Line 2 (Hangzhou Metro)
Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[4][5]
Line 2 | |
---|---|
2 | |
People Square Station | |
Overview | |
Type | Rapid transit |
System | Hangzhou Metro |
Status | Operating |
Locale | Hangzhou, Zhejiang |
Termini | Chaoyang Liangzhu |
Stations | 33 (32 in operation[lower-alpha 1] |
Daily ridership | 81,900 (2015 peak)[1] |
Operation | |
Opened | 24 November 2014[2] |
Owner | Hangzhou |
Operator(s) | Hangzhou Metro Corporation |
Character | Underground |
Rolling stock | 6 cars, type B |
Technical | |
Line length | 43.3 km (26.91 mi)[3] |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Overhead 1500V DC |
Operating speed | 80km/h (50mph) |
The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[5]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chaoyang — Qianjiang Road | 24 November 2014 | 18.3 km (11.37 mi) | 12 | Phase 1 (southeastern section) |
Qianjiang Century City | 28 April 2016 | Infill station | 1 | |
Qianjiang Road — Gucui Road | 3 July 2017 | 11.3 km (7.02 mi) | 9 | Phase 1 (northwestern section) |
Gucui Road — Liangzhu | 27 December 2017 | 13.32 km (8.28 mi) | 10 | Phase 2 & 3 |
Stations
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Liangzhu | 良渚 | Yuhang | |||
Dufucun | 杜甫村 | ||||
Baiyang | 白洋 | ||||
Jinjiadu | 金家渡 | 4 | |||
Dunxiang Street | 墩祥街 | ||||
Sandun | 三墩 | Xihu | |||
Xialongwei | 虾龙圩 | ||||
Sanba | 三坝 | 5 | |||
Wenxin | 文新 | ||||
Fengtan Road | 丰潭路 | ||||
Gucui Road | 古翠路 | ||||
Xueyuan Road | 学院路 | 10 | |||
Xianing Bridge | 下宁桥 | ||||
Shentangqiao | 沈塘桥 | Airport | Xihu / Gongshu | ||
Wulinmen | 武林门 | 3 | Xihu / Xiacheng | ||
Fengqi Road | 凤起路 | 1 | Xiacheng | ||
North Zhonghe Road | 中河北路 | ||||
North Jianguo Road | 建国北路 | 5 | |||
Qingling Road | 庆菱路 | Jianggan | |||
Qingchun Square | 庆春广场 | ||||
Qianjiang Road | 钱江路 | 4 9 | |||
Qianjiang Century City | 钱江世纪城 | 6 | Xiaoshan | ||
Yingfeng Road | 盈丰路 | ||||
Feihong Road | 飞虹路 | ||||
Zhenning Road | 振宁路 | ||||
Jianshesan Road | 建设三路 | 7 | |||
Jiansheyi Road | 建设一路 | ||||
People Square | 人民广场 | 5 | |||
Hangfachang | 杭发厂 | ||||
Renmin Road | 人民路 | ||||
Panshui | 潘水 | ||||
Caojiaqiao | 曹家桥 | ||||
Chaoyang | 朝阳 | ||||
![](../I/m/Hangzhou_Metro_Line_2.svg.png)
To scale map of Line 2 (Hangzhou Metro)
Notes
- Xianing Bridge station is not operational.
References
- Cui Diyi (霍翟羿). 113.09万人次! 杭州地铁"五一"客流破百万. Zhejiang News. Retrieved Jan 5, 2016.
- 杭州地铁2号线24日试运营 列车全天运行15小时. 杭州地铁网. 2014-11-12.
- "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 2017-12-27.
- 杭州地铁2号线铺新轨. December 22, 2012.
- 杭州地铁2号线一期工程. December 11, 2012. Archived from the original on December 15, 2013.
![]() |
Wikimedia Commons has media related to Line 2, Hangzhou Metro. |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.