Tehran-Shomal Freeway

Freeway 3, or more commonly known as Tehran-Shomal Freeway (Persian: آزادراه تهران - شمال; literally: Tehran-North Freeway) will be a freeway in Northern Iran, connecting Tehran to cities of western Mazandaran. Currently, sections 1 & 4 are in service and section 2 is under construction. Construction process at section 3 is not started yet. The freeway runs parallel to Road 59, the old road connecting Karaj to Chalus.


Freeway 3
3 آزادراه
Tehran-Shomal Freeway
آزادراه تهران - شمال
Route information
Length121 km[1] (75 mi)
Major junctions
FromChalus, Mazandaran
Road 22 (Chalus-Nowshahr Bypass Expressway)
  Road 59
ToTehran, Tehran
Azadegan Expressway
Hemmat Expressway
Location
ProvincesTehran, Alborz, Mazandaran
Major citiesTehran, Tehran
Chalus, Mazandaran
Highway system
Highways in Iran
Freeways

Section 1

This section is from interchange with Azadegan Expressway and Hemmat Expressway in northwestern Tehran city (Municipality District 21) to Doab, Shahrestanak, Alborz Province. This section is opened for test service on February 12, 2020 and officially opened on February 25, 2020.[2] The section is 32 km long, with 28 tunnels having an overall length of 28.4 km on both sides.[3] The longest tunnel is Talun Tunnel which is 4870 m long.[4]

Sections 2 and 3

Section 2 is from Doab, Shahrestanak, Alborz to Pol-e Zanguleh, Kelardasht District, Mazandaran Province. The total length is 25 km.[5] The section has 20 tunnels with overall length of 24.2 km. The longest tunnel is Alborz Tunnel with a length of 6378 m.[6] Section 3 is from Pol-e Zanguleh, Kelardasht District, Mazandaran Province to Marzan Abad, Kelardasht District, Mazandaran Province with a length of 46 km. The section will have 92 tunnels with overall length of 33.5 km.[7] Construction process in section 2 is on progress and is to be opened till 2021[2], but progress in section 3 is in the selection of contractors and finance phase.[8]

Section 4

Section 4 is from Marzan Abad, Kelardasht District, Mazandaran Province to Chalus. This section is 20 km long. It has 4 tunnels with an overall length of 1400 m.[9] This section was opened on March 2013.[10] The AADT of the section is around 16,500.[11]

Toll rates

The toll rates are as follows:[12]

  • passenger vehicles: 50,000 Rial
  • Pickup trucks and minibuses: 100,000 Rial
  • Light trucks: 125,000 Rial
  • Bus and two-axis trucks: 150,000 Rial
  • 3-Axis trucks: 200,000 Rial
  • Semi trucks: 250,000 Rial

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.