Alton line

Alton line
Overview
Type Branch line, heavy rail
System National Rail
Status Operational
Locale South East England
Stations 6
Services rail connection from South Western Main Line to Mid Hants Watercress Railway
Operation
Opened 1852
Owner Network Rail
Operator(s) South Western Railway
Depot(s) Farnham Traincare Depot
Rolling stock Class 450
Class 444
Technical
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Operating speed 60-75mph (non-commuter services).

Alton line
Brookwood
London Necropolis Rly
South StationNorth Station
Pirbright Junction
Foxhills Tunnel
Ascot–Ash Vale line
Ash Vale
North Camp
Ash
Ash Green Halt
Aldershot
Tongham
Farnham Junction
line closed 1954
Farnham
Farnham depot
Bentley
Alton
Watercress Line
to Alresford
Heritage railway

The Alton line is a railway line in Hampshire and Surrey, England, operated by South Western Railway as a relatively long branch of the South Western Main Line.

The branch leaves the main line at Pirbright Junction to the west of Brookwood station, Surrey, then turns to the southwest. The route crosses and recrosses the Surrey / Hampshire border, and serves the towns of Aldershot and Farnham before reaching its present-day terminus at Alton in East Hampshire. The line originally continued west to Winchester; the section between Alton and New Alresford is preserved as the heritage Watercress line.

The Alton line was electrified (750 V DC third rail) during the late interwar years by Southern Railway. Aside from regular electric trains, freight trains operated by EWS and steam trains connected to the Mid Hants Watercress Railway (by way of rolling stock supply or special excursion) operate on the line.

History

The first railway line to Farnham opened in 1849 and was a branch from Guildford via Tongham. The line from Farnham to Alton opened on 28 July 1852. On 2 October 1865 the Alton, Aldershot & Winchester Railway extended the line from Alton to Winchester, with Alton station moving to a new site. On 2 May 1870 the present-day line from Brookwood to Farnham opened.[n 1] Alton became a junction station on 1 June 1901 when the Basingstoke and Alton Light Railway opened, temporarily closed 1917–1924 as the track was taken up for use in France during the First World War, but reopened after local pressure. Use was light and the line closed in 1933. On 1 June 1903 the Meon Valley Railway opened from Alton to Fareham on the south coast. This line closed to passengers in 1955.[n 2]

The section between Alton and Winchester was closed in 1973. The 10 mile stretch from Alton to Alresford was reopened in stages from 1977 to 1985 as the Watercress heritage railway. The route between Alresford and Winchester is unlikely to be reopened, as houses and the M3 motorway have since been built across the route.

Temporary closures

August 2006

The line closed briefly in August 2006 between Brookwood and Ash Vale due to a landslip at Foxhills Tunnel, causing most commuter journeys to be diverted via Guildford.[1]

April 2016

Heavy rainfall destabilised the embankment near Wrecclesham causing closure of the line between 13 April 2016 and 3 May 2016.[2] Network Rail undertook further work to stabilise fully the earthworks.[3]

Passenger services

The current terminus at Alton, taken in 1982

There are two trains per hour in each direction between Waterloo and Alton (Mondays to Saturdays). On Sundays, the service is hourly until the early afternoon when half-hourly. Peak time trains take between 67 and 71 minutes for the whole journey; off-peak trains take between 75 and 78 minutes for the journey and Sunday services take 79 to 85 minutes.

Passenger trains that serve this line during off-peak hours also stop at the following stations (from north to south):

During peak hours trains typically do not stop at Clapham Junction; some peak trains also omit calls at Surbiton, West Byfleet or Brookwood. On Sundays, the service also calls at Wimbledon.[n 3]

Historical timetables

From 1937 to 1967, Alton trains ran fast from Waterloo to Surbiton and then ran all stations to Alton. They formed the front (country) end of an 8-car train that split at Woking with the rear 4 cars running to Portsmouth. The trains ran throughout the day and left Waterloo at 27 and 57 minutes past the hour and took exactly 80 minutes to reach Alton.[4] Additionally, there were trains in the rush hours that ran fast to Woking and then all stations – at 16:17, 18:14, and 18:17 (also stopping at Surbiton) to Farnham, and at 16:47, 17:17, 17:47 to Alton taking between 72 and 76 minutes. Trains from Waterloo to Alton from 05:25 to 08:25 left two minutes earlier than the standard departures and called at Wimbledon. All trains took the fast line from Waterloo to Surbiton. The last train in the evening was the 22:57 to Farnham, which ran to Alton on Wednesday and Saturday nights only, arriving at 00:17. On Sundays there was a 23:27 that only ran to Farnham. On weekdays the 17:27 and 19:27 had connections at Bentley to Bordon with a five-minute connection at Bentley and a journey time to Bordon of 15 minutes. The diminutive army town of Bordon had a very regular service on Sunday nights from Bentley.[4]

