Vistula Spit canal

The Vistula Spit canal (official name Nowy Świat ship canal, Polish: Kanał żeglugowy Nowy Świat[1]) is a planned canal across the Polish section of the Vistula Spit that will create a second connection between the Vistula Lagoon and Gdańsk Bay. It will allow ships to enter the Vistula Lagoon and the port of Elbląg without having to rely on the Russian Strait of Baltiysk, saving a 100 km journey. The works started in February 2019. It is planned to be 1305 m in length and will allow ships of draft up to 4 m, length up to 100 m, and beam up to 20 m.[2] It is planned to be completed in 2022. [3]

Proposed waterway Elbląg - Gdańsk Bay
Planned location of the Vistula Spit canal

The planned canal location is between the villages of Skowronki and Przebrno.

Works

The major works include:[4]

  • Construction of the breakwater harbor on the Gdańsk Bay side.
  • Construction of the shipping channel together with all its infrastructure
  • New roads and bridges
  • Construction of an artificial island in the Vistula Lagoon.

The works started in February 2020 with tree cutting, which was finished during February 15 - 20, 2020. Logging and branch removal was to be finished by the end of March.[5]

The beginning of the construction of the artificial island was announced on May 30, 2020. It area is planned to be about 180 hectares and it is expected to be a bird habitat.[3]

References

YouTube videos of the progress of the construction: