Line 3 (Zhengzhou Metro)

Line 3 of Zhengzhou Metro (Chinese: 郑州地铁3号线; pinyin: zhèngzhōu dìtiě sānhào xiàn) is a rapid transit line under construction in Zhengzhou that will run in a northwest - southeast direction. The line will use six car Type A trains.[1] This line is currently under construction and is expected to start operation in 2020.[2]

Line 3
 3 
Overview
TypeRapid transit
SystemZhengzhou Metro
StatusUnder construction
LocaleZhengzhou, Henan, China
Stations21
Operation
OwnerZhengzhou
Operator(s)Zhengzhou Metro Group Corporation
CharacterUnderground
Technical
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead lines (1500 volts)

Stations

Map of Zhengzhou Metro Line 3. Including planned extension in future.

The names of stations in the list are proposed names and future changes are highly possible.

Station name Connections Distance
km
Location
English Chinese
Henan Sports Center 省体育中心  4  Huiji
Wangzhai 王砦
Xinglongpu 兴隆铺
Tongle 同乐  8  Jinshui
Nanyangxincun 南阳新村
Haitansi 海滩寺  5 
Dashiqiao 大石桥  7 
Renmingongyuan 人民公园 Erqi
Erqiguangchang 二七广场  1 
Xidajie 西大街 Guancheng
Dongdajie 东大街  2 
Zhengzhou Confucius Temple 郑州文庙
Expo Center 博览中心  6 
Fenghuangtai 凤凰台 Jinshui
Dongshilipu 东十里铺  4 
Tongtailu 通泰路
Xizhou 西周  12  Guancheng
Dongzhou 东周
Henan Orthopaedics Hospital 省骨科医院  5 
Putianxi 圃田西  8 
Yinggang 营岗
  • Line 7,8,12 are planned.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.