Since the collapse of the Soviet Union in 1991 and end of the Cold War, the Royal Navy's mission transitioned from a anti-submarine focused force to a wider range of objectives around the world, while experiencing a gradual reduction in the size of its surface and submarine fleets. As a result, the Navy began a series of projects to improve its fleet, with a view to providing enhanced capabilities. This led to the replacement of smaller and more numerous units with fewer, but larger, units. For example the replacement of twelve Type 42 destroyers with six Type 45 destroyers and the replacement of the three 20,000-tonne Invincible-class aircraft carriers with two 65,000-tonne Queen Elizabeth-class aircraft carriers.

As of June 2020, the following are under construction or being laid down; the final three of seven Astute-class submarines; the first of four Dreadnought-class ballistic missile submarines, the first two of eight Type 26 frigates; the ninth of nine River-class ocean-going patrol vessels. In addition, early design and preparation work has begun for a fleet of at least five Type 31 frigates.

The National Audit Office (NAO) has described the Ministry of Defence's current equipment plan as "unaffordable". With respect to the 2019 to 2029 period, the NAO has noted that the Royal Navy has allocated no funding to replace certain key capabilities, specifically referencing the Royal Fleet Auxiliary hospital ship RFA Argus and the Royal Navy's mine countermeasures capability as examples. [1] These issues are planned to be addressed in the pending integrated foreign policy, security, defence and international development review which had been anticipated in 2020 but, due to Covid-19, is likely to be deferred for at least a year. [2][3]

Ships under construction

Royal Navy

The following is a list of vessels planned, ordered, under construction or undergoing sea trials within the United Kingdom, and destined for the Royal Navy:

Class Ship Pennant No. Builders Displacement Type Homeport Commissioning
River class TrentP224BAE Systems, Glasgow2,000 tonnesOffshore patrol vesselPortsmouthExpected 2020[4]
SpeyP234Expected 2021[4][5]
Astute class
AnsonS123BAE Systems, Barrow-in-Furness7,400 tonnesFleet submarineClydeTBC[6][7]
AgamemnonS124TBC
AgincourtS125Expected 2026[8]
Dreadnought class Dreadnought17,200 tonnesBallistic missile submarineClydeExpected early 2030s[8]
ValiantTBC
WarspiteTBC
King George VITBC
Type 26 GlasgowBAE Systems, Glasgow6,900 tonnesAnti-submarine frigateDevonportExpected 2026/27[9]
CardiffTBC
Belfast
Birmingham
Sheffield
Newcastle
Edinburgh
London
Type 31 TBCBabcock International, Rosyth5,700 tonnesGeneral-purpose frigateExpected 2026/27[10][9]
TBCTBC
TBC
TBC
TBC

Ships

Type 26 and Type 31 frigates

In the 2010 Strategic Defence and Security Review a replacement programme was authorized for the Navy's fleet of thirteen Type 23 frigates. In 2012, BAE Systems Naval Ships was awarded a contract to design the replacement, known as the Type 26 Global Combat Ship (GCS). It was planned that two variants of the class would be built: five general purpose frigates and eight anti-submarine warfare frigates. According to estimates as of 2020, the first Type 26 frigate is to commission in around 2026/27 and the last commissioning in around 2040, whilst the Type 23s are gradually phased out.[9][11] Eight Type 26 frigates will be built initially. The five remaining ships will be covered by a new class of lighter, flexible general purpose frigate, known as the Type 31e frigate or General Purpose Frigate (GPFF).[12][13] According to the Strategic Defence and Security Review 2015, the lower cost of these frigates could lead to the Royal Navy acquiring more than five of them, thus increasing its numbers of frigates and destroyers.[14]

However, in the interim it is anticipated that the slower than planned introduction of both the Type 26 and Type 31, coupled with the pending retirement dates for the Type 23, will mean that Royal Navy frigate numbers are likely to decline in the 2020s to as few as 9 frigates. By the latter 2020s and 2030s it is anticipated that numbers may rise again as the replacement vessels enter service. The only way to mitigate this impact would be for currently envisaged retirement dates for the Type 23 to be pushed back. [15] The question of how to address this challenge will have to be tackled in the integrated foreign policy, security, defence and international development review which is due in 2020-21 or, due to Covid-19, even later. [3]

In July 2016, BAE revealed two Type 31e designs, namely the Avenger-class and the Cutlass-class.[16] Work on the first Type 26 frigate, HMS Glasgow, began in July 2017.[17] On 6 September 2017, the UK government committed to building a first batch of five Type 31e frigates.[18] On 26 July 2018 the Government ‘paused’ the procurement citing the fact that neither of the submissions met the £250M price point. It stated that it would restart the procurement shortly.[19][20] On 10 December 2018, three groups were selected for the competitive design phase: BAE Systems/Cammell Laird with their planned Leander design, Babcock/BMT/Thales with their Arrowhead 140 design and Atlas Elektronik UK/Thyssenkrup Marine Systems, which is likely to be based on the MEKO A-200 design.[21] The Daily Telegraph reported the Arrowhead 140 design was chosen on 24 August 2019.[22] The Babcock-led Arrowhead 140 was officially announced by the UK government on 12 September 2019.[23]

Offshore patrol vessels

HMS Forth

In November 2013 it was announced that to sustain the UK shipbuilding base, and for defence-related reasons, three new offshore patrol vessels (OPVs) with Merlin-capable flight-decks are to be built.[24][25] In August 2014, BAE Systems was awarded a £348 million contract to design and build the new class. The vessels will be significantly larger than the River class and will be built on the Clyde in Scotland, with an in-service date of 2017. It is envisaged that they will be used for constabulary duties such as counter-terrorism, counter-piracy and anti-smuggling operations.[26] The vessels will be named, HMS Forth, HMS Medway and HMS Trent.[27] They will displace around 2,000 tonnes, be equipped with a 30 mm main gun, 16-tonne crane for two sea boats, capable of making 24 kn (44 km/h; 28 mph) and patrol for upwards of 6,000 miles or 35 days with a basic crew of just 34 or maximum of 60.[28] The latest Strategic Defence and Security Review 2015 stated that two more OPVs will be procured,[29] with the new vessels later receiving the names Tamar and Spey.[30]

