King City GO Station

King City GO Station is a train and bus station in the GO Transit network located in King City, Ontario in Canada. It also serves the nearby communities of Nobleton, Oak Ridges, the northern parts of Maple (in Vaughan), and other communities in King Township. It is a stop on the Barrie line train service.

King City
Location7 Station Road
King City, Ontario
Canada
Coordinates43°55′12″N 79°31′37.2″W
Owned byMetrolinx
Platforms1 side platform, 250m long[1]
Tracks1
Connections York Region Transit
Construction
Structure typeBrick station building
Parking555 spaces
Bicycle facilitiesYes
Disabled accessYes
Other information
Station codeGO Transit: KC
Fare zone62
History
Opened7 September 1982
Services
Preceding station GO Transit Following station
Aurora Barrie Maple

History

Original King Station in background

The original King Station was built in 1852 at a location less than a kilometre north of the current station, adjacent to the community's inn. It was moved to the grounds of the King Township Museum in 1989, and was designated a heritage site in 1990.[2]

King Station, circa 1852. The oldest surviving railway station in Canada. Built by Northern Railway on lands donated by Isaac Dennis near his hotel in Springhill (now King City). Designed by F.W. Cumberland, architect, King Station witnessed Ontario's first steam locomotive "Toronto" on its inaugural run from Toronto to Machell's Corners (Aurora), May 16, 1853.

Heritage plaque text

GO Transit

The GO Station opened on 7 September 1982, with service extending south to Toronto and north to Bradford.

In 2002, with infrastructure funding from the provincial government, GO Transit expanded the station's parking lot capacity from 111 spaces to 255.[3]

During 2004, the platform was extended in order to accommodate longer trainsets, thus removing any boarding restrictions that GO Transit had with this station prior to opening the extended rail platform. In addition, the extension also eliminated the problem of GO trains blocking a railroad crossing on Station Road while passengers boarded and disembarked.

Construction of a covered station building was completed in the summer of 2005, and a second parking lot on the west side of the tracks was opened in February 2006.[4]

Services

As of January 2018, train service operates approximately every 15-30 minutes in the morning peak period, every 30 minutes in the afternoon peak period and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.[5]

On weekends and holidays, service operates approximately every hour to and from Union Station, with most trains terminating at Aurora station. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.[5]

Connecting York Region Transit and GO buses serve the station from a bus stop on Keele Street at Station Road.

Ridership

Daily train boarding at the station has increased from 199 in 2005 to a peak of 680 in 2008.[6] In 2012, there were 655 daily boardings,[6] or approximately 170,000 riders annually. GO Transit bus route 63, which travels between the King City GO Station and Union Station Bus Terminal via Maple and Rutherford GO stations, [5] served a daily average of 450 riders at this station in 2012.[6]

References

  1. Metrolinx 2010, p. 160.
  2. "King Railway Station 2920 King Road". The Corporation of the Township of King. Archived from the original on 6 May 2011. Retrieved 24 March 2011.
  3. "Province announces major parking expansion at King City GO Station". Government of Ontario Ministry of Transportation. 2002. Archived from the original on 16 December 2005. Retrieved 28 April 2006.
  4. "King City station gets more parking". Customer Bulletins. GO Transit. 3 February 2006. Archived from the original on 12 March 2006. Retrieved 14 May 2006.
  5. "Barrie Line - table 65" (PDF). GO Transit. January 5, 2019. Retrieved February 22, 2019.
  6. "Slides 15 - 22" (PDF). Transportation Master Plan. Township of King. 28 January 2014. Retrieved 30 April 2014.

Media related to King City GO Station at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.