Trans Adriatic Pipeline

Trans Adriatic Pipeline (TAP; Albanian: Gazsjellësi Trans-Adriatik, Azerbaijani: Trans Adriatik Boru Xətti Greek: Διαδριατικός Αγωγός Φυσικού Αερίου, Italian: Gasdotto Trans-Adriatico) is a pipeline project to transport natural gas, starting from Greece via Albania and the Adriatic Sea to Italy and further to Western Europe.

Trans Adriatic Pipeline
Map of Trans Adriatic Pipeline
Location
CountryGreece
Albania
Italy
General directionEast-West
FromKipoi, Evros
Passes throughFier
ToMelendugno[1]
General information
TypeNatural gas
PartnersBP (20%)
SOCAR (20%)
Snam (20%)
Fluxys (19%)
Enagás (16%)
Axpo (5%)[2]
OperatorTrans Adriatic Pipeline AG
Construction started2016[3]
Expected2020[3]
Technical information
Length878[1] km (546 mi)
Maximum discharge10–20 billion cubic metres per annum[4]
Diameter48[5] in (1,219 mm)
Websitehttps://www.tap-ag.com/

The pipeline would be supplied by natural gas from the second stage of the Shah Deniz (Azerbaijan) gas field development in the Azerbaijani section of Caspian Sea through the South Caucasus Pipeline and the Trans Anatolian Pipeline (TANAP).[6][7] Since it will enhance energy security and diversify gas supplies for several European markets, the TAP project is supported by the European institutions and seen as a "Project of Common Interest" and a part of the Southern Gas Corridor.[8][9]

History

Trans Adriatic Pipeline project was announced in 2003 by Swiss energy company EGL Group (now named Axpo). The feasibility study was concluded in March 2006. Two options were investigated: a northern route through Bulgaria, the North Macedonia and Albania, and a southern route through Greece and Albania, which finally was considered to be more feasible. In March 2007, the extended basic engineering for the pipeline was completed.[10] Greece was opposed to having the route of the Trans Adriatic Pipeline pass through Albania, as it would allow Albania to become the transmission hub for gas in the Western Balkans.[11]

On 13 February 2008, EGL Group and the Norwegian energy company Statoil signed an agreement to set up Trans Adriatic Pipeline AG, a joint venture to develop, build and operate the pipeline.[12] In June 2008, the project company filed an application with the Greek authorities to build a 200 kilometres (120 mi) section of the pipeline from Thessaloniki to the Greek-Albanian border.[13] In January 2009, the TAP project carried out a marine survey in the Adriatic Sea to verify the offshore route for the future gas pipeline.[14] A route assessment survey in Albania started in July 2009.[15] In March 2009, an intergovernmental agreement between Italy and Albania on energy cooperation mentioned TAP as a project of common interest for both countries. In January 2010, TAP opened country offices in Greece, Albania and Italy.[16] In March 2010, TAP submitted an application to Italian authorities for inclusion into the Italian gas network.[17]

On 20 May 2010, it was announced that E.ON becomes a partner in the project.[18] The deal was successfully closed on 7 July 2010.[19]

In November 2010, TAP started a route refinement survey in northern Greece in preparation for the environmental impact assessment.[20] On 7 September 2011, the Trans Adriatic Pipeline AG (TAP AG) submitted its EU Third Party Access Exemption applications in all three host countries. Exemption will allow TAP AG to enter into long term ship-or-pay gas transportation agreements with the shippers of Shah Deniz II gas.[21][22] The exemptions were granted on 16 May 2013.[23][24]

In February 2012, the Trans Adriatic Pipeline was the first project to be pre-selected and to enter exclusive negotiations with the Shah Deniz Consortium.[25] In August 2012, consortium partners BP, SOCAR and Total S.A. signed a funding agreement with TAP's shareholders, including an option to take up to 50% equity in the project.[26]

Corrado Passera (Italy), Dimitris Avramopoulos (Greece) and Edmond Haxhinasto (Albania) are signing intergovernmental agreement.