Although the 2015 SDSR laid out plans for the five new River-class ships to supplant in service the existing vessels, in November 2018 it was announced that the first three ships, HMS Tyne, HMS Severn and HMS Mersey, would be retained for service in UK waters. These ships would also be "forward-deployed" to ports that correspond with their names – Tyne at Newcastle, Severn at Cardiff and Mersey at Liverpool.[31]

Mine countermeasures and Hydrographic Capability (MHC)

The 2010 SDSR stated that the existing Hunt class and Sandown class of mine countermeasure vessels were to be replaced. The new vessels would use a common hull and modular design to support modern mine countermeasure, hydrography and patrol requirements.[32] In December 2010, an analyst suggested that "Current plans seem to point to a single class of vessel about 100 m in length and between 2,000 and 2,500 tonnes displacement. These will deliver on the MCM, survey and patrol requirements using a range of off board systems like USV's, UAV's and UUV's." It was also said that any programme would seek "to replace the Hunt, Sandown, Echo and River-classes" currently in service.[33] During June 2011, BAE Systems and SeeByte of Edinburgh, Scotland, signed a "Co-operation Agreement to pursue business opportunities associated with the UK’s Mine Counter Measure (MCM), Hydrography and Patrol Capability (MHPC) Programme."[34] In January 2012, Dstl of the Ministry of Defence announced a programme – in 'Concept Phase' – with interests in the development of remote mine countermeasure and hydrography systems such as UAVs, USVs and UUVs. Such systems would offer unique capabilities and deliver elements of a wider MHPC programme.[35][36]

In May 2012 shortly after the Dstl release, the MOD published a 'Joint Concept Note' entitled "Future Black Swan-class Sloop-of-war". The MoD publication outlined the future maritime needs and challenges of the Royal Navy and focused on the potentiality of the Royal Navy returning to large numbers sloops as a solution. It proposes a class of around 40 sloops-of-war, displacing 3,150 tonnes, a length of 95 meters and a low unit price of £65 million.[37] The sloops would incorporate a modular design, including; a mission bay for UAVs, USVs and UUVs during mine countermeasures and hydrography tasks, a large flight deck capable of accommodating a Boeing CH-47 Chinook sized helicopter for disaster relief operations and external module stowage for the ability to add and remove various offensive and defensive weapons when needed. The external module stowage is described as facilitating 'Capability Packages' so that the sloop can be reconfigured for different roles when the need arises. Fixed weapons include a single 30 mm gun, two Miniguns and two GPMGs. For 'Sea Control' or 'war-fighting capability packages' the Black Swan class would be reconfigured with containerised missile modules for land attack, anti-ship and anti-air missiles in addition to the sloops' fixed weapons. A towed array sonar could also be fitted as well as directed energy weapons. The Black Swan class would have a core crew of 8 with additional crew added depending on the capability package. For example, in some configurations a crew of 40 would be required.[37]

DSTL is developing autonomous unmanned surface vehicles such as the 32 ft (9.8 m) Maritime Autonomy Surface Testbed (MAST)

The order for the River-class Batch 2 led to the "patrol" element being dropped from the requirement in 2013.[38] The Concept Phase established that most elements of the capability could be delivered by off-board systems from steel ships, but a low-signature hull has not yet been discounted.[38] The Project passed Initial Gate in July 2014 and is now in the early stages of its Assessment Phase, which will deliver three technology demonstrators.[38]

The 2015 SDSR specified that only 12 mine-counter measure vessels will exist in Joint Force 2025.[39] The three oldest Sandown-class minehunters will be decommissioned.[40] At one point it was anticipated that the UK and France would collaborate on a Maritime Mine Counter Measures project.[41] At DESI 2017, the First Sea Lord mentioned that the Royal Navy aimed to accelerate the incremental delivery of future mine countermeasures and hydrographic capability (MHC) programme.[42]

However, in 2020 the parliamentary National Audit Office (NAO) noted that no funding was allocated in the 2019 to 2029 period to replace the Navy's mine countermeasures capability. [1] This issue is likely to be addressed, one way or another, in the integrated foreign policy, security, defence and international development review anticipated to be carried out in 2020-21 or later. [3]

Gibraltar Squadron Ships

In July 2017 it was announced that the Gibraltar Squadron, responsible for the security of the territorial waters around the British Overseas Territory of Gibraltar, would receive two new warships which will be more "capable", "faster" and have "bigger guns", to replace their existing patrol vessels HMS Sabre and HMS Scimitar "within the next two years".[43] Commander British Forces Gibraltar, Commodore Timothy Henry, mentioned in an August 2019 interview that the process of acquiring is proceeding and expect a choice by the end of 2019.[44]In June 2020, pending the planned eventual procurement of new-build vessels, it was decided to replace the existing vessels with HMS Dasher and HMS Pursuer, a pair of Archer class patrol boats previously attached to the Cyprus Squadron. These were transported to Gibraltar by MOD chartered Ro-Ro vessel MV Hurst Point to serve as interim replacements for Sabre and Scimitar.[45]

Royal Fleet Auxiliary Ships

The Strategic Defence and Security Review 2015 confirmed that three new large Fleet Solid Support Ships would be acquired for the Royal Fleet Auxiliary, to replace the single-hulled RFA Fort Victoria, which entered service in 1994, and RFA Fort Rosalie and RFA Fort Austin (both dating from the late 1970s). The ships are expected to enter service in the mid 2020s.[46][47][48] The 2017 National Shipbuilding Strategy confirm this, noting that the Fleet Solid Support ships would be subjected to an international competition and be delivered by the mid-2020s.[49] However, late in 2019 this competition was stopped in the face of criticism that the competition permitted the potential construction of the ships outside the UK. The competition was anticipated as likely to be re-started with revised terms of reference. [50]

The SDSR did not mention any current plans to replace RFA Diligence which at the time was scheduled to go out of service in 2020 but was laid up and advertised for sale in 2016, or RFA Argus which will go out of service in 2024.[51] The decision may be taken before or during the next Defence Review in 2020. A parliamentary reply on 21 March 2016 noted that "The consideration of options to deliver the capabilities provided by RFA Diligence and RFA Argus remains ongoing".[52] An August 2016 notice stated that Diligence is placed up for sale,[53] and it was stated that the MOD is considering options for a replacement.[54] However, as of June 2020, no further progress had been reported.

