Twenty-eight by '28

The Twenty-eight by '28 initiative is an effort set forth by Mayor Eric Garcetti that the City of Los Angeles complete 28 transportation infrastructure projects before the start of the 2028 Summer Olympics on July 21, 2028 (2028-07-21) and the 2028 Summer Paralympics the following month.

Most projects are funded through Measure R and Measure M and will receive accelerated priority, though several more were proposed by this plan.[1] In December 2018, the Los Angeles County Metropolitan Transportation Authority claimed it would need $26.2 billion to complete the list of projects.[2]

List

    Under construction
    Operational
    No. Project Expected
    completion
    Originally
    planned
    1 Crenshaw/LAX Line 2021[3] 2019
    2 Microtransit[lower-alpha 1] 2019
    3 Regional Connector 2022 2021
    4 New Metro Rapid Bus Rapid Transit Corridors (Phase 1) 2022
    5 Airport Metro Connector station 2023
    6 Interstate 5 North County Capacity Enhancements 2023
    7 North San Fernando Valley Transit Corridor
    8 Purple Line Extension Section 1 2023
    9 North Hollywood-Pasadena Transit Line 2024 2022
    10 Los Angeles River Waterway & System Bike Path 2025
    11 Los Angeles River bicycle path and Mobility Hub – San Fernando Valley
    12 Orange Line Travel Time and Safety Improvements[4] 2025
    13 Purple Line Extension Section 2
    14 Gold Line Foothill Extension 2026 2025
    15 Purple Line Extension Section 3 2026
    16 Sepulveda Pass ExpressLanes
    17 East San Fernando Valley Transit Corridor[5] 2027
    18 Interstate 105 ExpressLanes 2027 2029
    19 Interstate 710 South Corridor Early Action 2032
    20 South Bay Green Line Extension 2030
    21 Blue Line Signal and Washington/Flower Junction Improvements[lower-alpha 1] 2028
    22 Interstate 10 ExpressLanes/Interstate 605 to the San Bernardino Line[lower-alpha 1] 2028 2030
    23 State Route 57/60 Interchange Improvements 2031
    24 Vermont Transit Corridor 2028
    25 Sepulveda Pass Transit Corridor[6] 2028 2033
    26 Gold Line Eastside Extension to Whittier 2035
    27 West Santa Ana Branch Transit Corridor 2041
    28 Interstate 405 South Bay Curve Improvements 2047

    Notes

    1. The project is not related to Measure R or Measure M.

    References

    General
    • "Draft Twenty-Eight by '28 Project List". Metro. Retrieved 2 July 2018.
    Inline
    1. Sharp, Steven (27 November 2018). "Here are the 28 Projects that Metro Could Complete Before the 2028 Olympics". Urbanize. Retrieved 2 July 2018.
    2. Shelly, Susan (11 December 2018). "Metro's latest plan to get more of your money". LA Daily News. Retrieved 12 December 2018.
    3. Nelson, Laura J. (10 April 2020). "Construction problems delay Metro's $2-billion Crenshaw Line opening until 2021". Los Angeles Times. Retrieved 14 April 2020.
    4. Olga, Grigoryants (17 July 2018). "LA's Metro says improvements are in the works for the Orange Line, with light rail in mind". Los Angeles Daily News. Retrieved 17 July 2018.
    5. "Mayor Garcetti checks out future train route through the Valley — by bus". Los Angeles Daily News. 29 June 2018. Retrieved 2 July 2018.
    6. "LA Metro unveils rail concept for Sepulveda Pass project". Progressive Railroading. 12 June 2018. Retrieved 2 July 2018.