Long Thanh International Airport

Long Thanh International Airport (Vietnamese: Sân bay Quốc tế Long Thành) is an international airport currently under construction in Long Thanh, Dong Nai, Vietnam. Located approximately 40 km (25 mi) east of Ho Chi Minh City, it has been approved to start construction by the Vietnamese government on April 1, 2021. However, the Vietnamese government has decided to begin 2 years earlier in 2019 and it will be finished by 2025.[1] It will serve over 100 million passengers annually when built to the maximum designed capacity.

Long Thanh International Airport

Sân bay Quốc tế Long Thành
Summary
Airport typePublic
OwnerGovernment of Vietnam
OperatorAirports Corporation of Vietnam (ACV)
ServesHo Chi Minh City
LocationLong Thanh, Dong Nai, Vietnam
Elevation AMSLN/A m / N/A ft
Coordinates10°46′21″N 107°2′43″E
Map
Long Thanh International Airport
Runways
Direction Length Surface
m ft
N/A 4,000 13,123 Concrete
N/A 4,000 13,123 Concrete
N/A 4,000 13,123 Concrete
N/A 4,000 13,123 Concrete
Proposed location of Long Thanh Airport in the Ho Chi Minh city region
Satellite view of the proposed location as of 2019

History

Urgent necessity for a new airport

Tan Son Nhat International Airport is the only international airport in the planned Ho Chi Minh City Metropolitan Area (covering 30,404 square kilometres (11,739 sq mi), with an estimated population of 20-22 million inhabitants by 2020, of which there will be 16 - 17 million urban inhabitants, accounting for 77 - 80% of total population).[2] Tan Son Nhat airport was built during the Vietnam War to support war transportation, hence its location inside the crowded Saigon where growth is limited. Due to location and safety issues, it is difficult to expand to meet the increasing annual growth of passengers. The maximum capacity of Tan Son Nhat is 25 million passengers per annum but in 2016 it handled 32.5 million.[3][4]

The flow of international tourists to the South of Vietnam is increasing dramatically, by 15 to 20 percent annually. Promoting the domestic market (current population of 87 million, forecast of 100 million by 2020) by building a new airport that can adapt to future needs is necessary. Tan Son Nhat airport will serve the international and domestic flights until the completion of the new Long Thanh International Airport. The airport will be able to handle the world's biggest commercial aircraft, Airbus A380.

Under current plans by the Vietnamese government, the Airports Corporation of Vietnam will be the main investor and operator of the airport.[5]

Master Plan

The Master Plan for Long Thanh International Airport was approved by the Prime Minister Phan Văn Khải in 2006 and several adjustments have been made through time. The project faced mixed public reaction for its expensive cost and far distance from the center of Ho Chi Minh City.[6]

Based on the demand of transportation, the investment will be divided in phases. The Southern Airports Corporation (a company under the Ministry of Transport (Vietnam)) is in charge of development of this project.

Phase 1 (2019 – 2025)

The first phase is estimated to cost US$7.8billion and will be divided into 3 sub-phases.[7]

Phase 1A (2019 – 2023)

According to the original plan, the airport would handle 25 million passengers per year after this phase is completed; however, the proposed capacity was later lowered to 17 million passengers per year to reduce construction cost.[8] US$5.6billion will be allocated to this phase. One terminal will be built along with a single runway.[9]

Phase 1B (2023 – 2025)

Another runway will be built and increase the total capacity to 25 million passengers per annum.

Phase 1C (2025)

The rest of necessary facilities will be built and land-clearance for future phases will be made. The airport will begin operating in 2025.

Phase 2 (2025 – 2035)

The capacity will be doubled to 50 million passengers per annum and the third runway will be added when the phase is finished, which is scheduled to be in 2035.

Phase 3 (After 2035)

The airport will reach its maximum designed capacity at 80-100 million passengers and 5 million tonnes of cargo per year. Four runways will be operational after the third phase.

Ground transportation

Road

The airport will be accessible via the National Highway 51, Bien Hoa-Vung Tau Expressway and Ho Chi Minh City–Long Thanh–Dau Giay Expressway, construction is expected be completed before the airport opens in 2025. A third road is planned east of the airport and will connect with the Dau Giay–Phan Thiet Expressway as part of the second phase of the airport plan from 2025. The airport will also be accessible via the future Bien Hoa–Vung Tau Expressway.[10]

Rail

A new high-speed railway service is proposed to be connected to the new airport as part of the Ho Chi Minh City–Nha Trang section of the North-South high-speed railway line. Airport planners propose a high-speed railway line be built to the airport as it will give passengers a more direct and efficient transit option to Ho Chi Minh City than by road which is already congested closer to the city centre. There are also future plans for a light metro line connecting the airport to Thu Thiem.[10]

See also

References

  1. "New airport in Dong Nai expected to open by 2020". Archived from the original on 2011-07-16. Retrieved 2011-03-10.
  2. "Planning for Saigon Metropolitan Area". Archived from the original on 2012-03-30. Retrieved 2011-08-15.
  3. "Overcapacity And The Investment Capital Headache". Archived from the original on 2017-12-26. Retrieved 2011-08-15.
  4. Long Thanh Airport on Dong Nai government official website
  5. "Long Thanh airport will operate by 2025: transport minister". Vietnam News Agency (VNA). Retrieved 9 November 2019.
  6. Kiên, Cường; Hoàng, Thư. "Ý kiến trái chiều trong việc xây sân bay Long Thành". vnexpress.net. VNExpress. Retrieved 19 September 2014.
  7. "Gánh nặng 8 tỷ USD với dự án sân bay Long Thành". vnexpress.net. VNExpress. Retrieved 19 September 2014.
  8. "Thu hẹp Sân bay Long Thành giai đoạn 1". vnexpress.net. VNExpress. Retrieved 19 September 2014.
  9. "Sân bay Long Thành trông đợi vào ngân sách nhà nước". vnexpress.net. VNExpress. Retrieved 19 September 2014.
  10. The Saigon Times Daily (9 October 2019). "ACV proposes two road projects for Long Thanh airport". Retrieved 9 November 2019.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.