Littoral Strike Ships

On 11 February 2019, Secretary of State for Defence Gavin Williamson stated the Royal Navy will purchase two commercial ships and develop them into Littoral Strike Ships. One will be based the Mediterranean, Atlantic and Baltic areas while the other, east of Suez in the Indo-Pacific. These ships will be used to deploy British Special Forces or Royal Marines.[55][56] A consultant firm, Prevail-Partners, has introduced a concept named as the Multi-role Vessel.[57] USNI News reported that the Amphibious Task Group would be renamed as the 'Littoral Strike Group'. It will consist of two Littoral Strike Units, each comprising up to three amphibious ships, chartered maritime ships with special forces and at the extreme, a Queen Elizabeth-class aircraft carrier with embarked F-35Bs.[58] In November 2019, it was reported that the Littoral Strike Ship idea was at an early concept stage with limited funds allocated to the project. [59]

Unmanned Surface Vessels

At the Defence and Security Equipment International 2019 exhibition, Secretary of State for Defence Ben Wallace unveiled the MAST-13, an unmanned surface vehicle that would be attached to a PAC24 rigid inflatable boat and protect surface ships. This is part of a Maritime Autonomy Surface Testbed (MAST) 13, a collaboration between DSTL and L3Harris.[60] HMS Argyll was involved in the demonstration.[61] On 24 June 2020, the Royal Navy announced that the first crew-less Pacific 24 boat has been launched.[62]

Other smaller non-combatant ships

On 9 August 2017, Defence Minister Harriett Baldwin announced the winner of Project Vahana, a £48 million contract for up to 38 (including HMS Magpie) modular glass-reinforced plastic hull workboats of between 11 and 18m long, which will support Royal Navy ships. Tasks to be carried out by the boats will include officer and diver training (8 & 7 boats respectively), hydrographic survey (3 boats), Antarctic exploration, explosive ordinance disposal and passenger transport (3 boats) for HMS Prince of Wales. In their role as passenger transport, the boats are capable of carrying up to 36 personnel to and from the aircraft carriers, especially where port facilities are too small to allow the carrier alongside, before being winched from the water using on-board lifting equipment and stowed inside. These boats will be built by Atlas Elektronik UK in Dorset and are scheduled to be in service by 2021.[63] Unusually, these workboats are not scheduled to be used as passenger transfer boats with HMS Queen Elizabeth as this role was taken by a previously announced contract for 4 such boats with Alnmaritec.[64]

On 15 December 2015, the Ministry of Defence awarded a £13.5m contract to BAE Systems for the production of 60 new Pacific 24 rigid-hulled inflatable boats for use with Royal Navy & Royal Fleet Auxiliary ships. The contract is expected to take 4 years to complete and began in early 2016.[65] Babcock was awarded a maintenance contract at DSEI 2019 for ARCHER-class patrol and training vessels, rigid-inflatable boats (RIB), yachts, static training vessels, small cadet boats and police boats.[66]

Submarines

Astute-class nuclear attack submarine

HMS Astute enters Faslane Naval Base

In 1997 the MOD signed a contract with GEC-Marconi (now BAE Systems Submarine Solutions) to deliver a new class of seven nuclear powered attack submarines to the Royal Navy. This class was intended to replace the five boats of the ageing Swiftsure class, as well as the oldest two boats of the Trafalgar class. The first-in-class HMS Astute was laid down in January 2001 and commissioned into the fleet in August 2010, followed by her sisters HMS Ambush (2013) HMS Artful (2016) and "Audacious" (2020). As of April 2020, four of the boats have been commissioned and three are under construction. The entry into service of the seventh boat is planned for 2026.[8] The Astute class are much larger than their predecessors and have greatly improved stealth, endurance and weapons load. Each submarine is capable of carrying up to 38 Tomahawk Land Attack Cruise Missiles and Spearfish heavyweight torpedoes. There is also a plan for a Maritime Underwater Future Capability (MUFC), that is, a successor to the Astute-class SSN.[67]

Dreadnought-class nuclear ballistic missile submarine

In July 2016 it was confirmed that a new class of submarine would be built retaining the United Kingdom's nuclear deterrent by replacing the current fleet of 4 Vanguard-class ballistic missile submarines (SSBN).[68]On 18 July 2016 the House of Commons voted 472 for and 117 against to proceed to build the new submarines.[69] On 21 October 2016, the MoD announced that the first of the four planned boats would be named HMS Dreadnought, with the name also attached to the class.[70] On 25 April 2017, junior minister Harriet Baldwin confirmed that Dreadnought was under construction.[71] On 6 December 2018, the second boat of this class was named by the Secretary of State for Defence as HMS Valiant.[72] The final two boats of the class have been named HM Submarines Warspite and King George VI.

