Southwestern Railways

Southwestern Railways (PZZ), (Ukrainian: Південно-Західна залізниця) headquartered in Kiev, the capital of Ukraine, is a component part of the Ukrzaliznytsia company, its regional branch.

Southwestern Railways
Південно-Західна залізниця
Subdivisions of Ukrainian Railways
Overview
HeadquartersKiev
LocaleCentral Ukraine, North Ukraine
Dates of operation1870present
PredecessorSouthwestern Railways (Soviet Union)
Technical
Track gauge1,520 mm (4 ft 11 2732 in)
Length4,668 km (2,900 mi)
Other
Websitehttp://www.swrailway.gov.ua

It is named "Southwestern" because it is Southwest of Moscow, despite being in the Northern part of Ukraine.

Structure

As of 2008, SWR's rail system included 4,668 km (2,901 mi) of track, of which 93,3% were electrified.

The SWR consists of five sections (directions) named after the cities of their administration seat

The above mentioned directions administrative seats beside regular train stations have also locomotive and railcar depots. In addition such depots also are located in Shepetivka, Darnytsia (left-bank Kiev), Bakhmach, Vorozhba, Hrechany (neighborhood of Khemlnytskyi), and Snovsk (formerly Shchors).

There are 315 railway stations in the SWR system.

Geography

SWR's route map includes all the railroads in the Kiev, Zhytomyr, Chernihiv, Vinnytsia, Khmelnytskyi and Sumy oblasts (provinces of Ukraine).

Its territory borders Belarusian Railway to the north in Belarus, Moscow Railway to the north and north-east in Russia, Calea Ferată din Moldova to the south-west in Moldova, and three Ukrainian territorial branches of Ukrainian Railways, Lviv Railways to the west, Southern Railways to the east, and Odessa Railways to the south.

The Chernihiv–Ovruch railway that passes Chernobyl Power Plant and has restricted use also passes across the territory of neighboring Belarus.

History

The first railway to be built in the Ukrainian part of the Russian Empire was a track from Odessa to Balta. It was 213 km (132 mi) in length, and was built in 1865. This railroad connected the agricultural regions of the northern part of today's Odessa Oblast with Odessa, a seaport on the Black Sea coast.

The direct predecessor of Southwestern Railways was Kiev–Balta railways that in 1870 linked Kiev with Odessa Railways through [Balta. Just before that in 1868 in Kiev began construction of an important piece of infrastructure, the Struve Railroad Bridge, which in 1870 connected both banks of the city over Dnieper. In that year Kiev was also connected to the rest of Russian Empire's railroad system by a track from Kiev to Kursk with Kursk – Kiev branch. The history of the SWR began on 7 June 1870, when the construction of these railroads was launched and making it the third oldest railway system in Ukraine after Lviv and Odessa. The Kiev Passenger Railway Station, the main railway station of the SWR and the Ukrzaliznytsia was also built in that year.

Between 1871 and 1876 lines from Zhmerynka to Volochysk and from Berdychiv to Shepetivka were added, and between 1890 and 1897, the lines from Zhmerynka to Mohyliv-Podilskyi, Kozyatyn to Uman, Khrystynivka to Shpola and Berdychiv to Zhytomyr; 1897 was also the year when the Fastiv Railways were added to the SWR. Volyn Railways were brought into the SWR in 1902, the same year that the line from Kiev to Korosten was built. By the beginning of World War I the total length of the SWR system was 3,096 km (1,924 mi).

Directors

Among the most notable directors of Southwestern Railways was Sergei Witte who later became the Prime Minister of Russia.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.