Peddapalli–Nizamabad section

Peddapalli-Nizamabad section is a single-track broad gauge railway line in the Indian state of Telangana. It connects Nizamabad and Peddapalli in South Central Railway zone.[1] It reduces the distance between Nizamabad, Karimnagar and Warangal. Peddapalli is located on Kazipet-Balharshah section of Delhi-Chennai line, known as Grand Trunk line and Nizamabad is located on Secunderabad-Manmad Line.

Peddapalli-Nizamabad Line
Route Map
Overview
SystemDiesel (Electrification in progress)
StatusOperational
LocaleTelangana
TerminiNizamabad Railway Station
Peddapalli Railway Station
Stations~16
ServicesDelhi-Chennai line
Secunderabad-Manmad section
Operation
Opened25 March 2017
OwnerIndian Railway
Operator(s)South Central Railway Zone (India)
Technical
Line length177 km
Track gaugeBroad gauge 1,676 mm (5 ft 6 in)

History

Peddapalli-Karimnagar-Nizamabad railway line (177 km) was sanctioned by the Late Shri.P.V. Narasimha Rao[2] who was the 10th Prime Minister of India in the year of 1993.[3] It took 23 years to be completed in a phased manner.[4]

The section between Peddapalli and Karimnagar was completed and train services were started in 2001. It took another 6 years to complete the stretch between Karimnagar and Jagityal and passenger trains were extended till Jagityal from 2007. On 29 December 2016 upon the completion of railway tracks between Jagityal and Morthad, the demu trains were further extended till Morthad mandal of Nizamabad district and passenger trains began moving between Karimnagar-Morthad and Peddapalli-Jagityal. After the fund allocation for the remaining section between Morthad and Nizamabad, the works were accelerated and within a year the Peddapalli-Nizamabad line via Karimnagar was ready for operations and the services began from 25 March 2017.

Stations

  • Peddapalli Junction (PDPL)
  • Sultanabad (STBD)
  • Karimnagar (KRMR)
  • Kothapalli(haveli) (KPHI)
  • Gangadhara (GDRA)
  • Podur (PUDR)
  • Mallial Nukapalli (NPML)
  • Lingampet-Jagityal(LPJL)
  • Medipalli (MDPLI)
  • Korutla (KRLA)
  • Metpally(MTPI)
  • Morthad (MRTD)
  • Anksapur (AKSP)
  • Armoor (ARMR)
  • Mamidipalle (MMDPL)
  • Nizamabad Junction (NZB)

Electrification

Single line electrification is completed between Peddapalli and Lingampet Jagityal section (83 km) under Phase 1 Construction completed in March 2019. Phase 2 from Lingampet Jagityal till Nizamabad is under construction.

Markings are completed . Poles laying work started in 2020.

Passenger Trains

  • Karimnagar-Tirupati-Karimnagar Super Fast Express (12762/12761)
  • Kacheguda- Karimnagar- Kacheguda PASS (57601/02)
  • Karimnagar-Sirpur Town-Karimnagar DEMU (77255/77256)
  • Karimnagar-Lingampet Jagityal-Karimnagar DEMU (77274/77273)
  • Peddapalli-Lingampet Jagityal-Peddapalli DEMU (77258/77257)
  • Nizamabad-Karimnagar-Nizamabad DEMU (77260/77259)
  • MumbaiLTT-Karimnagar-Karimnagar Express (11205/11206)

References

  1. "Surveys" (PDF). South Central Railway, Indian Railways. 24 July 2015. p. 1. Retrieved 3 May 2019.
  2. "P V Narasimha Rao's projects in North Telangana neglected". Deccan Chronicle. Retrieved 30 August 2014.
  3. "Peddapalli-Nizamabad rail services soon". The Hindu. Retrieved 30 August 2014.