Aircraft

Fixed-wing aircraft

F-35 Lightning II

The aircraft carrier's major instrument of power projection is the carrier air group. The larger the air group, the more tasks it can perform. The Invincible class, because of its small size, had only a limited capacity, and was only capable of operating STOVL aircraft, the Harrier GR7/GR9. In 2006 the Sea Harrier was withdrawn from service. This saw the front line Sea Harrier squadron of the Fleet Air Arm converting to the Harrier GR9, as part of the evolution of the Joint Force Harrier concept. The Harrier's replacement in both the RAF and the FAA is the F-35 Lightning II Joint Combat Aircraft. The F-35 is a significant improvement over the Harrier, in terms of speed, range and weapon load. The UK had plans to order 138 F-35Bs for the Royal Navy and Royal Air Force. The financial crisis led to the decision taken in the Strategic Defence and Security Review 2010 to immediately withdraw the Harrier GR9 force in late 2010 along with HMS Ark Royal, to reduce the total number of F-35s planned for purchase by the UK, and to purchase the F-35C CATOBAR version rather than the STOVL F-35B. By May 2012, the government had decided to purchase the short-take off version, the F-35B instead.[73] In July 2012, the Secretary of State for Defence stated that an initial 48 F-35Bs will be purchased to equip the carrier fleet.[74] In September 2013, it was announced that the second JSF squadron would be the Fleet Air Arm's 809 NAS.[75] Chancellor George Osborne announced on 22 November 2015 that the UK will have 24 F-35Bs on its two new carriers by 2023.[76] The Strategic Defence and Security Review 2015 also confirmed that the United Kingdom will buy 138 F-35s over the life of the program. On 20 May 2016, it was reported that the UK would field four frontline squadrons as part of its Lightning Force, including 809 NAS and 617 Squadron, plus an RAF-numbered Operational Conversion Unit (later 207 Sqn) and 17(R) Squadron as the Operational Evaluation Squadron.[77] The UK is committed to improving its F-35Bs to Block 4 standard, however, the actual number of improved jets is yet to be known.[78][79] 809 NAS will stand up in April 2023.[80]

Helicopters

Merlin HM2's operating on HMS Illustrious

The 2010 Strategic Defence and Security Review saw the Fleet Air Arm operate two types of helicopter replace the RN’s aging fleet —the AW101 Merlin and the AW159 Wildcat.[81] In the carriers and frigates, the larger Merlin anti-submarine warfare helicopter is used. There are 30 Merlin HM2 helicopters in service.[82] In late 2009 the Fleet Air Arm retired its remaining Sea King HC4 helicopters, their place being taken by Merlins upgraded and transferred from the Royal Air Force (RAF).[83]

The future AEW capability of the FAA is the "Crowsnest" programme, which will replace the former Sea King ASaC7 fleet which retired in September 2018. Current plans will see Crowsnest achieve initial operating capability in September 2021. Full operating capability is expected in May 2023.[84]The original six year capability-gap between the retirement of the Sea King ASaC7 fleet and the entry service of Crowsnest was the source of much criticism.[85] A PAC report had revealed the Main Gate decision for the Crowsnest to be around 2017.[86] Crowsnest is now scheduled to be initially operational by late 2021. As a result of the time gap between the planned out of service date of the Sea King, and the introduction of "Crowsnest", seven Sea King ASaC.7 helicopters were extended in service until September 2018.[87][82] Thales was selected as the chosen bidder to provide the radar and mission system at the heart of the Crowsnest capability on 22 May 2015. They will provide a slightly upgraded version of the existing Searchwater 2000 radar.[88] All 30 of the Royal Navy's HM2 Merlins will be equipped to carry the Crowsnest system, though a maximum of 10 could be fitted with it at any one time.[82]

Remote Piloted Air Systems

The RN has been slower to adopt unmanned systems than some other navies; following trials with the rail-launched ScanEagles it started operational flights of leased ScanEagles in January 2014 watching for swarm attacks on HMS Somerset and RFA Cardigan Bay in the Persian Gulf.[89] This was expanded in November 2014, when 700X NAS was formed to serve as both the parent unit for ship based ScanEagle flights, and as the evaluation unit for any future RPAS systems that the Royal Navy elects to try.[90] The ScanEagle will be withdrawn by 2017 and likely to be replaced by an unknown UAS, chosen through the Unmanned Warrior exercise in 2016.[91]

Dstl are testing ISR packages compatible with the RQ-20A Puma hand-launched UAV on board the M80 Stiletto US special forces trials ship in November 2014 under Capability Demonstration 15-1.[92] The optionally-manned PZL-Świdnik SW-4 Solo completed trials with the RN in 2015 as part of the UK's RWUAS (Rotary Wing Unmanned Air System) Capability Concept Demonstrator (CCD) programme.[93][94] The Royal Navy has also utilised 3-D printed unmanned aircraft in its operations.[95][96]

The Royal Navy has planned for two future UAS: The Flexible Deployable UAS (FDUAS) and Joint Mini UAS (JMUAS) programs. FDUAS is seen as a "Sea Eagle (Scan Eagle) Plus" while JMUAS is a UAS for the Royal Marines.[97] In November 2019, 700 NAS tested two new UAS, namely, the AeroVironment RQ-20 Puma and the AeroVironment Wasp III.[98]

Royal Marines

The Royal Marines will be restructured for the future, with 200 driver and administrative staff posts removed and reallocated to Royal Navy personnel. 42 Commando will be transformed into a specialised "Maritime Operations unit" so that roles from that unit such as heavy weapons specialists, can be reallocated across the Royal Navy.[99] This organisational change for 42 Commando was completed in May 2018.[100] The Royal Marines stood up an office programme titled, 'Future Commando Force', aiming to give staff and intellectual horsepower to change the Royal Marines to meet the threats of the future.[101] There will be two Littoral Response Groups: One based East of Suez, one based in the High North.[102]