On 28 September 2012, Albania, Greece and Italy confirmed their political support for the pipeline by signing a memorandum of understanding.[27]

On 22 November 2012, the TAP consortium and Trans-Anatolian gas pipeline's partners signed a memorandum of understanding that establishes a cooperation framework between the two parties.[28]

In February 2013, Greece, Italy and Albania signed an intergovernmental agreement.[29]

In June 2013, the project was chosen as a route for gas from Shah Deniz II over the competing Nabucco West project.[30] Later in 2013, BP, SOCAR, Total, and Fluxys became shareholders of the project.[31]

In December 2015, Snam joined TAP, acquiring Statoil’s 20% interest in the project.[32]

Technical description

TAP west of Korçë, Albania

The pipeline starts at the Greece–Turkey border at Kipoi, Evros, where it will be connected with the Trans-Anatolian gas pipeline. It will cross Greece, Albania and the Adriatic Sea and come ashore in Italy near San Foca. The total length of the pipeline will be 878 kilometres (546 mi), of which 550 kilometres (340 mi) in Greece, 215 kilometres (134 mi) in Albania, 105 kilometres (65 mi) in offshore, and 8 kilometres (5.0 mi) in Italy. The offshore leg will be laid at a maximum depth of 810 metres (2,660 ft).[33]

The initial capacity of the pipeline will be about 10 billion cubic metres (350 billion cubic feet) of natural gas per year, with the option to expand the capacity up to 20 billion cubic metres (710 billion cubic feet).[12] It will use 48-inch (1,200 mm) pipes for pressure of 95 bars (9,500 kPa) on the onshore section and 36-inch (910 mm) pipes for pressure of 145 bars (14,500 kPa) on the offshore section.[34]

TAP also plans to develop an underground natural gas storage facility in Albania and offer a reverse flow possibility of up to 8.5 billion cubic metres (300 billion cubic feet). These features will ensure additional energy security for the Southeastern Europe.[35][36]

Total construction costs are expected to be about €4.5 billion.[37] TAP will be ready to commence pipeline operations in time for first gas exports from Shah Deniz II (expected in 2017–2018).[21][38]

The "Interconnector" (IGB) is intended to connect Greece and Bulgaria.[39]

Project company

Trans Adriatic Pipeline AG is a joint venture company registered in Baar, canton Zug, Switzerland, with a purpose of planning, developing and building the TAP pipeline. [40] The Managing Director of the company is Luca Schieppati.[41]

Shareholders of the Trans Adriatic Pipeline are BP (20%), SOCAR (20%), Snam (20%), Fluxys (19%), Enagas (16%) and Axpo (5%).[42]

Financing

TAP is estimated to cost around EUR 4.5 billion.[43]

The European Bank for Reconstruction and Development (EBRD) considers a USD 1.5 billion loan. "We are considering up to 500 million euros of our own money for TAP plus we will try to arrange with other banks up to 1 EUR billion in a syndicated loan," Riccardo Puliti, managing director of energy at the EBRD said.[44]

On 6 February 2018, The European Investment Bank (EIB) voted to hand out EUR 1.5 Billion, one of Europe’s largest ever loans, to one of the EU’s largest fossil fuel projects, the Trans Adriatic Pipeline.[45]

A third of 4.5 billion euro budget has gone into constructing the section within Albania.[46] Pipeline costs were due to construction stoppages related to dove breading seasons, crossing mountains 2,000 metres above sea level and rivers at 19 points on the route including 8 areas of the Seman river.[46] Other costs involved dealing with twice the number of landowners within Albania, unlike in Greece.[46]

Protests

There have been incidents of protests by both local citizens and government officials against the Trans Adriatic Pipeline.

In Italy the TAP requires construction of a gas terminal in a historical olive grove in the countryside near the Apulian town of Melendugno. The site presents some century-old olive trees which are to be explanted and transferred to an alternative location in an operation that cannot guarantee the trees' survival. This has been criticised by the local public as well as environmentalists, also in relation to a deadly parasitic disease (Xylella fastidiosa) that has been affecting olive groves in the region for years, and can spread to previously unaffected areas with tree relocation.[47]

Furthermore, the pipeline's landing point on the Italian coast is located under the pristine beach of San Foca, a popular destination for beachgoers. Locals and environmentalists have raised safety concerns regarding millions of cubic litres of compressed flammable gas being piped only 10 metres under a beach that will be kept open to the public during the summer months.[48]

