Cleator Moor West railway station

Cleator Moor West railway station was opened as "Cleator Moor" by the Cleator and Workington Junction Railway (C&WJR) in 1879. It served the growing industrial town of Cleator Moor, Cumbria, England.[4][5]

Cleator Moor West
Location
PlaceCleator Moor
AreaCopeland
Coordinates54.5249°N 3.5326°W / 54.5249; -3.5326
Grid referenceNY009154
Operations
Original companyCleator and Workington Junction Railway
Post-groupingLondon, Midland and Scottish Railway
Platforms2[1]
History
1 October 1879Opened as "Cleator Moor"
2 June 1924Renamed "Cleator Moor West"
13 April 1931Closed[2]
16 September 1963.Line through the station closed[3]
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z

Cleator Moor had three passenger stations:

  • The original 1857 Cleator Moor station which became a goods station when it was replaced in 1866
  • Its 1866 replacement which went on to be known as Cleator Moor East, and
  • The rival 1879 station which went on to be known as Cleator Moor West.

This article is about Cleator Moor West.

1904 railway junctions around Cleator Moor, Parton, Rowrah & Whitehaven
Near site of Cleator Moor West station, 1986

History

The line was one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, being specifically borne as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways.[6] The station was on the company's main line from Moor Row to Workington Central. Both line and station opened to passengers on 1 October 1879.

The station was renamed "Cleator Moor West" on 2 June 1924 to avoid confusion with its neighbour on the former Whitehaven, Cleator and Egremont Railway line to Rowrah, which was renamed "Cleator Moor East".

All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the new line to Workington, which earned the local name "The Track of the Ironmasters". General goods and passenger services were provided, but were very small beer compared with mineral traffic.[7]

The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts.[8]

Services

Passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines[9][10] referred to as "...rolling ruins..." by one author after a footplate ride in 1949.[11]

No Sunday passenger service was ever provided on the line.

The initial passenger service in 1879 consisted of

In 1880 the extension northwards to Siddick Junction was opened. The service was extended to run to and from Siddick and an extra train was added, with

  • three up trains a day, leaving Moor Row at 07:40, 10:12 and 14:45, taking 30 minutes to Workington and an extra four to proceed to Siddick, where connections were made with the MCR.
  • Down trains left Siddick at 08:45, 12:22 and 17:00[12]

By 1922 the service reached its high water mark, with:

  • five up trains a day from Moor Row through to Siddick, leaving Moor Row at 07:20, 09:50, 13:15, 16:50 and 1820.
  • one train Mondays to Fridays Only from Moor Row to Workington, leaving at 13:45 and also calling at Moresby Junction Halt, making that halt qualify as a publicly advertised passenger station
  • one Saturdays Only train leaving Cleator Moor (NB not from Moor Row) at 12:50 for Workington
  • one Saturdays Only train leaving Moor Row at 19:35 for Workington

There was one fewer Down train, as the 09:50 Up was provided to give a connection at Siddick with a fast MCR train to Carlisle with connections beyond.[13]

Although not serving Cleator Moor, two Saturdays Only trains left Oatlands at 16:05 and 21:35 for Workington, calling at Distington and High Harrington, with balancing workings leaving Workington at 15:30 and 21:00.

There were also trains using the Lowca Light Railway plying between Lowca and Workington, but they served no "pure" C&WJR stations other than Workington Central.[14]

As with advertised passenger trains, in 1920 workmen's trains ran on the company's three southern routes:

The situation in 1922 was similar.[13]

The 1920 Working Time Table shows relatively few Goods trains, with just one a day in each direction booked to call at Cleator Moor West.

Mineral traffic was an altogether different matter, dwarfing all other traffic in volume, receipts and profits. The key source summarises it "...the 'Track of the Ironmasters' ran like a main traffic artery through an area honeycombed with mines, quarries and ironworks."[16] The associated drama was all the greater because all the company's lines abounded with steep inclines[17] and sharp curves,[18] frequently requiring banking. The saving grace was that south of Workington at least, most gradients favoured loaded trains. During the First World War especially, the company ran "Double Trains", akin to North American practice, with two mineral trains coupled together and a banking engine behind, i.e. locomotive-wagons-guards van-locomotive-wagons-guards van-banker. Such trains worked regularly between Distington and Cleator Moor,[19] though the practice was discontinued after dark from 1 April 1918.[20]

The workings at Cleator Moor exemplified the line's role. The station was next to a branch to Cleator Moor's dominant ironworks run by the Workington Haematite Iron Company. Iron ore arrived there from the east, via the rival Whitehaven, Cleator and Egremont Railway. Coke arrived via the C&WR branch, then Pig iron then went out the same way and headed north along the C&WR, typically bound for Scotland,[21] either via Carlisle or via the Solway Viaduct.