Weapons

A dummy Sea Venom anti-ship missile on board HMS Prince of Wales (R09).
  • Sea Ceptor (formerly CAMM(M) or FLAADS) is a short-range air-defence missile to replace Sea Wolf on Type 23 frigates from 2016.[103]
  • Sea Viper, used by the Type 45 destroyers, has undergone trials using its SAMPSON radar to track ballistic missiles, and work is ongoing to develop its Aster missiles to counter ballistic missiles.[104] The UK is also considering upgrading its Type 45 Destroyers with the Aster 30 Block 1NT missile.[41]
  • Martlet (formerly FASGW (Light) and the Lightweight Multirole Missile) is a short range, supersonic anti-ship missile for use against small surface warships, patrol vessels and craft. Martlet is due to enter initial service in 2021 on the Fleet Air Arm's Lynx Wildcat maritime helicopters. Full operating capability is expected in 2024. [105][106]
  • Sea Venom (formerly FASGW (Heavy)), a bigger anti-shipping missile launched from helicopters, to begin to replace Sea Skua from 2022.[107][108][109][110][111] (Sea Skua itself was withdrawn from service in 2017). [112] Full operating capability for Sea Venom expected in 2024.[106]
  • The SPEAR 3 missile is a multi-role networked anti-ship and land-attack missile based on the Brimstone anti-tank missile with the JSOW-ER turbojet to extend the range to over 120 km. Four Spear 3 can fit in two internal weapons bay of an F-35B, MBDA are also looking at ship launch for members of the Brimstone family, including a quick-firing, anti-swarm 'Sea Spear'.[113][114]
  • The FC/ASW (Future Cruise/Anti Ship Weapon)[115] is a future anti-ship cruise missile planned for the Royal Navy and the French Navy. MBDA has presented Perseus, a supersonic multi-role cruise missile concept study[116] which was unveiled at the Paris 2011 Air Show. In the 2016 UK-France Security Summit, the two parties pledged to work on a "joint concept phase for the Future Cruise/Anti-Ship Weapon (FC/ASW) programme to identify solutions for replacement of the Scalp/Storm Shadow missiles, for both countries, Harpoon for the UK and Exocet for France."
  • A prior information notice (PIN) for contracts was announced on 5 March 2019 for a Next Generation Interim Surface Ship Guided Weapon (I-SSGW), that is, an anti-ship missile to replace the Royal Navy's Harpoon Block 1C missiles. The possible candidates for replace are the Harpoon Block II+, LRASM, Naval Strike Missile, RBS15 Mk4, Exocet Block 3C, Gabriel V missile, C-star, Type 90 Ship-to-Ship Missile or Hsiung Feng III.[117][118] A contract notice was issued on 22 August 2019 for an "Interim Surface to Surface Guided Weapon System (I-SSGW)", requesting for an over-the-horizon anti ship capability and a terrain-following precision land attack capability. The land attack requirement is likely to disqualify the Harpoon, Exocet and C-Star from the competition.[119][120]
  • The British Government announced on 5 January 2017 that it had awarded a £30 million contract to UK consortium 'Dragonfire' to develop a directed energy weapon technology demonstrator. Their intention is to have a working prototype ready by the end of the decade and potentially have vessels equipped with directed energy weapons by the mid 2020s.[121]
  • In July 2019, the UK issued a Prior Information Notice for Directed Energy Weapon (DEW) demonstrators.[122] This differs from the above Dragonfire as it combines multiple laser beams to produce a weapon more powerful than its predecessors and resistant to the most challenging environmental conditions.[123]
  • In January 2016, it was announced that a £44m Navigation Radar Programme would see "more than 60 Royal Navy ships, submarines and shore facilities" fitted with state-of-the-art navigation radars, with contracts awarded to Lockheed Martin Integrated Systems UK and Kelvin Hughes.[124]
  • The MoD is reportedly investing heavily in development of quantum compasses which could potentially transcend the need for GPS as a means of navigation, providing a self-contained and interference-proof alternative.[125] Deployment of this technology is often discussed with regard to the Royal Navy's submarine fleet, allowing vessels to navigate without outside assistance and therefore remain submerged for extended lengths of time.[126]
  • In December 2018, it was announced that a £23m agreement to provide Royal Navy and Royal Fleet Auxiliary ships with new radios had been signed. The radios will be installed on 39 ships in total, including 13 Type 23 Frigates, 4 survey and ice patrol vessels, 13 minehunters and 9 RFA supply ships and will be used to communicate with other ships, ports and aircraft during operations. They will replace numerous older radios and as more modern pieces of equipment, they are easy to use and can be updated via software and operated remotely. Under the contract, Thales will develop, fit and support a V/UHF radio solution which includes the acquisition of around 300 Rohde & Schwarz radios. The first radio will enter service on a Type 23 Frigate in 2020, with all radios due to be delivered and installed by the end of 2023.[127]

Senior Personnel changes

The Sunday Times reported that First Sea Lord Admiral Tony Radakin was considering reducing the number of Rear-Admirals at Navy Command by five.[128] The fighting arms excluding Commandant General Royal Marines would be reduced to 1-star or Commodore rank and the surface flotillas would be combined together.[129] Training would be concentrated under the Fleet Commander.[130] For example, Flag Officer Sea Training will be reduced from a Rear-Admiral position to a Commodore position and be re titled as 'Commander Fleet Operational Sea Training'.[131]

