Furness line

Furness line
Overview
Type Heavy rail, Commuter rail
System National Rail
Status Operational
Locale Cumbria
Lancashire
Furness
Barrow-in-Furness
North West England
Termini Carnforth
Barrow in Furness
Stations 10
Operation
Opened 1846-1857 (in stages)
Owner Network Rail
Operator(s) Northern
Rolling stock Class 68
British Rail Class 142
British Rail Class 144
Class 153 ‘Super Sprinter’
Class 156 ‘Super Sprinter’
Technical
Line length 28 mi 45 ch (45.97 km)
Number of tracks 2
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Electrification 25 kV 50 Hz AC OHLE (Carnforth)
Operating speed 60 mph (97 km/h) maximum
Route map
Cumbrian Coast line
Barrow-in-Furness
Furness Railway
to Barrow Docks
Power Station
Salthouse Halt
Roose
Furness Abbey
Dalton
Lindal
Ulverston
to Bardsea
to Lakeside
River Leven
Cark and Cartmel
Kents Bank
Grange-over-Sands
River Kent
Arnside
branch to WCML
at Hincaster
Silverdale
West Coast Main Line
Leeds–Morecambe line
Carnforth
Morecambe branch line
Lancaster
West Coast Main Line

The Furness line is a British railway between Barrow-in-Furness and Lancaster, joining the West Coast Main Line at Carnforth. A predominantly passenger line, it serves various towns along the Furness coast, including Barrow-in-Furness, Ulverston and Grange over Sands. It runs through Cumbria and Lancashire.

Regional services on the line start from Manchester Airport and Preston, while local services start from Preston and Lancaster. The majority of services along the line terminate at Barrow-in-Furness, however some services continue along the Cumbrian Coast Line to Millom, Sellafield and Carlisle. The line was constructed by the Ulverston and Lancaster Railway and the Furness Railway between 1846 and 1857, and today has services operated by Northern.

Along with the Cumbrian Coast Line, the route is considered one of the most scenic in England. The line was designated a community rail partnership by the Department for Transport in 2012.[1] The line is electrified between Lancaster and Carnforth where the route leave the West Coast Main Line, which previously allowing for sleeper services between Barrow and London Euston.

History

The line was opened in stages between 1846 and 1857 to link the mineral industries in the area. The area was very isolated before the railway opened, with the only road crossing to reach the area over Morecambe Bay. The Furness Railway was first proposed in November 1843, linking the slate quarries of Kirkby in Furness and iron ore in the Lindal in Furness area to a deep water berth at Roa Island. It was originally intended to be used solely as a mineral railway, however provisions were made for a branch to Barrow and a link to Ulverston, the largest local town at the time.[2]

The line slowly expanded to link up with what is today the Cumbrian Coast Line, in addition to an extension to Ulverston in 1854. In 1857, the Ulverston and Lancaster Railway completed its route, linking to the Carlisle and Lancaster Railway. The line eventually began to expand, purchasing the Whitehaven and Furness Junction Railway. The railway company eventually refused to purchase the Whitehaven Junction railway, leading to a situation where the Furness Railway was heavily influenced by the London and North Western Railway.

The line continued to develop in the 1880s, especially in the Barrow area. A through station was constructed, removing the need to reverse as was the case at the Strand terminus. A passenger station had been opened at Ramsden Dock a year before to connect with the new Isle of Man and later Belfast steamer services.[2]

Early twentieth century

In the early 20th century, passenger numbers had continued to decline.[3] As a result, an effort was made to modernise the line as a tourist railway, linking the country to the Lake District. This began a new era for the area, bringing thousands of tourists to Coniston and Windermere.

Under the Big Four, the line was brought under the control of the London, Midland & Scottish Railway on 31 December 1922. The Roa Island branch was closed in 1936, however the rest of the network remained open until the formation of British Railways. The Coniston branch closed in 1962 and the Lakeside branch in 1965, with part of the route being preserved as the Lakeside and Haverthwaite Railway. Sleeper services to London Euston ceased in 1990.

Modern era

Following the privatisation of British Rail in the 1990s, services were initially transferred to First North Western. First TransPennine Express took over the operation of regional express services to Manchester and Preston in 2004, while local services were transferred to Northern Rail.

Class 37 locomotives hauling Mark 2 carriages were used on the line between May 2015[4] and May 2018, operating through services along the Cumbrian Coast line due to a shortage in rolling stock following the move of Class 170 'Turbostar' units to Chiltern Railways[5]. The change was controversial locally as the trains were old, and unreliable. Class 68 locomotives were introduced onto services temporarily in January 2018[6], until through running of loco-hauled stock ended in May 2018. Today, all services on the line are operated by Northern who operate a variety of regional express and local services to Lancaster, Preston and Manchester using a variety of Sprinter diesel multiple units.

Services

Following a recasting of rail franchises in the North of England by the Department for Transport, all services on the line are now operated by Northern.[7] Regional services to Manchester and Preston were previously operated by First TransPennine Express until 31 March 2016, and TransPennine Express Class 185s used by the previous franchise were used on some services to Manchester Airport by Northern.

The line received a modernised timetable in May 2018, with additional services to Manchester Airport to be introduced in December 2018. The service is unusual amongst those on the West Coast Main Line as it does not yet have a clockface timetable. This means that there are several gaps in the service, varying between 30 and 90 minutes. The new timetable was criticised by local schools due to the introduction of earlier services between Barrow and Ulverston.[8]

Future

New Class 195 'Civity' units will operate services from 2019.

Following a recasting of rail franchises in the North of England by the Department for Transport, all services on the line were transferred to Northern in April 2015. Services previously operated by First TransPennine Express will be operated by new 'Northern Connect' services from December 2019, enhancing the previous service with at least eight trains per day to Manchester Airport. The enhanced service will use new, air-conditioned Class 195 'Civity' units[9] and offer free onboard WiFi and faster journey times.

In addition to the introduction of Northern Connect services, an enhanced local service will also be introduced with 21tpd in both directions, compared to between 18-20tpd today. Additional services are to be extended from Lancaster to Preston to allow better links to Manchester, Liverpool and other West Coast Main Line services. On Sundays, a enhanced service is planned with up to 5-8 extra trains per day in each direction to both Lancaster and Manchester Airport.[7]

It is also intended to refurbish all stations served by Northern Connect services. These refreshed stations will provide higher standards with free WiFi and modern facilities.

References

  1. "Furness community rail partnership". UK Government. Retrieved 9 September 2017.
  2. 1 2 "Furness Railway Company". The Furness Railway Trust.
  3. "Railway History". Lakeside Railway. Retrieved 9 September 2017.
  4. "New loco-hauled services for Cumbrian Coast". www.railtechnologymagazine.com. Retrieved 2018-05-21.
  5. "FTPE to retain four Class 170s – but five will still go to Chiltern". www.railtechnologymagazine.com. Retrieved 2018-05-21.
  6. "Northern trains promises more reliable service for Furness with new locomotive". Retrieved 2018-05-21.
  7. 1 2 Transport, Department for. "Northern franchise improvements". maps.dft.gov.uk. Retrieved 2017-09-10.
  8. Fenton, Amy. "Hundreds of Barrow children face longer school days amid train timetable changes". Retrieved 2018-05-21.
  9. Haigh, Phillip (2017-03-21). "Northern's new DMUs to begin testing from Spring 2018". Rail (magazine). Retrieved 2017-09-10.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.