Bairabi–Sairang line

Bairabi–Sairang line
Overview
Status Under construction, Target 2020
Locale Mizoram, India
Termini Bairabi
Sairang
Stations 4
Website Indian Railway Website
Operation
Owner Indian Railways
Technical
Line length 84.25 km (52.35 mi)
Number of tracks Single Diesel-Line
Track gauge 5 ft 6 in (1,676 mm)
Electrification No

The Bairabi–Sairang line is a railway line from Bairabi railway station to Sairang. It is a part of Northeast Frontier Railway zone of Indian Railways.

Technical Features

The 84.25 km broad gauge railway line from Katakhal Junction to Bairabi railway stations, was completed on 21 March 2016,[1] at a cost of 326.51 cr INR. An estimated 28 hectares (69 acres) of land is required for the construction of 51 kilometres (32 mi) long Bairabi-Sairang rail line. The Bairabi-Sairang rail link will require construction of 130 bridges, 23 tunnels and four stations namely Hortoki, Kawnpui, Mualkhang and Sairang.[2][3] The cost of Construction from Bairabi to Sairang is estimated at 2384 Crores.[4]

Further Extension

In August 2015, Indian Railway completed a survey for a possible new route extension from Sairang to Hmawngbuchhuah on Mizoram’s southern tip on the border of Myanmar where at nearby Zochachhuah 'Kaladan Multi-Modal Transit Transport Project (KMMTTP) road enters Myanmar.[5][6]

Current Status

Indian Railway has already converted the current 84 km railline from Katakhal (Assam) to Bairabi 2 km inside Mizoram. Passenger services started on this line on 27 May 2016 by formal inauguration of Silchar - Bhairabi Passenger Train service (55667/55668).[7] Its further 51.38 km Bairabi Sairang line extension from Bairabi to Sairang (20 km north of Aizawl) in Mizoram is under construction, with target completion date of March 2019 as per status update in March 2016.[5][6] Due to Rainy season and Compensation issues, date of completion has been revised to March 2020. Nov 2017: Of 11.46 km tunnel to be dug for this 51.38 km Bairabi to Sairang rail line, 8.6 km tunneling work is completed.[8]. 22 of the 23 Bridges have been Completed as of November 2017.[9]

References

  1. "Modi completed Mizoram railway project". Retrieved 21 March 2016.
  2. PTI. "Broad gauge track project in Mizoram". CNN IBN Live. Retrieved 13 August 2012.
  3. "Broad gauge railway reaches Manipur". Retrieved 21 March 2016.
  4. "Bairabi-Sairang rêl kawng siam March 2020-ah zawh tum a ni". Vanglaini.org. Retrieved 10 March 2017.
  5. 1 2 Massive push to railway infrastructure under way in Northeast
  6. 1 2 Sanctioned in 2000, broad-gauge train reaches Mizoram after 16 years
  7. http://www.ndtv.com/india-news/pm-modi-inaugurates-passenger-trains-for-manipur-mizoram-1412847
  8. http://www.sentinelassam.com/story/news/9/railway-official-inspects-bairabi-sairang-railway-line-project/2017-11-23/1/326809#.WhaBIEqWZPY
  9. "Mizoram capital to be on railway map in 3 years". Times of India. Retrieved 28 July 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.