Line 1 (Chongqing Rail Transit)

Line 1
 1 
Overview
Type Rapid transit
System Chongqing Rail Transit
Termini Chaotianmen
Jiandingpo
Stations 24
Daily ridership 690,000 (2016 Peak)[1]
Operation
Opened 28 July 2011
Operator(s) Chongqing Rail Transit Corp., Ltd
Technical
Line length 38.9 km (24.2 mi)
Operating speed 100 km/h (62 mph) (peak)
Route map

Chaotianmen
ferry/water interchange
Xiaoshizi
 6 
Jiaochangkou
 2 
Qixinggang
 10 
Lianglukou
Chongqing Railway Station Bus interchange  3 
Eling
Daping
 2 
Shiyou Rd.
Xietaizi
 5 
Left arrow Line 5 to Yuegang Ave.
Shiqiaopu
 5 
Gaomiaocun
Line 5 to Tiaodeng Right arrow
Majiayan Depot
Majiayan
Xiaolongkan
 9 
Shapingba
Shapingba Railway Station Bus interchange  Loop   9 
Yanggongqiao
Lieshimu
Ciqikou
Shijingpo
Parking
Shuangbei
Parking
Zhongliang Mts.
Laijiaqiao Depot
Laijiaqiao
Weidianyuan
Chenjiaqiao
Bus interchange Parking
Daxuecheng
Parking
Jiandingpo
Jinyun Mts.
Bishan
 S2 

Line 1 of CRT runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.[2]

Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.[3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.

Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.

Line 1 has transfer interchange stations with Line 6 at Xiaoshizi and Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing railway station in the Caiyuanba section of central Yuzhong.

Opening timeline

SegmentCommencementLengthStation(s)Name
Jiaochangkou — Shapingba 28 July 2011 14.2 km (8.82 mi) 11 Phase 1 (initial section)
Xiaoshizi — Jiaochangkou 27 September 2011 1.4 km (0.87 mi) 1 Phase 1 (final section)
Gaomiaocun 17 November 2011 Infill station 1
Shapingba — Daxuecheng 20 December 2012 19.7 km (12.24 mi) 7 Phase 2 (initial section)
Weidianyuan 28 March 2013 Infill station 1
Majiayan 25 September 2013 Infill station 1
Shijingpo 28 September 2014 Infill station 1
Daxuecheng — Jiandingpo 30 December 2014 1.9 km (1.18 mi) 1 Phase 2 (final section)

Service routes

Current stations

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
1/01 Chaotianmen 朝天门 Yuzhong
1/02 Xiaoshizi 小什字  6  0.00 0.00
1/03 Jiaochangkou 较场口  2  1.40 1.40
1/04 Qixinggang 七星岗  10  0.90 2.30
1/05 Lianglukou 两路口  3  Chongqing railway station CQW 1.50 3.80
1/06 Eling 鹅岭 1.55 5.35
1/07 Daping 大坪  2  1.90 7.25
1/08 Shiyoulu 石油路 1.05 8.30
1/09 Xietaizi 歇台子  5  1.05 9.35 Jiulongpo
1/10 Shiqiaopu 石桥铺  5  1.30 10.65
1/11 Gaomiaocun 高庙村 1.65 12.30 Shapingba
1/12 Majiayan 马家岩 1.10 13.40
1/13 Xiaolongkan 小龙坎  9  0.95 14.35
1/14 Shapingba 沙坪坝  9   Loop  Shapingba railway station CYW 0.85 15.20
1/15 Yanggongqiao 杨公桥 1.10 16.30
1/16 Lieshimu 烈士墓 0.85 17.15
1/17 Ciqikou 磁器口 1.05 18.20
1/18 Shijingpo 石井坡 1.40 19.60
1/19 Shuangbei 双碑 1.90 21.50
1/20 Laijiaqiao 赖家桥 7.00 28.50
1/21 Weidianyuan 微电园 1.80 30.30
1/22 Chenjiaqiao 陈家桥 3.35 33.65
1/23 Daxuecheng 大学城 1.90 35.55
1/24 Jiandingpo 尖顶坡 1.55 37.10
1/25 Bishan 璧山  S2  Bishan

References

  1. "重庆轨道客运量9月30日创新高 达到257.4万乘次".
  2. Chongqing Metro Line 1 into trial operation Archived 2011-09-28 at the Wayback Machine.
  3. "Chongqing's Metro Line 1 Now Open". Archived from the original on 2011-08-27. Retrieved 2012-08-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.