See also

References

  1. https://www.nao.org.uk/wp-content/uploads/2020/02/The-Equipment-Plan-2019-to-2029.pdf
  2. "PM outlines new review to define Britain's place in the world". GOV.UK. 26 February 2020. Retrieved 12 May 2020.
  3. June 12, 2012 (18 March 2020). "Mostly business as usual for the Royal Navy in the face of COVID-19 crisis". Save the Royal Navy. Retrieved 12 May 2020.
  4. "Royal Navy's final OPV named HMS Spey". ADS Advance. 7 October 2019. Retrieved 7 October 2019.
  5. "Royal Navy's new Offshore Patrol Vessel named HMS Spey - Defence Equipment & Support". Des.mod.uk. Retrieved 15 May 2020.
  6. "Ministry of Defence Astute Class Submarines". parliament.uk. UK Hansard. 29 April 2020. Retrieved 13 May 2020. HMS AUDACIOUS was commissioned into the Royal Navy on 3 April 2020
  7. "Ministry of Defence HMS Audacious". 15 February 2020. Retrieved 13 May 2020.
  8. a few days (6 February 2020). "HMS Audacious: 6 Feb 2020: Hansard Written Answers". TheyWorkForYou. Retrieved 12 May 2020.
  9. June 12, 2012 (8 February 2020). "Only seven years to wait until the Royal Navy gets a new frigate". Save the Royal Navy. Retrieved 12 May 2020.
  10. June 12, 2012 (12 June 2012). "Tag Type 31 Frigate". Save the Royal Navy. Retrieved 12 May 2020.
  11. Thomas, Richard (22 January 2020). "Fleet escort cuts impending as UK's frigate maths fails to add up - Naval Warfare". Shephard Media. Retrieved 12 May 2020.
  12. "UK looks to outline requirement for new General Purpose Frigate". IHS Janes'. 20 April 2016. Retrieved 20 April 2016.
  13. Chuter, Andrew (12 February 2016). "New Royal Navy general purpose frigate to be known as Type 31". DefenseNews. Retrieved 18 March 2016.
  14. "National Security Strategy and Strategic Defence and Security Review 2015: A Secure and Prosperous United Kingdom" (PDF). Government of the United Kingdom. November 2015. Retrieved 18 March 2016.
  15. Maritime, The (17 February 2020). "Royal Navy's Surface Combatant Fleet Set to Decline to 15 Vessels". Maritime-executive.com. Retrieved 12 May 2020.
  16. "BAE unveils General Purpose Frigate concepts". IHS Janes. Retrieved 15 July 2016.
  17. "First of Royal Navy's new frigates named HMS Glasgow". STV News. STV. 20 July 2017. Retrieved 20 July 2017.
  18. "Ambitious future for Naval Shipbuilding in the UK". gov.uk. gov.uk. 6 September 2017. Retrieved 6 September 2017.
  19. "Type 31e Frigate build programme pause 'Body Blow for Shipbuilding' say union". UK Defence Journal. 25 July 2018. Retrieved 26 July 2018.
  20. "Type 31e Frigate programme to be restarted". UK Defence Journal. 26 July 2018. Retrieved 26 July 2018.
  21. "Type 31e Frigate". Hansard. UK Parliament. 10 December 2018.
  22. Tovey, Alan (24 August 2019). "Babcock set to build new cut-price frigates and weaken BAE shipbuilding monopoly". Daily Telegraph. London. Retrieved 27 August 2019.
  23. "Design of new Type 31 frigates selected". Royal Navy. London. 12 September 2019. Retrieved 14 September 2019.
  24. "New offshore patrol vessels for Royal Navy". Ministry of Defence. 6 November 2013. Retrieved 6 November 2013.
  25. "Oral evidence: Naval Procurement: Type 26 and Type 45 HC 221". UK House of Commons Defence Select Committee. 21 July 2016. Retrieved 21 July 2016.
  26. "BAE Systems wins £348 million contract for new UK patrol ships". Reuters. 12 August 2014. Retrieved 18 March 2016.
  27. "First steel cut on new patrol ships". Government of the United Kingdom. 10 October 2014. Retrieved 18 March 2016.
  28. "The Forth will be with us in 2017 as work starts on first of three new patrol ships". Navy News. Royal Navy. 10 October 2014. Retrieved 18 March 2016.
  29. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/478933/52309_Cm_9161_NSS_SD_Review_web_only.pdf
  30. "The Forth is with us – the first of five new patrol ships is named on the Clyde". Royal Navy. 9 March 2017. Retrieved 25 November 2018.
  31. "UK To Retain Three Patrol Ships For UK Waters After Brexit". Forces.net. 22 November 2018. Retrieved 25 November 2018.
  32. Strategic Defence and Security Review Archived 22 December 2010 at the Wayback Machine, October 2010
  33. Future of the Royal Navy - MCM and Survey, thinkdefence.co.uk, Retrieved December 2010
  34. BAE Systems and SeeByte Sign Co operation Agreement to Develop Solutions for Autonomous Maritime Operation, seebyte.com, Retrieved June 2011
  35. Ministry of Defence Centre for Defence Enterprise (26 January 2012). "Remote Mine Countermeasures & Hydrography" (PDF). Defence Science and Technology Laboratory. p. 12.
  36. "Unmanned Underwater Vehicles: 18 Dec 2012: Hansard Written Answers – TheyWorkForYou".
  37. Future Black Swan-class Sloop-of-war: A Group System (MoD Concept Note), gov.uk, Retrieved 2012
  38. "Release of Information" (PDF). 29 January 2015.
  39. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/478933/52309_Cm_9161_NSS_SD_Review_web_only.pdf page 28
  40. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/492800/20150118-SDSR_Factsheets_1_to_17_ver_13.pdf
  41. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/505177/UKFRS_security_and_defence_final_2_March.pdf
  42. "DSEI 2017 naval technology zone". 12 September 2017.
  43. "Gibraltar Squadron to receive two new warships". GBC.
  44. "CBF says he expects parity arrangements to benefit local employees in time". Gibraltar Hour. Gibraltar. 14 August 2019. Retrieved 11 September 2019.
