Blyth Harbour Wind Farm

Blyth Harbour Wind Farm is a coastal wind farm located in East Bedlington along the East Pier of the Port of Blyth. Commissioned in January 1993 it consists of nine 0.3 MW WindMaster turbines giving a total capacity of 2.7 MW. It was developed by AMEC Wind and is owned by Hainsford Developments (Blyth Harbour) Limited.[1]

Blyth Harbour Wind Farm
CountryEngland, United Kingdom
LocationEast Bedlington at the Port of Blyth, Northumberland
Coordinates55.1222°N 1.49027°W / 55.1222; -1.49027
StatusOperational
Commission dateJanuary 1993
Owner(s)Hainsford Developments (Blyth Harbour) Limited
Wind farm
Site elevation5 ft
Power generation
Units operational9 × 0.3 MW
Make and modelWindMaster
Nameplate capacity2.7 MW
External links
CommonsRelated media on Commons

Repowering

In January 2008 consent was granted to replace the existing nine turbines with seven new ones. Six of these would generate 2.5 MW each, and a seventh larger one would produce 7.58 MW (if it is an Enercon E-126)and be the largest land-based turbine in Europe at 163 m (535 ft) tall.[2]

As of September 2012, the first new turbine became operational, producing up to 3.4 MW of power (more than the original nine turbines combined). The turbine is a REpower 3.4M104, with a 76 m hub height.

References

  1. "Archived copy". Archived from the original on 2012-11-02. Retrieved 2015-12-11.CS1 maint: archived copy as title (link)
  2. "Archived copy". Archived from the original on 2012-03-07. Retrieved 2009-11-05.CS1 maint: archived copy as title (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.