Bury Line

The Bury Line is a tram line of the Manchester Metrolink running from Manchester city centre to Bury in Greater Manchester. Originally a railway line, it was, along with the Altrincham Line, converted into a tram line during 1991–92, as part of the first phase of the Metrolink system.

Bury Line
Overview
TypeTram/Light rail
SystemManchester Metrolink
LocaleManchester
Bury
TerminiManchester Piccadilly
Bury Interchange
Stations10
Operation
Opened6 April 1992
CharacterConverted heavy rail line
Rolling stockM5000
Technical
Line length9.9 miles (15.9 km)
Track gauge4 ft 8 12 in (1,435 mm) standard gauge
Electrification750 volts DC overhead
Operating speed50 mph (80km/h)
Route map

Bury
Radcliffe
River Irwell
Whitefield
Besses o' th' Barn
M60
Prestwich
Heaton Park
Bowker Vale
Crumpsall
Abraham Moss
to Queens Road Depot
Queens Road
Manchester Victoria 
to Altrincham & Piccadilly

The line runs entirely on an old railway alignment without any street running. It runs north from Manchester Victoria and connects the suburbs of Cheetham Hill, Prestwich, Whitefield and Radcliffe. The entire route from Victoria to Bury is roughly 10 miles (16 km) long. Two services travel along the line, both starting at Bury, and terminating at Altrincham and Piccadilly respectively.

History

The line was originally heavy rail. The first part of what is now the Bury Line was opened by the East Lancashire Railway (ELR) in 1846, From Manchester Victoria to Bury Bolton Street via Salford, Clifton Junction and Radcliffe, continuing north from Bury to Rawtenstall. The ELR was absorbed into the Lancashire and Yorkshire Railway (L&YR) in 1859.[1]

The Bury Line shortly before conversion to Metrolink, operated by a Class 504 unit.

The second part was opened in 1879. In order to connect the growing suburbs of Cheetham Hill, Prestwich and Whitefield, the L&YR obtained an act to construct a new line from Manchester in 1872 to the original ELR line at Radcliffe. Construction began in 1876 and was completed in 1879. Originally the line had only five intermediate stations at Crumpsall, Heaton Park, Prestwich, Whitefield and Radcliffe. Three more stations were added later: Woodlands Road, Bowker Vale and Besses o' th' Barn.[1]

In response to competition from trams, the line was electrified in 1916 using a unique 1,200 volt side-contact third rail system, which remained in operation until the line was converted to Metrolink operation in 1991.[1] From 1959 until 1991, the line was operated by Class 504 EMUs. In 1961 they were scheduled to cover the 9¾ miles from Bolton Street to Victoria in 23 minutes and take 24 minutes in the other direction, running at 20 minute intervals for most of the day, but half-hourly on Sundays.[2] With an extra stop, the trams take 23 minutes uphill and 24 minutes downhill.[3]

In August 1953, the Irk Valley Junction rail crash occurred on the line near Manchester Victoria, resulting in ten deaths and 58 injuries. It was caused by an electric train overrunning a danger signal which collided with a steam train, resulting in the front carriage of the electric train crashing into the River Irk.[4]

The original Bury Bolton Street station was closed in 1980 and replaced by the new, more conveniently located Bury Interchange. The original Bolton Street station is now part of the East Lancashire Railway heritage railway.[1]

The Bury line was identified by transport planners in the 1980s as one of the local railway lines in the Greater Manchester area which was used mostly for local traffic, and could therefore be split off from the main line network and converted to light-rail operation. It was chosen for conversion as part of the first phase of the Metrolink, along with the Manchester Piccadilly to Altrincham Line to the south of Manchester: The two previously unconnected lines were to be linked together by a new street-running line across Manchester city-centre, which included a branch to Manchester Piccadilly railway station. Trams on the Bury Line would thus continue from Victoria station into the city-centre, to either Altrincham or Piccadilly via a new exit into the streets to the south.[5]

A T-68 tram emerging into the streets from Victoria railway station in June 1992.

Railway operations ended on 17 August 1991, in order for the line to be converted to Metrolink operation.[1] This mostly entailed removing the old third rail system and replacing it with a 750 volt DC overhead line system. Available funding only allowed for minimum upgrades to be made, and so most of the infrastructure such as the stations and track were changed little.[6]

The line became the first Metrolink line to open for business on 6 April 1992, initially between Bury and Victoria, it then opened to Altrincham on 15 June, and then Piccadilly on 20 July 1992.[7]

One of the original stations Woodlands Road was closed in 2013, after two new stations, (Abraham Moss and Queens Road) were opened nearby.[8]

Services

As of February 2017, trams between Bury and Manchester run as follows:[9]

  • A 12-minute interval service from Bury to Altrincham. Running during Monday to Saturday daytimes and early evenings only.
  • A 12-minute interval service From Bury to Piccadilly. Running during all operating hours.

These two services combined mean that trams between Bury and Manchester operate every six minutes during Monday to Saturday daytimes, and every 12 minutes during evenings and Sundays. During evenings, trams run to Piccadilly only, so journeys to Altrincham require a change of tram at Piccadilly Gardens.

Rolling stock

All services are operated by M5000 trams. Between 1992 and 2009, the line was operated by the original fleet of 26 T-68 trams. From 2009 the new fleet of M5000 trams was introduced, and these replaced the original T-68 trams. which were withdrawn from service during 2012–14.[10]

Route map

See also

  • Bury to Holcombe Brook Line

References

  1. Hindle, Paul. "Manchester Victoria to Bury: an historical trip on Metrolink" (PDF). Manchester Geographical Society. Retrieved 10 January 2015.
  2. Passenger Services Timetable. British Railways. 1961. pp. 561–568.
  3. "Yellow Line - Piccadilly - Bury – Metrolink – bustimes.org". bustimes.org. Retrieved 22 May 2020.
  4. "Timeline: Fatal UK rail crashes". BBc News. Retrieved 5 February 2016.
  5. "Metrolink History 1". Light Rail Transit Association. Retrieved 9 January 2016.
  6. "Metrolink History 1". Light Rail Transit Association. Retrieved 10 January 2015.
  7. "An Introduction to Metrolink". Light Rail Transit Association. Retrieved 10 January 2015.
  8. "New Queens Road Metrolink stop to open". Transport for Greater Manchester. Archived from the original on 15 December 2013. Retrieved 10 January 2015.
  9. "Metrolink – Tram Times – Abraham Moss". Metrolink. Retrieved 30 August 2016.
  10. "T68 and T68a — Metrolink phase 1 and 2". Light Rail Transit Association. Retrieved 3 January 2016.

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.