On the upline the pattern was similar, with several departures from Farnham to Waterloo starting at 06:05 and then from Alton at 06:54, then every 30 minutes till 22:54 with three extra rush hour services in the morning. In those days the line from Farnham to Alton was double track.

In the 1980s the pattern was somewhat different: the off-peak trains ran half-hourly and stopped at Surbiton, Woking then all stations, being detached from the Bournemouth (hourly) or Basingstoke (hourly) stopping services. Around 1985 Alton lost its half-hourly service, with half the trains terminating at Farnham. Peak services were approximately every 20 minutes until 1985, half-hourly thereafter, generally going fast Waterloo to Woking, occasionally stopping at West Byfleet or Surbiton

In 1989 the service changed again with three trains an hour as far as Farnham: a fast train (Clapham Junction, Woking and all stations to Alton), a semi-fast (Surbiton, certain stations to Woking, then all to Farnham) and a slow (Clapham Junction, Wimbledon, Surbiton and all stations to Farnham).

Freight services

A daily service runs to Holybourne Oil Terminal between Alton and Bentley. As a result, the 10:23 service from Waterloo stops short at Farnham and does not continue to Alton; there is no 12:14 return service from Alton to Farnham, this train beginning its journey from Farnham instead at 12:28. This is because the line between Alton and Farnham is single, with a passing place at Bentley, and worked on the track circuit block system.[5]

Farnham Traincare Depot

Farnham Traincare Depot (51°12′18″N 0°48′37″W / 51.2051°N 0.8102°W / 51.2051; -0.8102), in Weydon Lane, was opened by the Southern Railway at the time of the electrification of the Portsmouth and Alton lines in 1937. It was refurbished for the introduction of modern units when slam-door trains were replaced circa 2005. At the same time, disused quarry and ballast dump sidings behind the carriage shed were removed and a number of outdoor sidings were laid for overnight storage and servicing of units.

It is between Farnham railway station, Surrey and Bentley (Hampshire) railway station close to the county border.

South Western Railway use the depot under the five-to-ten year government franchise operated by the subsidiary. The depot houses mainly Class 450 trains, but also Class 458 and occasionally Class 444 and 456 trains as well.

Notes and references

References
  1. "South West Trains – Landslide update: Alton line services". 17 August 2006. Archived from the original on 8 April 2009. Retrieved 13 May 2009.
  2. "Landslip rail line reopens early". Alton Herald. 2016-05-07. Retrieved 2016-05-13.
  3. "Farnham and Alton railway line to reopen after landslip". BBC. 2016-04-29. Retrieved 2016-05-02.
  4. 1 2 "British Railways Southern Region Timetable". September 1950. Archived from the original on 26 April 2012. Retrieved 17 April 2012.
  5. "Hampshire County Council – Renewal of the South Western Rail Franchise – Report of the Director of Environment". 18 January 2006. Retrieved 13 May 2009.
Notes
  1. At Pirbright Junction, between Brookwood near Woking in Surrey and Farnborough in Hampshire.
  2. on 7 February
  3. Timetables show the line as "suburban". It is in practice a regional line and for the purposes of South West Trains Passenger Charter discounts and Void Day refunds for season tickets it is a Mainline route. All journeys from Alton, Bentley and Farnham are Mainline journeys. Journeys from Aldershot and Ash Vale to London Terminals (i.e. all London stations) and Zone R1256 Zones (a journey to London with Underground included) are Mainline, the remainder suburban.

Further reading

  • Butt, R.V.J. (1995). The Directory of Railway Stations. Sparkford: Patrick Stephens Ltd. ISBN 1-85260-508-1.

Coordinates: 51°9′56″N 0°57′58.48″W / 51.16556°N 0.9662444°W / 51.16556; -0.9662444

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.