Line 3 (Jinan Metro)

Line 3 of Jinan Metro (Chinese: 济南地铁3号线; pinyin: Jǐnán Dìtiě Sān Hào Xiàn) is a rapid transit line in Jinan. The line use 6-car Type B rolling stock. The line is 21.592 km in length. It is fully underground.

Line 3
Overview
Other name(s)R3[1] (construction name)
TypeRapid transit
SystemJinan Metro
StatusOperational
LocaleJinan
TerminiLongdong
Tantou (Phase 1)
Stations13 (12 operational)[lower-alpha 1]
Operation
Opened28 December 2019[2]
CharacterUnderground
Rolling stock6-car Type B
Technical
Line length21.592 km (13.4 mi)
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed100 km/h

It was opened on 28 December 2019.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Longdong — Tantou 28 December 2019[2] 21.592 km (13.4 mi) 12[lower-alpha 1] Phase 1

Stations

Station Name Connections Distance
km
English Chinese
Longdong 龙洞    
Mengjiazhuang 孟家庄    
Longao Building 龙奥大厦    
Olympic Center 奥体中心    
Ligenglu 礼耕路    
Dingjiazhuang 丁家庄    
Huayuandonglu 花园东路    
Bajianpu 八涧堡  2  (under construction)    
Zhangmatun 张马屯    
Wangsheren 王舍人    
Peijiaying 裴家营    
Jinandong Railway Station 济南东站 MDK    
Tantou 滩头    

Notes

  1. There are 13 stations in Phase 1 of Line 3. Peijiaying station is not opened.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.