park

Kennedy Energy Park
Coordinates 21°S 145°E / 21°S 145°E / -21; 145Coordinates: 21°S 145°E / 21°S 145°E / -21; 145
Status Proposed
Construction began 2017
Owner(s) Windlab
Solar field
Type Flat-panel PV
Wind farm
Type Onshore
Site usage Farm Land
Power generation
Nameplate capacity 50 MW
Website
http://kennedyenergypark.com.au/

Kennedy Energy Park is a proposed wind, solar and storage hybrid power station to be located approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.

Stage one of the project is a “proof-of-concept” expected to commence construction early 2017, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build and expected to be operational early in 2018.[1]

Stage two is expected to be capable of producing 1200 MW of renewable energy, costing $2 Billion and hoped to commence construction before the end of the decade.[2]

See also

References

  1. "50MW Wind, Solar and Storage hybrid facility approved". Kennedy Energy Park. Retrieved 28 July 2016.
  2. "$120m outback Queensland hybrid renewable energy farm gets stage one approval". ABC. Retrieved 28 July 2016.