Some government officials, such as multiple mayors from the area and the governor of the region of Apulia, also supported the environmentalists' opinion that the pipeline might cause more harm than good and could be an opportunity for local organised crime and corruption to infiltrate public tenders for construction work on the Italian side. They worry especially in relation to a taxpayer-funded 60-kilometre long interconnector which will have to be built to link the TAP's Italian terminal in Melendugno to Italy's national gas network near the industrial port of Brindisi. The Apulia Region governor Michele Emiliano told an Al Jazeera English crew in 2016 that he could not understand why an alternative landing point to San Foca beach, closer to the Brindisi industrial area, was not chosen in spite of lower costs, less severe environmental impact, and proximity to pre-existing gas infrastructure.[48]

In a business event, local mayors left a conference room in Bari when someone commented on how the TAP will not damage the environment and will increase tourism and agriculture.[49]

See also

References

  1. "Trans Adriatic Pipeline route". tap-ag.com. Retrieved 22 March 2015.
  2. "About us". tap-ag.com. Retrieved 22 March 2015.
  3. "TAP project development schedule". tap-ag.com. Retrieved 22 March 2015.
  4. "TAP at a glance". Retrieved 22 March 2015.
  5. "Construction of the Trans Adriatic Pipeline". tap-ag.com. Retrieved 22 March 2015.
  6. "Time to act on diversifying EU gas supplies". New Europe. Retrieved 20 January 2013.
  7. "Adriatic pipeline to tap into Azeri gas". EurActiv. 15 September 2010. Retrieved 15 September 2010.
  8. Gas Regional Investment Plan Southern Corridor 2012 - 2021. Annex B: Infrastructure Projects (PDF) (Report). ENTSOG. 30 January 2012. p. 46. Retrieved 27 February 2013.
  9. "Trans Adriatic Pipeline EU status". Trans Adriatic Pipeline (TAP) AG. Retrieved 14 March 2013.
  10. "Natural gas pipeline through Adriatic achieves major milestone" (Press release). EGL. 13 March 2007. Archived from the original on 8 March 2012. Retrieved 16 July 2010.
  11. Mejdini, Fatjona (31 March 2017). "Albania Spies Gold in Projects Linked to TAP". Balkan Insight.
  12. "StatoilHydro takes place at TAP table". Upstream Online. NHST Media Group. 13 February 2008. Retrieved 16 February 2008.
  13. "TAP lays groundwork in Greece". Upstream Online. NHST Media Group. 19 June 2008. Retrieved 18 August 2008.
  14. "Marine survey in the Adriatic Sea to verify offshore route of the Trans Adriatic Pipeline" (Press release). Trans Adriatic Pipeline AG. 22 January 2009. Retrieved 16 June 2009.
  15. "Route assessment survey begins in Albania for Trans Adriatic Pipeline". Balkans.com Business News. 13 July 2009. Archived from the original on 7 July 2011. Retrieved 18 July 2009.
  16. "Trans-Adriatic Gas Pipeline Co. Opens Offices in Albania, Italy, Greece". SeeNews. 20 January 2010. Archived from the original on 16 July 2011. Retrieved 16 July 2010.
  17. "Trans Adriatic Pipeline taps into Italy's gas grid". Pipelines International. 17 March 2010. Archived from the original on 24 July 2011. Retrieved 16 July 2010.
  18. "E.ON Ruhrgas joins Trans Adriatic Pipeline". Oil and Gas Journal. PennWell Corporation. 21 May 2010. (subscription required). Retrieved 25 May 2010.
  19. "E.ON firms TAP stake". Upstream Online. NHST Media Group. 7 July 2010. Retrieved 7 July 2010.
  20. "Trans-Adriatic Pipeline begins route refinement study in northern Greece". European Energy Review. 23 November 2010. Retrieved 1 December 2010.
  21. "Trans Adriatic Pipeline submits Third Party Access Exemptions in Albania, Greece & Italy". Greece. Energia.gr. 13 September 2011. Retrieved 13 September 2011.
  22. "Trans Adriatic Pipeline submits Independent Natural Gas application to Greek regulator". Offshore Magazine. PennWell Corporation. 15 September 2011. Retrieved 16 September 2011.
