Lemonthyme Power Station

Parangana Dam
Location of the Parangana Dam in Tasmania
Country Australia
Location North-western Tasmania
Coordinates 41°37′48″S 146°13′12″E / 41.63000°S 146.22000°E / -41.63000; 146.22000Coordinates: 41°37′48″S 146°13′12″E / 41.63000°S 146.22000°E / -41.63000; 146.22000
Purpose Power
Status Operational
Opening date 1968 (1968)
Owner(s) Hydro Tasmania
Dam and spillways
Type of dam Embankment dam
Impounds Mersey River
Height 53 metres (174 ft)
Length 189 metres (620 ft)
Dam volume 382 thousand cubic metres (13.5×10^6 cu ft)
Spillways 1
Spillway type Uncontrolled
Spillway capacity 2,093 cubic metres per second (73,900 cu ft/s)
Reservoir
Creates Lake Parangana
Total capacity 14,820 megalitres (523×10^6 cu ft)
Catchment area 715 square kilometres (276 sq mi)
Surface area 11.4 hectares (28 acres)
Lemonthyme Power Station
Coordinates 41°36′14″S 146°08′19″E / 41.60389°S 146.13861°E / -41.60389; 146.13861
Operator(s) Hydro Tasmania
Commission date 1969 (1969)
Type Conventional
Hydraulic head 139 metres (456 ft)
Turbines 1 x 54 MW (72,000 hp)
Fuji Francis turbine
Installed capacity 54 megawatts (72,000 hp)
Annual generation 313 gigawatt-hours (1,130 TJ)
Website
hydro.com.au/energy/our-power-stations/mersey-forth
[1]

The Lemonthyme Power Station is a conventional hydroelectric power station located in north-western Tasmania, Australia. It is the third station in the MerseyForth run-of-river scheme that comprises seven conventional hydroelectric power stations and one mini hydro station.

Technical details

The Parangana Dam forms Lake Parangana by damming the Mersey River. Water from the lake is diverted west to Lemonthyme Power Station via a 6.5-kilometre (4.0 mi)-long tunnel, followed by a 1.6-kilometre (0.99 mi) single surface penstock.[2] The water then runs through the power station, and is discharged into the River Forth, then down to Lake Cethana.

The power station was commissioned in 1969 by the Hydro Electric Corporation (TAS). It has one Fuji Francis turbine, with a generating capacity of 54 megawatts (72,000 hp) of electricity. The station output, estimated to be 313 gigawatt-hours (1,130 TJ) annually, is fed to TasNetworks' transmission grid via two 3-phase 11 kV/220 kV Siemens generator transformers to the outdoor switchyard.[3]

Although much of the water from Lake Parangana travels the approximately 8 km to the Lemonthyme Power Station (which discharges into the River Forth), some water is allowed to continue down the Mersey River for environmental reasons, after running through the Parangana mini hydro station.

See also

References

  1. "Register of Large Dams in Australia" (Excel (requires download)). Dams information. Australian National Committee on Large Dams. 2010. Retrieved 23 June 2015.
  2. "Mersey - Forth". Energy. Hydro Tasmania. Retrieved 3 July 2015.
  3. "Lemonthyme Power Station: Technical fact sheet" (PDF). Mersey-Forth Catchment. Hydro Tasmania. Retrieved 3 July 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.