  45. "Patrol boats for the Royal Navy Gibraltar Squadron". Save the Royal Navy. 19 June 2020. Retrieved 19 June 2020.
  46. "National Security Strategy and Strategic Defence and Security Review 2015" (PDF). Government of the United Kingdom. p. 29. Retrieved 4 March 2016.
  47. "Defence: Procurement:Written question – 17722".
  48. "Royal Fleet Auxiliary:Written question – 17447".
  49. "National Shipbuilding Strategy" (PDF). Ministry of Defence.
  50. Lye, Harry (6 November 2019). "UK MOD puts brakes on Fleet Solid Support ship tenders". Naval-technology.com. Retrieved 12 May 2020.
  51. "Ministry of Defence -Release of Information" (PDF). Government of the United Kingdom. Retrieved 29 July 2016.
  52. "Royal Fleet Auxiliary:Written question – 31836".
  53. "Notice of sale: former RFA Diligence a forward repair ship". UK Ministry of Defence.
  54. "UK loses operational maintenance and repair capability as Diligence is retired early". IHS Janes. 11 August 2016.
  55. "UK to purchase motherships for Special Forces and Marine commandos". NavyRecognition. 11 February 2019.
  56. "Defence in Global Britain". UK Ministry of Defence. 11 February 2019.
  57. "Multi-Role Vessel MRV". prevail-partners.com. Prevail Partners. 11 September 2019. Retrieved 11 September 2019.
  58. Rosamond, Jon (11 September 2019). "DSEI: Royal Marines Embrace Littoral Strike and Prepare to Forward Deploy". USNI News. London. Retrieved 15 September 2019.
  59. Lye, Harry (7 November 2019). "Royal Navy limits commitment to Littoral Strike Ship development". Naval-technology.com. Retrieved 12 May 2020.
  60. "Next generation unmanned system unveiled at DSEi". Ministry of Defence UK. London. 10 September 2019. Retrieved 11 September 2019.
  61. "HMS Argyll involved with autonomous tech trials". Royal Navy. London. 11 September 2019. Retrieved 11 September 2019.
  62. "ROYAL NAVY LAUNCHES 'SMART BOAT' FOR FLEET OF TOMORROW". Royal Navy. 24 June 2020. Retrieved 26 June 2020.
  63. "New £48m contract for workboat fleet will support UK carriers and UK jobs, Defence Minister announces". UK Ministry of Defence. 9 August 2017.
  64. "ALN 139 'PTB Buccaneer - HMS Queen Elizabeth Carrier'". UK Ministry of Defence. 31 January 2017.
  65. "Next generation of RIBS for Royal Navy". Royal Navy. 15 December 2015.
  66. "DSEI 2019: BABCOCK WINS UK SMALL BOAT MAINTENANCE CONTRACT". Monch News Channel. London. 10 September 2019. Retrieved 14 September 2019.
  67. "Submarine Delivery Agency Corporate Plan 2018–2019" (PDF). Submarine Delivery Agency. 1 April 2018. Retrieved 2 May 2019.
  68. "Q&A: Trident replacement". BBC News. 11 November 2006. Retrieved 1 December 2006.
  69. "UK's Nuclear Deterrent". UK Hansard. 18 July 2016. Retrieved 20 July 2016.
  70. "New nuclear submarine given famous naval name". BBC News. 21 October 2016. Retrieved 21 October 2016.
  71. "Warships: Shipbuilding – Ministry of Defence written question – answered on 25th April 2017". Hansard. 25 April 2017. Retrieved 2 May 2017.
  72. "Defence Secretary announces £400m investment for nuclear-armed submarines". gov.uk. Retrieved 6 December 2018.
  73. Government forced into U-turn on Royal Navy fighter jets, guardian.co.uk, 10 May 2012
  74. Hewson, Robert. "UK slashes F-35B numbers but might look to split buy with F-35As." IHS Janes, 27 July 2012.
  75. 'Immortal’ air squadron to fly Royal Navy’s newest jets, royalnavy.mod.uk, 09/09/2013
  76. http://news.bbc.co.uk/2/shared/bsp/hi/pdfs/22111502.pdf
  77. "UK Planning four front-line F-35 Squadrons". Aviationweek. 20 May 2016.
  78. "Ministry of Defence Joint Strike Fighter Aircraft". Hansard Ministry of Defence Written Questions and Answers. UK Hansard. Retrieved 26 June 2020. The F-35 Block 4 upgrade has been included in the UK F-35 programme budget since its inception. Decisions on the number of aircraft to be upgraded will be made on the basis of military capability requirements.
  79. Trevithick, Joseph (24 June 2020). "British Government Says It Might Pass On $27M Upgrade For Some Of Its F-35s". The Warzone. Retrieved 26 June 2020.
  80. Stevenson, Beth (20 May 2016). "UK F-35 commander highlights training challenge". Flight Global.
  81. Securing Britain in an Age of Uncertainty: The Strategic Defence and Security Review Archived 27 September 2012 at the Wayback Machine, gov.uk, October 2010
  82. June 12, 2012 (11 April 2019). "Maiden flight for Crowsnest – the Royal Navy's eye in the sky". Save the Royal Navy. Retrieved 12 May 2020.
  83. Merlin Modernisation Road Map Advances, aviationweek.com, 18/01/2011
  84. https://www.nao.org.uk/wp-content/uploads/2020/06/007678-001-Carrier-Strike-preparing-for-deployment.pdf
  85. National Audit Office - CVF report, nao.org.uk
  86. House of Commons Hansard written answers, publications.parliament.uk, 29 May 2013
  87. "New surveillance system for future Royal Navy aircraft carriers revealed – News stories – GOV.UK".
  88. Hoyle, Craig (16 January 2014). "Royal Navy ready to launch ScanEagle operations". Flight International.
  89. "X-men take to the Cornish skies". Royal Navy. 25 November 2014. Retrieved 25 November 2014.
  90. "Royal Navy will use Unmanned Warrior to assess ScanEagle replacement". Flightglobal.com. Flightglobal. 11 August 2016. Retrieved 11 August 2016.
