Eureka Mountain Mine Ride

Eureka Mountain Mine Ride was a Wild Mouse steel roller coaster located at Dreamworld in Gold Coast, Australia.[1] After closing for maintenance in 2006, the ride remained inactive for 11 years. Following a third party assessment in December 2017, the decision was made by management for the ride not to reopen again due to the deteriorated state of the track. The remainder of the structure and ride was subsequently demolished within the same month.

Eureka Mountain Mine Ride
Previously known as Los
The Eureka Mountain Mine Ride building.
Dreamworld
LocationDreamworld
Park sectionGold Rush Country
Coordinates27°51′45.5″S 153°18′57″E
StatusRemoved
Opening date11 December 1986 (1986-12-11)
Closing date7 November 2006 (2006-11-07)
General statistics
TypeSteel Wild Mouse – Enclosed
ManufacturerHyFab
Lift/launch systemChain lift hill
Inversions0
Duration1:10
TrainsMultiple trains with a single car. Riders are arranged 2 across in 2 rows for a total of 4 riders per train.
RestraintsSeat belt
Eureka Mountain Mine Ride at RCDB
Pictures of Eureka Mountain Mine Ride at RCDB

History

The Eureka Mountain Mine Ride opened on 11 December 1986 alongside the Thunder River Rapids Ride as part of Dreamworld new land, Gold Rush Country.[2]

On 7 November 2006, the Eureka Mountain Mine Ride closed for maintenance.[3] At the time Dreamworld stated that the ride would be closed temporarily to ensure the safety of all guests.[4] In 2010, Dreamworld stated that the closure of the ride "basically came down to new ride technology, upgraded safety regulations and responding to what the public wanted. Like the old Thunderbolt Rollercoaster, the mine ride served us well for 25 years and was "retired..." to make way for newer computerised attractions like The Claw, The Motorcoaster and AVPX. In Summary - rides have a life span - like a car - it comes to a time when you need to spend a lot of $$ to fix it up so when it is no longer a very popular attraction sometimes it is better to invest in something newer...... ".[5] The ride itself remains standing to this day[1] with the queue and entrance transformed to house a couple of carnival-style games.

In late 2017 Dreamworld begun demolishing the mountain which encloses the ride, while preserving the track for a potential reopening of the ride.[6]

In December 2017 following careful assessment of the existing ride track by a third party, a Dreamworld spokesperson confirmed that the ride would not be reopened.[7] The remainder of the track was subsequently demolished within the same month.[8]

Ride

Eureka Mountain Mine Ride was manufactured by Brisbane-based company, HyFab. The ride was a Wild Mouse roller coaster enclosed in Eureka Mountain.[1] The ride would begin with guests entering the Eureka Mountain Mine and boarding one of several 4-seater cars.[1][4][9] After being pulled up a chain lift hill, guests would be confronted by an animatronic miner who would light a stick of dynamite. After it explodes, the car would take guests through a variety of sharp, hairpin turns and fast, steep drops.[10]

Eureka Mountain Mine Ride originally featured dual stations which allowed two cars to load and unload at the same time. In 2002, the practice of using these two stations was discontinued.[10] In 2004, the ride system was upgraded.[10]

Potential Reopening

Speculation began in early 2015 about the ride's potential reopening.[11] In the previous year, Dreamworld underwent a restoration on the Wipeout and Ocean Parade, as well as repainting The Claw. Some speculated that Eureka Mountain may feature as part of Dreamworld's restoration. Furthermore, water-dummies have been seen in the ride's entrance, and carts have been successfully cycled through the ride. On 10 February 2015, Dreamworld posted on their Facebook page "There is no official % on if this ride can be reopened or what else it could become. It is not off the table but certainly not on the table where we can be putting time frames or percentages on it. Everyone wants it back, and if it is possible there is a chance that one day that could happen."

In late 2017 Dreamworld decided to demolish the mountains exterior and leave the rides system to work out whether they can reuse the ride in the near future. Unfortunately it was later announced that the ride will not be returning and the remainder of the track has subsequently been demolished.

See also

References

  1. Marden, Duane. "Eureka Mountain Mine Ride  (Dreamworld)". Roller Coaster DataBase. Retrieved 26 September 2011.
  2. "Dreamworld History" (PDF). Dreamworld. 2009. Archived from the original (PDF) on 30 December 2010. Retrieved 26 September 2011.
  3. "Ride and Attraction Maintenance". Dreamworld. 2006. Archived from the original on 16 December 2006. Retrieved 26 September 2011.
  4. "Dreamworld - Family Rides". Dreamworld. 2006. Archived from the original on 15 December 2006. Retrieved 26 September 2011.
  5. Dreamworld (23 January 2010). "Basic FAQ about Dreamworld's Rides". Facebook. Retrieved 26 September 2011.
  6. https://www.parkz.com.au/update/2017/11/03/558-Dreamworld_sits_in_a_state_of_limbo_following_its_toughest_year_ever.html
  7. https://www.parkz.com.au/article/2017/12/07/573-Dreamworlds_Eureka_Mountain_Mine_Ride_will_not_be_reopening.html
  8. https://m.facebook.com/story.php?story_fbid=2282873311939372&id=1908665459360161
  9. "Dreamworld - Eureka Mine Ride". Dreamworld. Archived from the original on 19 June 2005. Retrieved 26 September 2011.
  10. "Eureka Mountain Mine Ride (Dreamworld)". Parkz. Retrieved 26 September 2011.
  11. Richard Wilson (9 February 2015). "Dreamworld's Eureka Mountain set for potential comeback". Parkz. Retrieved 6 July 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.