East Coast Integrated Depot
Location | |
---|---|
Location | Upper Changi Road East |
Characteristics | |
Operator(s) |
SMRT Trains (SMRT Corporation) (EWL & TEL) SBS Transit (DTL) |
Type |
Elevated (EWL) At-grade (TEL) Underground (DTL) |
Roads | Upper Changi Road East |
Rolling stock |
C151 C651 C751B C151A C151B C151C CR151 C951/C951A CT251 |
Routes served |
EWL East West Line (2024) DTL Downtown Line (2024) TEL Thomson-East Coast Line (2024) |
History | |
Opened | 2024 (Under Planning & Construction) |
East Coast Integrated Depot (Simplified Chinese: 东海岸车厂; Traditional Chinese: 東海岸車廠) is a future integrated Bus and MRT Depot serving the Mass Rapid Transit (MRT), East West Line, Downtown Line and Thomson-East Coast Line as well as Buses. Located in Changi, near Upper Changi Road East.
The depot, with an expected completion date of 2024,[1] will be located beside the current site of Changi Depot, which will be demolished. It will be the first MRT depot in Singapore to serve 3 MRT lines and also the second to be integrated with a bus depot in Singapore after the Tuas West Depot on the East West Line. With this design, it is estimated that there will be a saving of 44 hectares of land, equivalent to approximately 60 football fields, considering that Singapore is a land-scarce country. The depot will be able to house approximately 200 trains of varying sizes and lengths and 550 buses within the site. [2]
Description
The East Coast Integrated Depot consists of a multi-level train depot and a multi-level bus depot.
Train depot
The train depot will have three levels containing three separate depots for three different MRT lines. The underground portion will house a 66-track depot for the Downtown Line, and will be brought into use following the opening of Stage 3 of the line. The at-grade portion will house a 62-track depot for the future Thomson-East Coast Line, to be used following the completion of Stage 5 of the line. Finally, the elevated portion will house a 72-track depot for the East West Line, which will replace the existing Changi Depot. All three depots will operate independently of each other, a first for Singapore, and will be designed to be able to handle trains of different lengths, of 3, 4 and 6 respectively of the lines they operate on. [3]
The facility will be located between Expo station and Tanah Merah station on the East West Line, between Xilin station and Sungei Bedok station on the Downtown Line, and off Sungei Bedok station on the Thomson-East Coast Line.
Bus Depot
The bus depot is a separate three-storey structure situated next to the train depot on the same site. Similar to Soon Lee Bus Park and Woodlands Bus Depot, it will contain workshops on the ground level, while the upper two levels will contain parking spaces.
References
- ↑ "LTA AWARDS CONTRACT TO BUILD WORLD'S FIRST FOUR-IN-ONE DEPOT". Land Transport Authority. Retrieved 7 February 2017.
- ↑ "THOMSON-EAST COAST LINE (EAST COAST STRETCH) BREAKS GROUND TODAY". Land Transport Authority. Retrieved 7 February 2017.
- ↑ "East Coast Integrated Depot". Land Transport Guru. Retrieved 7 February 2017.