Masinag LRT station

 Masinag 
Manila Light Rail Transit System
Location Antipolo, Rizal
Owned by Department of Transportation
Light Rail Transit Authority
Line(s) LRT-2
Construction
Structure type Overpass
Other information
Status Under Construction
Services
Preceding station   Manila LRT   Following station
TerminusLRT-2 Extension
toward Pier 4

Masinag station is an under construction station on the Manila Light Rail Transit System Line 2 (LRT-2) in the Philippines. It is part of the LRT Line 2 East Extension. The LRT-2 east extension plan calls for an elevated 2-station, 4.14-kilometer extension eastward from Santolan, which means that this station would be above ground. The station will be the first LRT-2 station outside Metro Manila, being located in Antipolo in Rizal.[1]

The station would be the second and last for trains headed east from Santolan and the twelfth for trains headed from Recto. It will be located at the Masinag Junction on the western side of the intersection of Marcos Highway with Sumulong Highway.

Construction of the LRT-2 east extension began in September 2015 and is expected to be completed by April 2019, as Transportation Secretary Arthur Tugade said in the groundbreaking of the design and construction of the two additional stations last May 31, 2017, which is package 2 of the 3 packages of the east extension project. The construction of the station is set to be completed in August 2018.

[2]

As of this writing, Jan. 23, 2017, the entire extension from Santolan all the way to Masinag is finished. All that is missing are the two new stations; Emerald (Sta. Lucia) and SM Masinag stations and the electric posts that will hold the main electric power source of the trains. Most of the closed inner lines under the elevated railway were now opened to the motorist thus improving traffic flow condition. The rain drain pipes are now also installed.

Nearby landmarks

When completed, the station will link directly to SM City Masinag.

Station layout

Due to the location's elevation, the height between the ground and concourse levels is equivalent to three stories.

L3
Platforms
Side platform, doors will open on the right
Platform A LRT Line 2 towards (future service) Switch track
Platform B LRT Line 2 towards (future service) Recto
Side platform, doors will open on the right
L2 Concourse Faregates, Ticket Booths, Station Control, Shops
GL Street Level SM City Masinag
Sumulong Highway

See also

References

  1. Project Update: The LRT Line 2 Extension (East/West) Project Archived 2012-03-10 at the Wayback Machine., Light Rail Transit Authority, retrieved March 23, 2012
  2. "Construction of LRT-2 Masinag extension begins". Philippine Star. Retrieved 8 July 2015.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.