Like any business tied to one or few industries, the railway was at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when 1,644,514 tons of freight were handled.[22] Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570.[23]

Rundown and closure

The high water mark for tonnage was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected in 1919 and the Admiralty saving the northern extension in 1937 by establishing an armaments depot at Broughton.[24]

Cleator Moor West closed on 13 April 1931 when normal passenger traffic ended along the line. Diversions and specials, for example to football matches,[25] made use of the line, but it was not easy to use as a through north-south route because all such trains would have to reverse at Moor Row or Corkickle.[26]

An enthusiasts' special ran through on 6 September 1954, the only to do so using main line passenger stock. The next such train to traverse any C&WJR metals did so in 1966 at the north end of the line, three years after the line through Cleator Moor closed.[27]

Afterlife

By 1981 the station had been demolished and the cutting had largely been filled in.[28] By 2008 the trackbed had become a public cycleway.[29]

Preceding station   Disused railways   Following station
Keekle Colliers' Platform
Line and station closed
  Cleator and Workington Junction Railway   Moor Row
Line and station closed

See also

References

  1. McGowan Gradon 2004, p. 15.
  2. Butt 1995, p. 63.
  3. McGowan Gradon 2004, p. 59.
  4. Smith & Turner 2012, Map 26.
  5. Jowett 1989, Map 36.
  6. Anderson 2002, p. 309.
  7. Anderson 2002, p. 313.
  8. Marshall 1981, p. 117.
  9. Anderson 2002, p. 314.
  10. McGowan Gradon 2004, pp. 40 & 42.
  11. McGowan Gradon 2004, p. 51.
  12. McGowan Gradon 2004, p. 38.
  13. McGowan Gradon 2004, p. 39.
  14. Bradshaw 1985, p. 595.
  15. Haynes 1920, pp. 8-13.
  16. McGowan Gradon 2004, p. 41.
  17. McGowan Gradon 2004, p.64, Gradient Diagrams.
  18. McGowan Gradon 2004, p. 25.
  19. McGowan Gradon 2004, Front cover & pp.42-3.
  20. Haynes 1920, p. 5.
  21. McGowan Gradon 2004, p. 40.
  22. McGowan Gradon 2004, p. 50.
  23. Suggitt 2008, p. 65.
  24. McGowan Gradon 2004, pp. 58-59.
  25. McGowan Gradon 2004, p. 52.
  26. Marshall 1981, p. 118.
  27. McGowan Gradon 2004, pp. 60-1.
  28. Marshall 1981, p. 165.
  29. Suggitt 2008, p. 68.

Sources

  • Anderson, Paul (April 2002). Hawkins, Chris (ed.). "Dog in the Manger? The Track of the Ironmasters". British Railways Illustrated. Clophill: Irwell Press Ltd. 11 (7).CS1 maint: ref=harv (link)
  • Bradshaw, George (1985) [July 1922]. Bradshaw's General Railway and Steam Navigation guide for Great Britain and Ireland: A reprint of the July 1922 issue. Newton Abbot: David and Charles. ISBN 978-0-7153-8708-5. OCLC 12500436.
  • Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-508-7. OCLC 60251199.
  • Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-086-0. OCLC 22311137.
  • Haynes, Jas. A. (April 1920). Cleator & Workington Junction Railway Working Time Table. Central Station, Workington: Cleator and Workington Junction Railway.CS1 maint: ref=harv (link)
  • McGowan Gradon, W. (2004) [1952]. The Track of the Ironmasters: A History of the Cleator and Workington Junction Railway. Grange-over-Sands: Cumbrian Railways Association. ISBN 0-9540232-2-6.CS1 maint: ref=harv (link)
  • Marshall, John (1981). Forgotten Railways: North West England. Newton Abbot: David & Charles. ISBN 0 7153 8003 6.CS1 maint: ref=harv (link)
  • Smith, Paul; Turner, Keith (2012). Railway Atlas Then and Now. Ian Allan Publishing. ISBN 978 0 7110 3695 6.CS1 maint: ref=harv (link)
  • Suggitt, Gordon (2008). Lost Railways of Cumbria (Railway Series). Newbury: Countryside Books. ISBN 978-1-84674-107-4.CS1 maint: ref=harv (link)

Further reading

  • British Railways Pre-Grouping Atlas And Gazetteer. Shepperton: Ian Allan Publishing. 1997 [1958]. ISBN 0-7110-0320-3.CS1 maint: ref=harv (link)
  • Atterbury, Paul (2009). Along Lost Lines. Newton Abbot: David & Charles. ISBN 0-7153-2706-2.CS1 maint: ref=harv (link)
  • Bairstow, Martin (1995). Railways In The Lake District. Martin Bairstow. ISBN 1-871944-11-2.CS1 maint: ref=harv (link)
  • Bowtell, Harold D. (1989). Rails through Lakeland: An Illustrated Journey of the Workington-Cockermouth-Keswick-Penrith Railway 1847-1972. Wyre, Lancashire: Silverling Publishing Ltd. ISBN 0-947971-26-2.CS1 maint: ref=harv (link)
  • Croughton, Godfrey; Kidner, Roger W.; Young, Alan (1982). Private and Untimetabled Railway Stations, Halts and Stopping Places X 43. Headington, Oxford: The Oakwood Press. ISBN 0 85361 281 1.CS1 maint: ref=harv (link)
  • Joy, David (1983). Lake Counties (Regional History of the Railways of Great Britain). Newton Abbot: David & Charles. ISBN 094653702X.CS1 maint: ref=harv (link)
  • Western, Robert (2001). The Cockermouth, Keswick and Penrith Railway OL113. Usk: Oakwood Press. ISBN 0-85361-564-0.CS1 maint: ref=harv (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.