China Railways HXD2C

HXD2C six axle locomotive

The HXD2C is a 6 axle Co′Co′ freight locomotive which shares a similar exterior design with the HXD2B. The individually inverter controlled traction motors, body structure overall structural design also are the same as other members of the series;[1] with transformers from ABB.[2] The locomotive power is reduced to 7.2 MW (9,700 hp), suitable for trains of 5,000–6,000 tonnes (4,900–5,900 long tons; 5,500–6,600 short tons). The locomotive can be ballasted to give axle loads from 23 to 25 tonnes (22.6 to 24.6 long tons; 25.4 to 27.6 short tons).[1] The HXD2C locomotives are constructed by CNR Datong.[3]

220 units were ordered in 2010 at a cost of over 3 billion Yuan. In May 2010 the first locomotive was produced.[4][5] Locomotives are expected to be used on the Shijiazhuang–Taiyuan railway line, used for coal trains from Shanxi, with the first train running in December 2010.[3]

References

  1. 1 2 "HXD2C型大功率交流传动电力机车". www.chinacnr.com (in Chinese). Retrieved 6 February 2011.
  2. "Traction transformers for rolling stock :Landmark projects" (PDF), www05.abb.com, ABB Group, 2010
  3. 1 2 "人民网:中国北车和谐2C型机车发力百年石太线". www.ce.cn (in Chinese). China Northern Locomotive & Rolling Stock Industry Group Corporation. 24 December 2010.
  4. "中国北车和谐2C型电力机车中标铁道部采购项目", business.sohu.com (in Chinese), 12 July 2010
  5. "中国北车"和谐2C型"电力机车中标铁道部采购项目", news.hexun.com (in Chinese), 12 July 2010


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.