A4 motorway (Serbia)

Autoput A 4 shield}}

Autoput A 4
Аутопут А4
Autoput A4
Route information
Part of
Length 82.8 km (51.4 mi)
104.6 km (65 mi) planned
Major junctions
From Serbian motorway A1 shield A1
  Niš, Pirot, Dimitrovgrad
To I-8 at Gradina border crossing Bulgaria
Highway system

Motorways in Serbia

A3A5

The Motorway A4 (Serbian: Аутопут А4 / Autoput A4) is a motorway in Serbia under construction and when finished it will span for approximately 105 kilometers (65 mi). It begins at Trupale interchange near Niš, at the junction with A1 motorway and runs eastward, to the Gradina border crossing with Bulgaria, near Dimitrovgrad. The motorway is part of the Pan-European corridor X.

Route

Some 82 kilometers (51 mi) are in service, while the remaining sections are under construction.[1][2] It is planned to be connected with the Bulgarian Kalotina motorway that will run to Sofia.

Section Length Contractor Status
Trupale (Niš) – Prosek (Niška Banja) 18.6 km In service (since 2006)
Prosek (Niška Banja)Bancarevo 9.2 km Terna, Subterra Completed
Bancarevo – Crvena Reka 12.5 km Aktor Under constr. until Dec. 2018[3]
Crvena reka – Čiflik 12.7 km Aktor In service (since 2017)
Čiflik – Staničenje 12 km Rubau In service (since 2017)
Staničenje – Pirot (Sarlah tunnel) 9.3 km Aktor Under constr. until Nov. 2018[4]
Pirot (Sarlah tunnel) – Dimitrovgrad 21.7 km Trace, Aktor In service (since 2017)
Dimitrovgrad Bypass 8.6 km Aktor, Terna, Elef In service (since 2017)

Table's current progress status is as of April 2018.

References

  1. "Corridor 10 → Project East". koridorisrbije. Retrieved 24 March 2015.
  2. "ПРОЈЕКАТ ИСТОК". koridorisrbije.rs (in Serbian). Retrieved 18 March 2017.
  3. http://www.koridor10.rs/en/project-east
  4. http://www.koridor10.rs/en/project-east
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.