Line 10 (Chongqing Rail Transit)

Line 10
 10 
Sanyawan Station platform
Overview
Native name 重庆轨道交通10号线
Type Rapid transit
System Chongqing Rail Transit
Status Operational
Locale Chongqing, China
Termini Wangjiazhuang
Liyuchi
Stations 18
Line number 10
Operation
Opened 28 December 2017 (2017-12-28)
Operator(s) Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length 34 km (21 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1500 V DC Overhead line
Operating speed 120 km/h (75 mph) (Peak)
Route map

Lanhua Rd.
Lanhua Road Depot
Nanhu
 Loop 
Wanshou Rd.
Nanping
Bus interchange  3 
Nanbin Rd.
Nanjimen Bridge
across Yangtze River
Qixinggang
 1 
Auditorium
Zengjiayan
 2 
Zengjiayan Bridge
across Jialing River
Liyuchi
 9 
Hongtudi
 6 
Longtousi Park
S. Square of Chongqing
N. Railway Station
Chongqing North Railway Station  Loop   3 
N. Square of Chongqing
N. Railway Station
Chongqing North Railway Station Bus interchange  4 
Left arrow Line 4 to Tangjiatuo
Line 4 to Min'an Ave. Right arrow
Minxinjiayuan
Sanyawan
Left arrow Line 9 to Gaotanyan
Shangwan Rd.
 9 
Line 9 to Huashigou Right arrow
Huanshan Park
Changhe
Zhujiawan Depot
Terminal 3 of
Jiangbei Airport
Jiangbei Airport
Terminal 2 of
Jiangbei Airport
Jiangbei Airport Bus interchange  3 
Yubei Square
Lushan
Central Park E.
 9 
Central Park
Central Park W.
 5 
Left arrow Line 5 to Yuegang Ave.
Line 5 to TiaodengRight arrow
Yuelai
 6I 
Wangjiazhuang Depot
Wangjiazhuang
 6I 

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1]

Opening timeline

SegmentCommencementLengthStation(s)Name
Wangjiazhuang — Liyuchi 28 December 2017 27.72 km (17.22 mi) 18 Phase 1

Stations (north to south)

Phase I

Station
Station name Connections Distance
km
Location
English Chinese
10/27 Wangjiazhuang 王家庄  6I  Yubei
10/26 Yuelai 悦来  6I  2.04 2.04
10/25 Central Park West 中央公园西  5  2.71 4.75
10/24 Central Park 中央公园 1.09 5.84
10/23 Central Park East 中央公园东  9  0.82 6.66
10/22 Lushan 鹿山 1.64 8.30
10/21 Yubei Square 渝北广场 2.05 10.35
10/20 Terminal 2 of Jiangbei Airport 江北机场T2航站楼  3  Chongqing Jiangbei International Airport CKG 0.74 11.09
10/19 Terminal 3 of Jiangbei Airport 江北机场T3航站楼 Chongqing Jiangbei International Airport CKG 2.22 13.31
10/18 Changhe 长河 5.31 18.62
10/17 Huanshan Park 环山公园 1.85 20.47
10/16 Shangwanlu 上湾路  9  1.67 22.14
10/15 Sanyawan 三亚湾 2.74 24.88
10/14 Minxinjiayuan 民心佳园 2.08 26.96
10/13 N. Square of Chongqing N. Railway Station 重庆北站北广场  4   YW  Chongqing North railway station CUW 2.61 29.57
10/12 S. Square of Chongqing N. Railway Station 重庆北站南广场  3   Loop   YW  Chongqing North railway station CUW 0.60 30.17
10/11 Longtousi Park 龙头寺公园 0.87 31.04
10/10 Hongtudi 红土地  6  1.63 32.67 Jiangbei
10/09 Liyuchi 鲤鱼池  9  1.09 33.76

Phase II

  • Under construction
Station
Station name Connections Distance
km
Location
English Chinese
10/08 Zengjiayan 曾家岩  2  Yuzhong
10/07 Auditorium 大礼堂
10/06 Qixinggang 七星岗  1 
10/05 Nanbinlu 南滨路 Nan'an
10/04 Nanping 南坪  3 
10/03 Wanshoulu 万寿路
10/02 Nanhu 南湖  Loop 
10/01 Lanhualu 兰花路

References

  1. "重庆市主城形成多层次立体交通体系". May 16, 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.