M8 (Istanbul Metro)

M8 Bostancı–Dudullu
Overview
Type Rapid transit
System Istanbul Metro
Status Under construction
Locale Istanbul, Turkey
Termini Bostancı
Depo
Stations 13
Services 1
Line number M8
Operation
Opened 2019 (2019)
Owner Istanbul Metropolitan Municipality
Operator(s) Metro Istanbul A.Ş.
Depot(s) Dudullu
Technical
Line length 14.2[1] km (8.8 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 1,500 V DC Overhead line

Line M8, officially referred to as the M8 Bostancı-Dudullu line, is a rapid transit line of the Istanbul Metro system, currently under construction in the Asian part of Istanbul, Turkey. The line will be 14.2-kilometre (8.8 mi) long with 13 stations, and is expected to go into service in 2019.[2]

Stations

References

  1. "İBB: İki yeni metro hattı geliyor". Haberturk (in Turkish). August 12, 2015. Retrieved 2016-03-23.
  2. "Metro çalışması sürüyor, trafik büyüyor" (in Turkish). Gazete Kadiköy. 2016-09-29. Retrieved 2017-01-12.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.