Line 4 (Chongqing Rail Transit)

Line 4 of CRT is a rapid transit line in Chongqing, China, which is expected to be opened in December 2018. [1]

In June 2018, this line started debugging. [2]

For the construction progress of Line 4 please visit the website of Chongqing metro.[3]

Line 4
 4 
Overview
Native name 重庆轨道交通4号线
Type Rapid transit
System Chongqing Rail Transit
Status Under construction
Locale Chongqing, China
Termini Min'an Ave.
Tangjiatuo
Stations 9
Line number 4
Operation
Planned opening December 2018 (2018-12)
Operator(s) Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length 15.6 km (9.7 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1500 V DC Overhead line
Route map as of late 2018

Jiazhou Rd.
 3 
Min'an Ave.
 Loop 
N. Square of Chongqing
N. Railway Station
Chongqing North Railway Station  10 
Left arrow Line 10 to Liyuchi
Line 10 to Wangjiazhuang Right arrow
Left arrow Line 9 to Gaotanyan
Toutang
 9 
Baoshuigang
 9 
       
Baoshuigang
 9 
Line 9 to Huashigou Right arrow
Cuntan
Heishizi
Gangcheng
Taipingchong
Tangjiatuo Depot
Tangjiatuo
Tieshanping
Tongluo Mts.
Ganbazi
Yuzui
Yumiao Rd.
Gaoshikan
Fusheng
Wangjiacheng
Shengjibao
Longxing
Gaoshita
Pufu
Tongzilin
Shichuan S.
Shichuan
Shichuan Depot

Planned Stations

Phase I

Station
Station name Connections Distance
km
Location
English Chinese
4/01 Min'an Ave. 民安大道  Loop  Yubei
4/02 N. Square of Chongqing N. Railway Station 重庆北站北广场  10 
4/03 Toutang 头塘  9  Jiangbei
4/04 Baoshuigang 保税港  9 
4/05 Cuntan 寸滩
4/06 Heishizi 黑石子
4/07 Gangcheng 港城
4/08 Taipingchong 太平冲
4/09 Tangjiatuo 唐家沱

References

  1. "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
  2. "轨道4号线不载客试运行,有望年内投用". June 21, 2018.
  3. "Construction progress of Chongqing Metro Line 4". www.cqmetro.cn.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.