  91. Scott, Richard (26 October 2014). "Dstl plans unmanned ISR payload demonstration from Stiletto". IHS Jane's Defence Weekly.
  92. "DSEI: AgustaWestland reveals results of Royal Navy RWUAS trials". 15 September 2015.
  93. "PZL-Świdnik exhibits technology of the future at MSPO 2014 with the SW-4 Solo RUAS/OPH". PZL-Świdnik. 1 September 2014.
  94. "Royal Navy uses pilotless aircraft to navigate through ice- Royal Navy".
  95. "Southampton engineers test fly printed aircraft off Royal Navy ship – University of Southampton".
  96. "Royal Navy Seeks Funds for Two Unmanned Air Systems".
  97. "700X begins test of remote piloted aircraft". Royal Navy. 5 November 2019. Retrieved 1 January 2020.
  98. "Royal Marines to be restructured in line with growing Royal Navy". UK MOD.
  99. Royal Navy (17 May 2018). "Bickleigh marines mark their new role with parade and fun day". Royal Navy. Retrieved 12 February 2019.
  100. Ripley, Tim (12 June 2019). "UK Royal Marines stand up programme office to lead Future Commando Force". IHS Janes. London. Retrieved 10 July 2019.
  101. Nicholls, Dominic (26 June 2020). "UK's Future Commando Force: a radical and 'lethal' new unit to fight threats across the globe". Daily Telegraph. Retrieved 27 June 2020.
  102. "Press Information – CAMM" (PDF). MBDA Systems. June 2011. Archived from the original (PDF) on 11 August 2011. Retrieved 16 October 2011.
  103. Tran, Pierre (12 May 2013). "MBDA Positioned to Score Big in 3 Deals". Defense News.
  104. https://www.savetheroyalnavy.org/the-martlet-missile-wildcat-helicopter-gets-its-claws/
  105. June 12, 2012 (4 February 2019). "In focus: the Wildcat multi role helicopter in service with the Royal Navy". Save the Royal Navy. Retrieved 12 May 2020.
  106. https://www.savetheroyalnavy.org/the-martlet-missile-wildcat-helicopter-gets-its-claws/
  107. MBDA TO DEVELOP FASGW(H)/ANL, NEXT GENERATION ANGLO-FRENCH ANTI-SHIP MISSILE.Archived 30 March 2014 at the Wayback Machine, mbda-systems.com, 27/03/2014
  108. Multi-million-pound investment in Royal Navy missiles, gov.uk, 27 March 2014
  109. Richard Scott (17 December 2018). "Sea Venom/ANL missile service entry faces year-long delay". IHS Janes. Retrieved 18 December 2018.
  110. Richard Scott, London - IHS Jane's Missiles & Rockets (1 March 2017). "RN completes last Sea Skua high seas firing | IHS Jane's 360". Web.archive.org. Archived from the original on 12 March 2017. Retrieved 12 May 2020.CS1 maint: multiple names: authors list (link)
  111. "U.K. Advances Air-Launched Weapons Initiative".
  112. "BRIMSTONE SEA SPEAR – MBDA". www.mbda-systems.com.
  113. "UK AND FRANCE CONFIRM FC/ASW CONCEPTION PHASE STARTING IN MARCH 2017". MBDA.
  114. "13th Report – Future Anti-Ship Missile Systems: Joint inquiry with the Assemblée nationale's Standing Committee on National Defence and the Armed Forces" (PDF). UK House of Commons Defence Select Committee. 12 December 2018. Retrieved 13 December 2018.
  115. Ministry of Defence, Weapons, Torpedoes, Tomahawk and Harpoon Project Team (5 March 2019). "United Kingdom-Bristol: Anti-ship missiles". ted.europa.eu. Retrieved 12 March 2019.CS1 maint: multiple names: authors list (link)
  116. Xavier Vavasseur (8 March 2019). "UK MoD Issues Notice for Interim SSGW Anti-Ship Missiles". Naval News. Retrieved 12 March 2019.
  117. Ministry of Defence, Weapons, Torpedoes, Tomahawk and Harpoon Project Team (22 August 2019). "United Kingdom-Bristol: Missiles 2019/S 161-397419 Contract notice Supplies". Ted - tenders electronic daily: Supplement to the Official Journal of the EU. ted.europa.eu. Retrieved 22 August 2019.CS1 maint: multiple names: authors list (link)
  118. Xavier Vavasseur and Nathan Gain (22 August 2019). "UK MoD Further Details Interim Anti-Ship Missile Need Through Contract Notice". Naval News. Retrieved 22 August 2019.
  119. "Whitehall invests £30m in laser weapon to protect ships from attack by air and sea". 6 January 2017.
  120. "MOD to develop cutting-edge laser and radio frequency weapons". 9 July 2019.
  121. "MOD £130m investment into lasers". 10 July 2010.
  122. "New navigation radar system for Royal Navy – GOV.UK". www.gov.uk.
  123. "Subscribe to read". Financial Times.
  124. "Quantum technology to help submarines find their way – The Engineer The Engineer". www.theengineer.co.uk.
  125. Allison, George (6 December 2018). "New radios ordered for Royal Navy and RFA ships".
  126. Ripley, Tim (22 December 2019). "Admirals thrown to sharks as 'top-heavy' navy tries to cut costs". The Sunday Times. Retrieved 25 December 2019.
  127. "Royal Navy To Cut Back On Senior Personnel". Forces News. 23 December 2019. Retrieved 25 December 2019.
  128. @RoyalNavy (22 December 2019). "The First Sea Lord @AdmTonyRadakin gives his end of year address to the sailors, marines and civilians of the Naval Service, reviewing how much the @RoyalNavy has achieved in #2019 and looking ahead to ensure the RN can meet the challenges of the future" (Tweet) via Twitter.
  129. "Who is the new Flag Officer Sea Training" (PDF). whatdotheyknow.com. Whatdotheyknow. 27 April 2020. Retrieved 28 April 2020. In response to your request, I can advise you that the title Flag Officer Sea Training will cease to exist on 1 May 2020 and is replaced by the 1* post of Commander Fleet Operational Sea Training
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.