  23. "Commission decision of 16.5.2013 on the exemption of the Trans Adriatic Pipeline from the requirements on third party access, tariff regulation and ownership unbundling laid down in Articles 9, 32, 41(6), 41(8) and 41(10) of Directive 2009/73/EC" (PDF). European Commission. 16 May 2013. Archived from the original (PDF) on 11 February 2014. Retrieved 11 July 2013.
  24. Gloystein, Henning (17 May 2013). "TAP gas pipeline project gets vital legal approval" (PDF). Reuters. Retrieved 11 July 2013.
  25. Geropoulos, Kostis (21 February 2012). "TAP, Nabucco and SEEP still in EU pipeline race". New Europe. Retrieved 14 March 2013.
  26. Lewis, Barbara (9 August 2012). "BP, Socar, Total pledge to fund gas pipeline-TAP". Reuters. Retrieved 10 March 2013.
  27. Agayev, Zulfugar (28 September 2012). "TAP Gas Pipeline Project Gains Support of Italy, Greece, Albania". Bloomberg. Retrieved 13 March 2013.
  28. "TAP Managing Director: Cooperation with TANAP is milestone for Southern Gas Corridor progress". Trend News Agency. 7 March 2013. Retrieved 15 March 2013.
  29. "Commissioner Oettinger welcomes the signature of an intergovernmental agreement on TAP" (Press release). European Commission. 13 February 2013. Retrieved 14 March 2013.
  30. O'Cinneide, Eoin (28 June 2013). "TAP confirmed as Shah Deniz 2 winner". Upstream Online. NHST Media Group. Retrieved 11 July 2013.
  31. Socor, Vladimir (15 January 2014). "SCP, TANAP, TAP: Segments of the Southern Gas Corridor to Europe". Eurasia Daily Monitor. 11 (8). Heritage Foundation. Retrieved 18 January 2014.
  32. Badalova, Aygun. "Snam becomes shareholder in TAP". Trend.az. Retrieved 18 December 2015.
  33. Shaban, Ilham (16 June 2016). "TAP INAUGURATION IN GREECE TO TAKE PLACE MAY 17". Natural Gas Europe. Natural Gas Europe. Retrieved 2 June 2016.
  34. "Connecting Caspian Gas to European Markets. A summary of the Trans Adriatic Pipeline's Decision Support Package proposal to the Shah Deniz Consortium" (PDF). Trans Adriatic Pipeline AG. Retrieved 11 July 2013.
  35. "Europe's southern gas corridor: The great pipeline race". EurActiv. 11 October 2010. Retrieved 1 December 2010.
  36. Grgic, Borut (11 May 2010). "Getting natural gas to the Balkans". Hurriyet Daily News. Retrieved 1 December 2010.
  37. Temizer, Murat (31 January 2017). "Mr". Anadolu Agency. Turkey. Retrieved 5 May 2017.
  38. "Turkey, Azerbaijan sign long-awaited gas deal". Azerbaijan. News.az. 7 June 2010. Retrieved 15 July 2010.
  39. Tsipras in Sofia: Auftrieb für griechisch-bulgarische Beziehungen, Retrieved 02.12.2016
  40. "Trans Adriatic Pipeline AG, Baar" (in German). itonex ag. Retrieved 12 January 2010.
  41. Lock, Angharad (27 June 2017). "Digital Assistant Editor". World Pipelines. Retrieved 27 July 2017.
  42. Badalova, Aygun (17 December 2015). "Snam becomes shareholder in TAP". Trend.az. Retrieved 18 December 2015.
  43. Temizer, Murat (31 January 2017). "Mr". Anadolu Agency. Retrieved 5 May 2017.
  44. Chestney, Nina. "EBRD considers 1.5 billion euro funding for Trans-Adriatic gas pipeline". Reuters UK. Retrieved 25 January 2017.
  45. url=https://bankwatch.org/press_release/controversial-gas-pipeline-gets-eur-1-5-billion-in-public-money-amid-massive-climate-risk February 2018|Controversial gas pipeline gets EUR 1.5 billion in public money amid massive climate risk
  46. Koleka, Benet (30 April 2019). "TAP gas pipeline crosses Albanian rocky mountains". Reuters. Retrieved 30 April 2019.
  47. "Italian olive grove stands in way of European energy security". www.reuters.com. Retrieved 14 March 2018.
  48. "Italy to hold referendum on local autonomy". www.aljazeera.com. Retrieved 14 March 2018.
  49. "Italian mayors protest against the Trans Adriatic Pipeline". www.bankwatchllorg. Retrieved 11 October 2017.