Line 10 (Shanghai Metro)

Line 10 is a southwest-northeast line of the Shanghai Metro network. It officially opened for service on April 10, 2010.[2][3] The line runs from Xinjiangwancheng to Hongqiao Railway Station, with a branch line from Longxi Road to Hangzhong Road. It connects the Hongqiao International Airport with the downtown core of Shanghai, and also the dense residential districts of Yangpu and Hongkou.[4]

Line 10
Overview
Other name(s)M1 (planned name)
TypeRapid transit
SystemShanghai Metro
StatusOperational, extension to Jilong Road under construction
LocaleMinhang, Changning, Xuhui, Huangpu, Jing'an, Hongkou, and Yangpu districts
Shanghai
TerminiXinjiangwancheng
Hangzhong Road / Hongqiao Railway Station
Stations37
Daily ridership1.085 million (2019 peak)[1]
Operation
OpenedApril 10, 2010 (2010-04-10)
CharacterUnderground
Technical
Line length45 km (27.96 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed80 km/h (49.71 mph)
Route map

The line is fully automated and driverless. It is the only line in the system with numbered station codes, and is colored lilac on system maps.

To scale map of Shanghai Metro Line 10

Stations

Service
routes[5]
Station
Station name Connections Distance
km
Location
English Chinese
L10/01 Hongqiao Railway Station 虹桥火车站  2   17  AOH 0.00 0.00 Minhang
L10/02 Hongqiao Airport Terminal 2 虹桥2号航站楼  2  SHA 0.56 0.56
L10/03 Hongqiao Airport Terminal 1 虹桥1号航站楼 SHA 1.93 2.49
L10/04 Shanghai Zoo 上海动物园 1.96 4.45 Changning
L10/05-3 Hangzhong Road 航中路 1.03 5.48 Minhang
L10/05-2 Ziteng Road 紫藤路 1.19 6.67
L10/05-1 Longbai Xincun 龙柏新村 2.38 9.05
L10/05 Longxi Road 龙溪路 1.27 10.32 Changning
L10/06 Shuicheng Road 水城路 1.27 11.59
L10/07 Yili Road 伊犁路 1.25 12.84
L10/08 Songyuan Road 宋园路 0.81 13.65
L10/09 Hongqiao Road 虹桥路  3   4  0.99 14.64 Xuhui
L10/10 Jiaotong University 交通大学  11  1.27 15.91
L10/11 Shanghai Library 上海图书馆 1.18 17.09
L10/12 South Shaanxi Road 陕西南路  1   12  1.54 18.63 Huangpu
L10/13 Xintiandi 新天地  13  1.68 20.31
L10/14 Laoximen 老西门  8  0.86 21.17
L10/15 Yuyuan Garden 豫园 1.35 22.52
L10/16 East Nanjing Road 南京东路  2  1.17 23.69
L10/17 Tiantong Road 天潼路  12  0.71 24.40 Jing'an
L10/18 North Sichuan Road 四川北路 0.92 25.32 Hongkou
L10/19 Hailun Road 海伦路  4  0.92 26.24
L10/20 Youdian Xincun 邮电新村 1.19 27.43
L10/21 Siping Road 四平路  8  1.01 28.44
L10/22 Tongji University 同济大学 0.97 29.41 Yangpu
L10/23 Guoquan Road 国权路 0.84 30.25
L10/24 Wujiaochang 五角场 1.02 31.27
L10/25 Jiangwan Stadium 江湾体育场 0.60 31.87
L10/26 Sanmen Road 三门路 1.26 33.13
L10/27 East Yingao Road 殷高东路 1.00 34.13
L10/28 Xinjiangwancheng 新江湾城 0.79 34.92
L10/29 Guofan Road 国帆路 1.54 36.46 Yangpu
L10/30 Shuangjiang Road 双江路 3.25 39.71 Pudong
L10/31 West Gaoqiao 高桥西 1.35 41.06
L10/32 Gaoqiao 高桥 1.20 42.26
L10/33 Gangcheng Road 港城路  6  0.99 43.25
L10/34 Jilong Road 基隆路 1.69 44.94

Note: Eastbound trains from Hongqiao Railway Station may terminate at Jiangwan Stadium.

Important stations

History

SegmentCommencementLengthStation(s)Name
Longxi Road — Xinjiangwancheng 10 April 2010 24.76 km (15.39 mi) 24 Phase I (1st section)
Hangzhong Road — Longxi Road 4.84 km (3.01 mi) 3
Hongqiao Railway Station — Longxi Road 30 November 2010 5.8 km (3.60 mi) 4 Phase I (2nd section)

Future

The second phase, under construction, is a northern extension of the first phase of Line 10 from Xinjiangwancheng to Jilong Road. This phase will be completed by 2020.

Rolling stock

TypeTime of manufacturingSeriesSetsAssemblyNotes
Type A2009-201010A0141Tc+Mp+M+M+Mp+TcManufactured by Alstom and CSR Puzhen.
Type A2017-10A0226Tc+Mp+M+M+Mp+TcManufactured by CSR Puzhen.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.